Log In/Sign Up
Your email has been sent.
16803 San Bernardino Ave
Fontana, CA 92335
MONTEREY VILLAS DEVELOPMENT SITE · Land For Sale
·
3.12 AC

INVESTMENT HIGHLIGHTS
- A rare opportunity to acquire a 100-unit garden style apartment development project with complete site plans
- 3-parcel property offers ±3.12 acres, pre-existing construction, variety of units positioning it as an ideal candidate for future rental income
- Located in the growing city of Fontana, CA,
EXECUTIVE SUMMARY
The site is zoned multifamily residential vacant
land and slated for construction of a 100-U
garden apartment complex known as The
Monterey Villas, located at the intersection of San
Bernardino and Sierra Avenues within proximity
of the Kaiser-Permanente hospital & medical
complex. It consists of three separate parcels
combined to accommodate two 3-story buildings
and one 4-story building with elevator, grade
level covered garage and covered and uncovered
surface parking spaces, pool & spa, and a fitness
and community center. The original size of the
complex was 88-units, but with the entitlement
package that comes with the project number of
units was increased to 100 with the proviso that
12 of the units would be available at affordable
rental rates. The project comes with a complete
set of construction, structural, mechanical and
landscaping plans package. The entitlements
are still valid because construction has already
begun even though it is currently on hold. The
partially constructed project—the foundation of
the largest building is already in place. At the time
of stoppage of construction were in excess of
$1M, with some of the major expenditures, details
on the expenditures are provided upon request.
The obvious advantages of the acquisition of
the project at this stage of construction, besides
affording substantial cost savings, plus a builtin
entitlement package, are the opportunity to
complete a 100-unit development on the site
quickly--as opposed to coming in with new
set of plans which would lead to an approval
process that would take considerable time. The
current size of the site allows 88 units without the
entitlement package. A new application for a new
entitlement package would obviously result in
delays getting the approval for additional units,
if at all. Instead, given the City’s immediate need
for additional housing, the project would be fasttracked
if it remains essentially the same since
the development has already been approved
and ready for building permits except for code
updates. That would result in considerable
development time and architectural and other
cost savings. The existing plans could be brought
up to code very quickly with the present architect
and structural engineering firm, and with a soils
report, application for a new construction permit
can be started immediately.
land and slated for construction of a 100-U
garden apartment complex known as The
Monterey Villas, located at the intersection of San
Bernardino and Sierra Avenues within proximity
of the Kaiser-Permanente hospital & medical
complex. It consists of three separate parcels
combined to accommodate two 3-story buildings
and one 4-story building with elevator, grade
level covered garage and covered and uncovered
surface parking spaces, pool & spa, and a fitness
and community center. The original size of the
complex was 88-units, but with the entitlement
package that comes with the project number of
units was increased to 100 with the proviso that
12 of the units would be available at affordable
rental rates. The project comes with a complete
set of construction, structural, mechanical and
landscaping plans package. The entitlements
are still valid because construction has already
begun even though it is currently on hold. The
partially constructed project—the foundation of
the largest building is already in place. At the time
of stoppage of construction were in excess of
$1M, with some of the major expenditures, details
on the expenditures are provided upon request.
The obvious advantages of the acquisition of
the project at this stage of construction, besides
affording substantial cost savings, plus a builtin
entitlement package, are the opportunity to
complete a 100-unit development on the site
quickly--as opposed to coming in with new
set of plans which would lead to an approval
process that would take considerable time. The
current size of the site allows 88 units without the
entitlement package. A new application for a new
entitlement package would obviously result in
delays getting the approval for additional units,
if at all. Instead, given the City’s immediate need
for additional housing, the project would be fasttracked
if it remains essentially the same since
the development has already been approved
and ready for building permits except for code
updates. That would result in considerable
development time and architectural and other
cost savings. The existing plans could be brought
up to code very quickly with the present architect
and structural engineering firm, and with a soils
report, application for a new construction permit
can be started immediately.
PROPERTY FACTS
| Sale Type | Investment | Property Subtype | Residential |
| No. Lots | 1 | Proposed Use | Multifamily |
| Property Type | Land | Total Lot Size | 3.12 AC |
| Sale Type | Investment |
| No. Lots | 1 |
| Property Type | Land |
| Property Subtype | Residential |
| Proposed Use | Multifamily |
| Total Lot Size | 3.12 AC |
1 LOT AVAILABLE
Lot
| Price | $3,920,517 CAD | Lot Size | 3.12 AC |
| Price Per AC | $1,256,575.97 CAD |
| Price | $3,920,517 CAD |
| Price Per AC | $1,256,575.97 CAD |
| Lot Size | 3.12 AC |
±3.12 Acres Zoned Multifamily Residential Vacant Land Situated in Fontana, California
DESCRIPTION
The proximity to major employers, freeways, southern California, and beyond make this a strong location which will allow developer to capture the growing need for housing. The current zoning allows for a multifamily development.
1 of 2
VIDEOS
MATTERPORT 3D EXTERIOR
MATTERPORT 3D TOUR
PHOTOS
STREET VIEW
STREET
MAP
