Log In/Sign Up
Your email has been sent.
2043 83rd St 30,000 SF of Industrial Space Available in North Bergen, NJ 07047

Highlights
- Great location
- Price Includes Utilities and Real Estate Taxes
- 8 +/- Miles to GWB & 7 +/- Miles to Lincoln Tunnel
Features
Clear Height
21’
Column Spacing
34’ x 40’
Drive In Bays
1
Interior Dock Doors
2
Standard Parking Spaces
8
All Available Space(1)
Display Rental Rate as
- Space
- Size
- Term
- Rental Rate
- Space Use
- Condition
- Available
Fully racked - Great location
- Lease rate does not include utilities, property expenses or building services
- Space is in Excellent Condition
- 1 Drive Bay
- 2 Loading Docks
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| 1st Floor | 30,000 SF | Negotiable | $20.51 CAD/SF/YR $1.71 CAD/SF/MO $615,173 CAD/YR $51,264 CAD/MO | Industrial | Partial Build-Out | 90 Days |
1st Floor
| Size |
| 30,000 SF |
| Term |
| Negotiable |
| Rental Rate |
| $20.51 CAD/SF/YR $1.71 CAD/SF/MO $615,173 CAD/YR $51,264 CAD/MO |
| Space Use |
| Industrial |
| Condition |
| Partial Build-Out |
| Available |
| 90 Days |
1 of 1
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1st Floor
| Size | 30,000 SF |
| Term | Negotiable |
| Rental Rate | $20.51 CAD/SF/YR |
| Space Use | Industrial |
| Condition | Partial Build-Out |
| Available | 90 Days |
Fully racked - Great location
- Lease rate does not include utilities, property expenses or building services
- 1 Drive Bay
- Space is in Excellent Condition
- 2 Loading Docks
Property Overview
This 30,000 SF industrial facility features a 21-foot clear height, two dock doors, one drive-in bay. Recently renovated, the building offers masonry construction, dry sprinkler system, 600-amp three-phase power, and natural gas heating. 8 parking spaces, and excellent access to the George Washington Bridge and Lincoln Tunnel, this property is ideal for warehousing. Available at $15/SF/year NNN
Manufacturing Facility Facts
Building Size
30,000 SF
Lot Size
2.88 AC
Year Built/Renovated
1970/2017
Construction
Masonry
Sprinkler System
Dry
Water
City
Sewer
City
Heating
Gas
Gas
Natural
Power Supply
Amps: 600 Volts: 208 Phase: 3
Zoning
I - Industrial
1 1
Walk Score®
Very Walkable (79)
1 of 2
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1 of 1
Presented by
Jalal Saab
2043 83rd St
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.


