Log In/Sign Up
Your email has been sent.
Highlights
- Build to Suit
- Highway access
- Flexible size spaces
Features
Clear Height
28’
Drive In Bays
3
Exterior Dock Doors
6
Standard Parking Spaces
30
All Available Space(1)
Display Rental Rate as
- Space
- Size
- Term
- Rental Rate
- Space Use
- Build-Out
- Available
BUILD TO SUIT. Up to 150,000 SF with truck docks and 3 Phase Power. Warehouse or Manufacturing space. Great location just off 10th West/Hwy 252 Logan UT.
- Lease rate does not include utilities, property expenses or building services
- Central Heating System
- Emergency Lighting
- New Build to Suit Warehouse/Manufacturing space
- Space is in Excellent Condition
- Private Restrooms
- Yard
- 5 acre site
| Space | Size | Term | Rental Rate | Space Use | Build-Out | Available |
| 1st Floor | 100,000-150,000 SF | 10-20 Years | $16.53 CAD/SF/YR $1.38 CAD/SF/MO $2,479,500 CAD/YR $206,625 CAD/MO | Industrial | Spec Suite | TBD |
1st Floor
| Size |
| 100,000-150,000 SF |
| Term |
| 10-20 Years |
| Rental Rate |
| $16.53 CAD/SF/YR $1.38 CAD/SF/MO $2,479,500 CAD/YR $206,625 CAD/MO |
| Space Use |
| Industrial |
| Build-Out |
| Spec Suite |
| Available |
| TBD |
1 of 2
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1st Floor
| Size | 100,000-150,000 SF |
| Term | 10-20 Years |
| Rental Rate | $16.53 CAD/SF/YR |
| Space Use | Industrial |
| Build-Out | Spec Suite |
| Available | TBD |
BUILD TO SUIT. Up to 150,000 SF with truck docks and 3 Phase Power. Warehouse or Manufacturing space. Great location just off 10th West/Hwy 252 Logan UT.
- Lease rate does not include utilities, property expenses or building services
- Space is in Excellent Condition
- Central Heating System
- Private Restrooms
- Emergency Lighting
- Yard
- New Build to Suit Warehouse/Manufacturing space
- 5 acre site
Property Overview
BUILD TO SUIT. Up to 150,000 SF just off 10th West/Hwy 252 Logan UT. Multiple Truck Docks and Ground Level Doors. 480 V, Three Phase Power. Multiple access points. Security fencing.
Industrial Facility Facts
Building Size
150,000 SF
Lot Size
5.11 AC
Construction
Reinforced Concrete
Sprinkler System
Dry
Lighting
Halide
Water
City
Sewer
City
Heating
Gas
Gas
Natural
Power Supply
Amps: 200-400 Volts: 240-480 Phase: 3 Wire: 4
Zoning
Industrial - Industrial Park
1 1
Fairly walkable
40/100
Very drivable
80/100
Limited public transit
30/100
Fairly bikeable
40/100
1 of 3
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1 of 1
Presented by
HRI | 1550 850 W W
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.





