Your email has been sent.
Park Facts
| Total Space Available | 30,102 SF | Park Type | Office Park |
| Total Space Available | 30,102 SF |
| Park Type | Office Park |
All Available Spaces(4)
Display Rental Rate as
- Space
- Size
- Term
- Rental Rate
- Space Use
- Condition
- Available
- Listed lease rate plus proportional share of electrical cost
- Partially Built-Out as Standard Office
- Listed lease rate plus proportional share of electrical cost
- Partially Built-Out as Standard Office
- Listed lease rate plus proportional share of electrical cost
- Office intensive layout
- Fully Built-Out as Standard Office
- Space is in Excellent Condition
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| 1st Floor, Ste 100 | 12,829 SF | Negotiable | $87.87 CAD/SF/YR $7.32 CAD/SF/MO $1,127,316 CAD/YR $93,943 CAD/MO | Office | Partial Build-Out | 2026-09-01 |
| 1st Floor, Ste 150 | 5,686 SF | Negotiable | $87.87 CAD/SF/YR $7.32 CAD/SF/MO $499,643 CAD/YR $41,637 CAD/MO | Office | Partial Build-Out | 2026-09-01 |
| 2nd Floor, Ste 250 | 8,546 SF | Negotiable | $87.87 CAD/SF/YR $7.32 CAD/SF/MO $750,958 CAD/YR $62,580 CAD/MO | Office | Full Build-Out | 2027-02-01 |
12255 El Camino Real - 1st Floor - Ste 100
12255 El Camino Real - 1st Floor - Ste 150
12255 El Camino Real - 2nd Floor - Ste 250
- Space
- Size
- Term
- Rental Rate
- Space Use
- Condition
- Available
This is a Flex Workspace+tm suite : Yes Furnished
- Listed lease rate plus proportional share of electrical cost
- Mostly Open Floor Plan Layout
- Fully Built-Out as Standard Office
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| 2nd Floor, Ste 240 | 3,041 SF | Negotiable | $87.87 CAD/SF/YR $7.32 CAD/SF/MO $267,220 CAD/YR $22,268 CAD/MO | Office | Full Build-Out | 2026-11-01 |
12265 El Camino Real - 2nd Floor - Ste 240
12255 El Camino Real - 1st Floor - Ste 100
| Size | 12,829 SF |
| Term | Negotiable |
| Rental Rate | $87.87 CAD/SF/YR |
| Space Use | Office |
| Condition | Partial Build-Out |
| Available | 2026-09-01 |
- Listed lease rate plus proportional share of electrical cost
- Partially Built-Out as Standard Office
12255 El Camino Real - 1st Floor - Ste 150
| Size | 5,686 SF |
| Term | Negotiable |
| Rental Rate | $87.87 CAD/SF/YR |
| Space Use | Office |
| Condition | Partial Build-Out |
| Available | 2026-09-01 |
- Listed lease rate plus proportional share of electrical cost
- Partially Built-Out as Standard Office
12255 El Camino Real - 2nd Floor - Ste 250
| Size | 8,546 SF |
| Term | Negotiable |
| Rental Rate | $87.87 CAD/SF/YR |
| Space Use | Office |
| Condition | Full Build-Out |
| Available | 2027-02-01 |
- Listed lease rate plus proportional share of electrical cost
- Fully Built-Out as Standard Office
- Office intensive layout
- Space is in Excellent Condition
12265 El Camino Real - 2nd Floor - Ste 240
| Size | 3,041 SF |
| Term | Negotiable |
| Rental Rate | $87.87 CAD/SF/YR |
| Space Use | Office |
| Condition | Full Build-Out |
| Available | 2026-11-01 |
This is a Flex Workspace+tm suite : Yes Furnished
- Listed lease rate plus proportional share of electrical cost
- Fully Built-Out as Standard Office
- Mostly Open Floor Plan Layout
Select Tenants at This Property
- Floor
- Tenant Name
- Industry
- 1st
- BT Group Inc
- Information
- 1st
- California Bank of Commerce, N.A.
- Finance and Insurance
- 1st
- Centura Wealth Advisory
- -
- 1st
- Eversheds Sutherland
- -
- 2nd
- Kilpatrick Townsend
- -
- 1st
- Lisa Golden
- -
- 2nd
- Mindbody
- Information
- 3rd
- ORIC Pharmaceuticals
- Professional, Scientific, and Technical Services
- 1st
- Sally Schoeffel & Elizabeth Callaway
- -
- 2nd
- Verition
- Professional, Scientific, and Technical Services
Sustainability
Sustainability
LEED Certification Developed by the U.S. Green Building Council (USGBC), the Leadership in Energy and Environmental Design (LEED) is a green building certification program focused on the design, construction, operation, and maintenance of green buildings, homes, and neighborhoods, which aims to help building owners and operators be environmentally responsible and use resources efficiently. LEED certification is a globally recognized symbol of sustainability achievement and leadership. To achieve LEED certification, a project earns points by adhering to prerequisites and credits that address carbon, energy, water, waste, transportation, materials, health and indoor environmental quality. Projects go through a verification and review process and are awarded points that correspond to a level of LEED certification: Platinum (80+ points) Gold (60-79 points) Silver (50-59 points) Certified (40-49 points)
Presented by
Paseo Del Mar | San Diego, CA 92130
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.












