1910 Greenwood Rd 6.5 Acres of Industrial Land Offered at $14,997,862 CAD in Weatherford, TX 76088



Investment Highlights
- TCEQ Air Permit
- Growing Areas of Parker County
- Quick Access to I-20
Executive Summary
1910 Greenwood is a turnkey batch plant acquisition along Ric Williamson Highway — land, full build-out, and installed equipment all included in the listing price. No separate procurement. No construction management. The asset is delivered operational-ready.
Construction commences July 2026 with an estimated 6-month timeline, targeting completion January 2027. Buyers who go under contract prior to completion are eligible for price negotiation — locking in favorable terms before the asset reaches full operational market value.
What's Included
Land along a high-access highway corridor
Complete batch plant build-out, engineered to specification
All equipment, fully installed and commissioned upon completion
180 CY/HR capacity
Plant Specifications
Stationary Batch Plant — 12ft Square Fixed Hopper, 30"×110ft Radial Stacker, 200ton (4-compartment) Aggregate Bin, 12yd Agg Batcher, 36" Aggregate Conveyor, 1,050bbl Main Silo w/ substructure, 600bbl Aux Silo w/ substructure, 10" Screw Conveyor, 12yd Cement Batcher, 450gal Water Batcher, 10,000 cfm Dust Collection, Jonel Control System.
Location
Direct highway access on Ric Williamson Highway supports efficient logistics, simplified fleet routing, and the high-frequency material movement batch operations require.
Why Move Before Completion
Pre-completion buyers get two advantages: negotiating leverage on price, and the ability to run operational preparation in parallel with construction — meaning the business is ready to operate on day one after closing.
Who This Is For
Operators who need capacity without the risk of a self-managed build. Investors acquiring hard industrial infrastructure in a well-located corridor. Regional contractors and suppliers looking to establish or expand presence along a key highway route.
Construction begins July 2026. Pre-completion pricing is available now and closes when construction is substantially complete.
Contact Grey Oaks Property Management for pricing, site documentation, and to schedule a walkthrough.
Construction commences July 2026 with an estimated 6-month timeline, targeting completion January 2027. Buyers who go under contract prior to completion are eligible for price negotiation — locking in favorable terms before the asset reaches full operational market value.
What's Included
Land along a high-access highway corridor
Complete batch plant build-out, engineered to specification
All equipment, fully installed and commissioned upon completion
180 CY/HR capacity
Plant Specifications
Stationary Batch Plant — 12ft Square Fixed Hopper, 30"×110ft Radial Stacker, 200ton (4-compartment) Aggregate Bin, 12yd Agg Batcher, 36" Aggregate Conveyor, 1,050bbl Main Silo w/ substructure, 600bbl Aux Silo w/ substructure, 10" Screw Conveyor, 12yd Cement Batcher, 450gal Water Batcher, 10,000 cfm Dust Collection, Jonel Control System.
Location
Direct highway access on Ric Williamson Highway supports efficient logistics, simplified fleet routing, and the high-frequency material movement batch operations require.
Why Move Before Completion
Pre-completion buyers get two advantages: negotiating leverage on price, and the ability to run operational preparation in parallel with construction — meaning the business is ready to operate on day one after closing.
Who This Is For
Operators who need capacity without the risk of a self-managed build. Investors acquiring hard industrial infrastructure in a well-located corridor. Regional contractors and suppliers looking to establish or expand presence along a key highway route.
Construction begins July 2026. Pre-completion pricing is available now and closes when construction is substantially complete.
Contact Grey Oaks Property Management for pricing, site documentation, and to schedule a walkthrough.
Property Facts
1 Lot Available
Lot
| Price | $14,997,862 CAD | Lot Size | 6.50 AC |
| Price Per AC | $2,307,363.42 CAD |
| Price | $14,997,862 CAD |
| Price Per AC | $2,307,363.42 CAD |
| Lot Size | 6.50 AC |
Cement batch plant build-to-suit along Ric Williamson Hwy, Weatherford, TX. 6.7 acres. 180 CY/HR capacity. Listing price includes land, full construction & installed equipment. Construction commencing July 2026. Pre-completion pricing available.
Description
Fully entitled site with TCEQ Air Quality Standard Permit for concrete batch plant operations. 6.5 acres of level land suitable for permanent or portable batch plant installations. Utilities and access support high-capacity operations. Located in Weatherford with direct connectivity to major highways and regional construction markets.
Somewhat walkable
20/100
Exceptionally drivable
100/100
Not bikeable
10/100
1 of 9
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
Presented by
1910 Greenwood Rd
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.