Log In/Sign Up
Your email has been sent.
Main Building 2800 Estes St 350,378 SF Industrial Building Norton Shores, MI 49441 $13,681,056 CAD ($39.05 CAD/SF)



Investment Highlights
- Site location is well-connected to the Muskegon Metro area
- Building size is 350,378 SF & can be split for multiple users
- Paved with ample parking
- 21.5 acres plus two adjacent parcels for a total of 36.33 acres
- Significant infrastructure in place
- Heavy electric power, an abundance of loading docks, compressed air throughout & multiple overhead cranes of various tonnages
Taxes & Operating Expenses (Actual - 2025) |
Annual (CAD) | Annual Per SF (CAD) |
|---|---|---|
| Taxes |
$248,182
|
$0.71
|
| Operating Expenses |
-
|
-
|
| Total Expenses |
$248,182
|
$0.71
|
Taxes & Operating Expenses (Actual - 2025)
| Taxes (CAD) | |
|---|---|
| Annual | $248,182 |
| Annual Per SF | $0.71 |
| Operating Expenses (CAD) | |
|---|---|
| Annual | - |
| Annual Per SF | - |
| Total Expenses (CAD) | |
|---|---|
| Annual | $248,182 |
| Annual Per SF | $0.71 |
Property Facts
| Price | $13,681,056 CAD | Rentable Building Area | 350,378 SF |
| Price Per SF | $39.05 CAD | No. Stories | 2 |
| Sale Type | Owner User | Year Built/Renovated | 1948/2019 |
| Property Type | Industrial | Parking Ratio | 0.5/1,000 SF |
| Property Subtype | Manufacturing | No. Dock-High Doors/Loading | 12 |
| Building Class | C | No. Drive In / Grade-Level Doors | 2 |
| Lot Size | 36.33 AC | Cross Streets | Estes St and Sherman Blvd |
| Zoning | GI - General Industrial | ||
| Price | $13,681,056 CAD |
| Price Per SF | $39.05 CAD |
| Sale Type | Owner User |
| Property Type | Industrial |
| Property Subtype | Manufacturing |
| Building Class | C |
| Lot Size | 36.33 AC |
| Rentable Building Area | 350,378 SF |
| No. Stories | 2 |
| Year Built/Renovated | 1948/2019 |
| Parking Ratio | 0.5/1,000 SF |
| No. Dock-High Doors/Loading | 12 |
| No. Drive In / Grade-Level Doors | 2 |
| Cross Streets | Estes St and Sherman Blvd |
| Zoning | GI - General Industrial |
Amenities
- Fenced Lot
Utilities
- Lighting
- Gas - Natural
- Water - City
- Sewer - City
- Heating - Electric
1 1
Property Taxes
| Parcel Numbers | Total Assessment | $5,258,548 CAD | |
| Land Assessment | $0 CAD | Annual Taxes | $248,182 CAD ($0.71 CAD/SF) |
| Improvements Assessment | $0 CAD | Tax Year | 2025 |
Property Taxes
Parcel Numbers
Land Assessment
$0 CAD
Improvements Assessment
$0 CAD
Total Assessment
$5,258,548 CAD
Annual Taxes
$248,182 CAD ($0.71 CAD/SF)
Tax Year
2025
1 of 82
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1 of 1
Presented by
Main Building | 2800 Estes St
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.
Your message has been sent!
Activate your LoopNet account now to track properties, get real-time alerts, save time on future inquiries, and more.
