Share This Listing

Message

941 characters remaining

Hmm, there seems to have been an error sending your message. Please try again.

Your email has been sent.

Still interested?

Contact the brokers for more information about this property

Sublease Highlights

  • Exceptional location within Austin’s technology corridor, providing easy access to MoPac and US Highway 183 for seamless regional connectivity.
  • Scenic environment with Quarry Lake views and access to a hike and bike trail, creating a serene campus setting for employees.
  • Outdoor tenant courtyard with seating and grilling stations enhances workplace experience and encourages collaboration.
  • Surrounded by The Domain and The Arboretum, offering immediate proximity to premier shopping, dining, and lifestyle amenities.
  • Includes modern office advantages such as structured parking, full fiber optic connectivity, on-site fitness center and showers, and secured building
  • Environmentally conscious building with Gold LEED certification, emphasizing sustainability and resource efficiency.

All Available Space(1)

Display Rental Rate as

  • Space
  • Size
  • Term
  • Rental Rate
  • Space Use
  • Build-Out
  • Available
  • 1st Floor, Ste 150
  • 2,922-6,502 SF
  • Jan 2031
  • Upon Request Upon Request Upon Request Upon Request
  • Office
  • -
  • 30 Days

2,922 SF available for Sublease with 30-day notice. The suite is contiguous with suite 130 on a direct basis to get a total of 6,502 SF

  • Sublease space available from current tenant
  • Fits 8 - 53 People
  • Mostly Open Floor Plan Layout
  • Space is in Excellent Condition
Space Size Term Rental Rate Space Use Build-Out Available
1st Floor, Ste 150 2,922-6,502 SF Jan 2031 Upon Request Upon Request Upon Request Upon Request Office - 30 Days

1st Floor, Ste 150

Size
2,922-6,502 SF
Term
Jan 2031
Rental Rate
Upon Request Upon Request Upon Request Upon Request
Space Use
Office
Build-Out
-
Available
30 Days

1st Floor, Ste 150

Size 2,922-6,502 SF
Term Jan 2031
Rental Rate Upon Request
Space Use Office
Build-Out -
Available 30 Days

2,922 SF available for Sublease with 30-day notice. The suite is contiguous with suite 130 on a direct basis to get a total of 6,502 SF

  • Sublease space available from current tenant
  • Mostly Open Floor Plan Layout
  • Fits 8 - 53 People
  • Space is in Excellent Condition

Features and Amenities

  • Controlled Access
  • Courtyard
  • Property Manager on Site
  • Wheelchair Accessible
  • Central Heating
  • Wi-Fi
  • Air Conditioning
  • Smoke Detector

Property Facts

Building Type
Office
Year Built/Renovated
1997/2020
LoopNet Rating
4 Star
Building Height
3 Stories
Building Size
127,287 SF
Building Class
A
Typical Floor Size
42,328 SF
Unfinished Ceiling Height
12’
Parking
150 Surface Parking Spaces
450 Covered Parking Spaces

Select Tenants

  • Floor
  • Tenant Name
  • Industry
  • 1st
  • Carollo Engineers
  • Professional, Scientific, and Technical Services
  • 1st
  • KNIME, Inc.
  • Professional, Scientific, and Technical Services
  • 3rd
  • Macmillan Learning
  • Information
  • 2nd
  • Microsoft Corporation
  • Information
  • 1st
  • Pierpont Communications
  • Professional, Scientific, and Technical Services
  • 1st
  • Retirement Planners of America
  • Finance and Insurance
  • 3rd
  • Watermark
  • Educational Services
  • 2nd
  • WeWork
  • Real Estate

Sustainability

LEED Certified
Gold
LEED certification is a globally recognized symbol of sustainability achievement.
Energy Star Certified
97
ENERGY STAR certified buildings save energy and help protect the environment.

Sustainability

LEED Certification Developed by the U.S. Green Building Council (USGBC), the Leadership in Energy and Environmental Design (LEED) is a green building certification program focused on the design, construction, operation, and maintenance of green buildings, homes, and neighborhoods, which aims to help building owners and operators be environmentally responsible and use resources efficiently. LEED certification is a globally recognized symbol of sustainability achievement and leadership. To achieve LEED certification, a project earns points by adhering to prerequisites and credits that address carbon, energy, water, waste, transportation, materials, health and indoor environmental quality. Projects go through a verification and review process and are awarded points that correspond to a level of LEED certification: Platinum (80+ points) Gold (60-79 points) Silver (50-59 points) Certified (40-49 points)

ENERGY STAR® Energy Star is a program run by the U.S. Environmental Protection Agency (EPA) and U.S. Department of Energy (DOE) that promotes energy efficiency and provides simple, credible, and unbiased information that consumers and businesses rely on to make well-informed decisions. Thousands of industrial, commercial, utility, state, and local organizations partner with the EPA to deliver cost-saving energy efficiency solutions that protect the climate while improving air quality and protecting public health. The Energy Star score compares a building’s energy performance to similar buildings nationwide and accounts for differences in operating conditions, regional weather data, and other important considerations. Certification is given on an annual basis, so a building must maintain its high performance to be certified year to year. To be eligible for Energy Star certification, a building must earn a score of 75 or higher on EPA’s 1 – 100 scale, indicating that it performs better than at least 75 percent of similar buildings nationwide. This 1 – 100 Energy Star score is based on the actual, measured energy use of a building and is calculated within EPA’s Energy Star Portfolio Manager tool.

Moderately walkable
60/100
Moderately drivable
70/100
Limited public transit
20/100
Fairly bikeable
50/100
  • Listing ID: 40147448

  • Date on Market: 2026-04-14

  • Last Updated:

  • Address: 10900 Stonelake Blvd, Austin, TX 78759

Link copied
Your LoopNet account has been created!

Please Share Your Feedback

We welcome any feedback on how we can improve LoopNet to better serve your needs.
X
{{ getErrorText(feedbackForm.starRating, "rating") }}
255 character limit ({{ remainingChars() }} charactercharacters remainingover)
{{ getErrorText(feedbackForm.msg, "rating") }}
{{ getErrorText(feedbackForm.fname, "first name") }}
{{ getErrorText(feedbackForm.lname, "last name") }}
{{ getErrorText(feedbackForm.phone, "phone number") }}
{{ getErrorText(feedbackForm.phonex, "phone extension") }}
{{ getErrorText(feedbackForm.email, "email address") }}