Your email has been sent.
1701 S State Line - 150 MW APPROVED POWER CAPACITY ON 22 AC 22 Acres of Commercial Land in Hermitage, PA 16161



INVESTMENT HIGHLIGHTS
- 22 AC OF HEAVY INDUSTRIAL ZONED LAND APPROVED FOR 150 MW OF POWER CAPACITY
- TRANSMISSION LOAD STUDY COMPLETED BY FIRST ENERGY
- FIBER ACCESSIBLE FOR HYPER SCALE DATA CENTER DEVELOPMENT
- STRATEGIC LOCATION FOR A VARIETY OF USES // EASY ACCESS TO I-80 & OHIO SR-82
- IDEAL BITCOIN MINING // HOSTING SITE – UTILITY SUPPORTED & APPROVED
- FLEXIBLE DEAL STRUCTURE THROUGH A MULTITUDE OF CREATIVE CONSTRCUTS
PROPERTY FACTS
1 LOT AVAILABLE
Lot
| Lot Size | 22.00 AC |
| Lot Size | 22.00 AC |
SITE DETAILS: Situated on the PA and Ohio border with major manufactures & trucking terminals within 2 miles of the site. Highly accessible to I-80 & Ohio SR-82. The site is level with good drainage.
DESCRIPTION
OPPORTUNITY SUMMARY: 22 AC of raw land with Heavy Industrial Zoning in Hermitage, PA. Scalable robust power capacity makes this an ideal development site for heavy manufacturing, regional distribution center or data center. POWER: A Transmission Load Study has been completed by highly supportive Utility, FirstEnergy (Penn Electric), with approvals for 150 MW of power capacity and the ability for future expansion. The site is adjacent to a FirstEnergy substation to the north with a high-voltage hand-off of 138 KV. FirstEnergy is available to begin interconnection work upon remittance of deposit and is open financing this work. The Utility is not demanding any capacity requirements or must-takes, therefore the electrical infrastructure build can be phased-in [e.g., (3)-50 MW transformers]. Estimated power cost is $0.045 KWH, with contracted power capacity directly impacting pricing. Curtailment programs are available. Note: PA is deregulated state therefore power blocks can be purchased on open market. CONCURRENT TIMELINE ESTIMATE: Zoning & Permitting // ±3 months. Utility Interconnection // ±18-21 months. Earthwork & Electrical Infrastructure // ±12 months. Craning, Racking & Stacking, Electrification // ±2 months. Total Timeline // ±20-24 months. DEAL STRUCTURE CONSTRUCTS: Disposition // Land Lease // Built-To-Suite // Joint Venture
Presented by
1701 S State Line - 150 MW APPROVED POWER CAPACITY ON 22 AC
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.
