Your email has been sent.
Old Cooper-Marine Chip Mill & Barge Loading 2212 Alliance Rd 70 Acres of Industrial Land for Lease in Quinton, AL 35130



HIGHLIGHTS
- Barge Loading Facility on the Black Warrior River
LOT AVAILABLE
Display Rental Rate as
| Rental Rate |
|
Lot Size | 70.00 AC |
| Lease Term | Negotiable |
| Rental Rate | |
| Lease Term | Negotiable |
| Lot Size | 70.00 AC |
63-acre site-Barge Loading Faciltiy with an Office Building 3450 sf with 6 offices, large conference room, scale room, reception area, bathrooms and kitchen area. this would make a great data center with natural gas and/or solar power. Shop Building-2400 sf with offices, bathroom and break room, roll-top door and storage with a wash-down area outside. Dock Facilities- 2600 ft long waterfront with pylons and barge tie-ups. Crane pad was dug out to bedrock and drilled, keyed, laced with rebar and poured with concrete. The laydown area is 8 ft higher than the crane pad to allow loads to clear empty barges. Bulk storage area-cement pad in a semicircle with a backstop will hold 4 barge loads of chips. It has 2 feed-out pits. This was previously a Wood Barge loading facility, it will accommodate structural steel or pipe, super sack, coal or other bulk materials. This acreage includes another listing with 850 feet of waterfront for a total of 3450 feet of water frontage. Triple Net Lease- Price listed is $3000/month lease for the first year, with cost of living adjustments added for the remaining term. CLIENT WILL SELL FOR $4mm Here is a useful mapping link for you to navigate the area and see the property more clearly: https://arcg.is/1GXbLj
PROPERTY OVERVIEW
65 acre Barge loading facility with offices along the Black Warrior River. Triple Net Lease-Office Building 3200 sf with 6 offices, large conference room, scale room, reception area, bathrooms and kitchen area Dock Facilities- 2600 ft long waterfront with pylons and barge tie-ups. Crane pad was dug out to bedrock and drilled, keyed, laced with rebar and poured with concrete. The lay down area is 8 ft higher than crane pad to allow loads to clear empty barge. Bulk storage area-cement pad in a semicircle with a backstop will hold 4 barge loads of chips. It has 2 feed out pits. This was previously a Wood Chip Mill, will accommodate structural steel or pipe, super sack, coal or other bulk materials. This property is also listed for sale, call for more details.
PROPERTY FACTS
Presented by
Old Cooper-Marine Chip Mill & Barge Loading | 2212 Alliance Rd
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.

