Your email has been sent.
18385 PA-287 - 3.25 MW POWER READY INDUSTRIAL SITE 12 Acres of Industrial Land in Tioga, PA 16946



INVESTMENT HIGHLIGHTS
- 3.25 MW OF IN-PLACE POWER CAPACITY (2.25 MW ENERGIZED)
- APPROVED FOR 100 MW OF POWER CAPACITY EXPANSION
- IDEAL BITCOIN MINING // HOSTING SITE – UTILITY APPROVED
- 12 AC OF HEAVY INDUSTRIAL ZONED LAND with LARGE POURED SLAB AREA
- TRANSMISSION LOAD STUDY COMPLETED BY FIRST ENERGY
PROPERTY FACTS
1 LOT AVAILABLE
Lot
| Lot Size | 12.00 AC |
| Lot Size | 12.00 AC |
DESCRIPTION
HEAVY POWER SITE FOR INDUSTRIAL, MANUFACTURING & BITCOIN MINING - TURNKEY & POWER READY!! Former Georgia-Pacific processing facility. Currently being operated as a bitcoin mining site with 2.25 MW of 3.25 MW energized. Transformers on for all 3.25 MW are on site and included in the sale. Estimated power cost is $0.045 KWH, billed as actual. POWER-LOAD CAPACITY EXPANSION: Fully Approved by FirstEnergy (Penn Electric) for 100 MW. Transmission Load Study has been completed. Utility Substation is 1.4 miles away. Utility will bring 115kV high-voltage line to the site. Utility has no must-takes, power billed as actual. PA is deregulated therefore power blocks can be purchased on open market. Estimated power cost is $0.045 KWH - contracted capacity will directly impact power cost.
Presented by
18385 PA-287 - 3.25 MW POWER READY INDUSTRIAL SITE
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.
