Your email has been sent.
PARK HIGHLIGHTS
- Building 2 is available for immediate occupancy (as of October 2025).
- Located in established Highway 290 industrial corridor in Spartanburg County
- ±100 million consumers accessible within a one-day truck drive
- three subdivisible buildings (minimum 30,000 SF)
- I-85 less than one mile away
- Building 2 offers flexible, subdivisible space ranging from ±30,000 SF to ±141,480 SF, tailored to meet the needs of your business
PARK FACTS
| Total Space Available | 478,440 SF | Park Type | Industrial Park |
| Min. Divisible | 30,000 SF |
| Total Space Available | 478,440 SF |
| Min. Divisible | 30,000 SF |
| Park Type | Industrial Park |
ALL AVAILABLE SPACES(3)
Display Rental Rate as
- SPACE
- SIZE
- TERM
- RENTAL RATE
- SPACE USE
- CONDITION
- AVAILABLE
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| 1st Floor | 30,000-141,480 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request | Industrial | - | Now |
156 Tyger River Dr - 1st Floor
- SPACE
- SIZE
- TERM
- RENTAL RATE
- SPACE USE
- CONDITION
- AVAILABLE
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| 1st Floor | 30,000-140,400 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request | Industrial | - | 2026-12-31 |
03 Tyger River Dr - 1st Floor
- SPACE
- SIZE
- TERM
- RENTAL RATE
- SPACE USE
- CONDITION
- AVAILABLE
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| 1st Floor | 30,000-196,560 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request | Industrial | - | 2027-12-01 |
04 Tyger River Dr - 1st Floor
156 Tyger River Dr - 1st Floor
| Size | 30,000-141,480 SF |
| Term | Negotiable |
| Rental Rate | Upon Request |
| Space Use | Industrial |
| Condition | - |
| Available | Now |
03 Tyger River Dr - 1st Floor
| Size | 30,000-140,400 SF |
| Term | Negotiable |
| Rental Rate | Upon Request |
| Space Use | Industrial |
| Condition | - |
| Available | 2026-12-31 |
04 Tyger River Dr - 1st Floor
| Size | 30,000-196,560 SF |
| Term | Negotiable |
| Rental Rate | Upon Request |
| Space Use | Industrial |
| Condition | - |
| Available | 2027-12-01 |
PARK OVERVIEW
This industrial park features a fully leased Building 1, while Building 2 is available for immediate occupancy as of October 2025. An additional ±336,580 square feet of speculative facilities are planned for future construction in Buildings 3 and 4. This presents an excellent opportunity for highly efficient, subdivisible distribution space along the well-established and accessible Hwy 290 industrial corridor in Spartanburg County. The surrounding Hillside Industrial Park business district is known for its strategic access routes to major interstate I-85 less than one mile away and an easy drive to the industrial epicenter of Greenville-Spartanburg at the Inland Port in Greer along Hwy 290. Hillside is also home to a flourishing manufacturing and automotive supplier base with BMW’s headquarters conveniently located only one exit down I-85. The location will suit a wide range of manufacturing or distribution users with subdivisible (from ±30,000 SF) and "to suit" options.
Presented by
Hillside Commerce Center | Duncan, SC 29334
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.





