Log In/Sign Up
Your email has been sent.
HIGHLIGHTS
- 18' Clear Height
- .33/3000 Sprinkler Density
- Excellent Access to Hwy. 50, I-5, and I-80 and 5 Minutes from Downtown Sacramento
- 277/480 Volt | 3 Phase Power
- Dock and Grade Level Loading
FEATURES
Clear Height
18’
Column Spacing
50’ x 38’
Drive In Bays
2
Exterior Dock Doors
2
ALL AVAILABLE SPACE(1)
Display Rental Rate as
- SPACE
- SIZE
- TERM
- RENTAL RATE
- SPACE USE
- CONDITION
- AVAILABLE
- Lease rate does not include utilities, property expenses or building services
- 1 Loading Dock
- Includes 340 SF of dedicated office space
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| 1st Floor - 100 | 5,625 SF | Negotiable | $12.40 CAD/SF/YR $1.03 CAD/SF/MO $69,726 CAD/YR $5,811 CAD/MO | Industrial | Partial Build-Out | 2026-12-31 |
1st Floor - 100
| Size |
| 5,625 SF |
| Term |
| Negotiable |
| Rental Rate |
| $12.40 CAD/SF/YR $1.03 CAD/SF/MO $69,726 CAD/YR $5,811 CAD/MO |
| Space Use |
| Industrial |
| Condition |
| Partial Build-Out |
| Available |
| 2026-12-31 |
1st Floor - 100
| Size | 5,625 SF |
| Term | Negotiable |
| Rental Rate | $12.40 CAD/SF/YR |
| Space Use | Industrial |
| Condition | Partial Build-Out |
| Available | 2026-12-31 |
- Lease rate does not include utilities, property expenses or building services
- Includes 340 SF of dedicated office space
- 1 Loading Dock
WAREHOUSE FACILITY FACTS
Building Size
11,250 SF
Lot Size
0.63 AC
Year Built
2002
Construction
Reinforced Concrete
Sprinkler System
Wet
Water
City
Sewer
City
Gas
Natural
Power Supply
Volts: 277-480 Phase: 3
Zoning
M-1 - Industrial
SELECT TENANTS
- FLOOR
- TENANT NAME
- INDUSTRY
- 1st
- Big West Distribution
- Wholesaler
- 1st
- WIT Logistics
- Professional, Scientific, and Technical Services
1 of 8
VIDEOS
MATTERPORT 3D EXTERIOR
MATTERPORT 3D TOUR
PHOTOS
STREET VIEW
STREET
MAP
Presented by
Bldg 5 | 1275 Triangle Ct
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.




