Your email has been sent.
INVESTMENT HIGHLIGHTS
- Close proximity to downtown Salt Lake City
- Strong labor pool
- Strong highway access
PROPERTY FACTS
| Sale Type | Investment or Owner User | Property Subtype | Industrial |
| No. Lots | 13 | Proposed Use | Industrial |
| Property Type | Land | Total Lot Size | 72.18 AC |
| Zoning | M1-A - https://codelibrary.amlegal.com/codes/saltlakecityut/latest/saltlakecity_ut/0-0-0-123867 | ||
| Sale Type | Investment or Owner User |
| No. Lots | 13 |
| Property Type | Land |
| Property Subtype | Industrial |
| Proposed Use | Industrial |
| Total Lot Size | 72.18 AC |
| Zoning | M1-A - https://codelibrary.amlegal.com/codes/saltlakecityut/latest/saltlakecity_ut/0-0-0-123867 |
13 LOTS AVAILABLE
Lot 1
| Lot Size | 1.80 AC |
| Lot Size | 1.80 AC |
Zoned M-1A Light Industrial 1–10 AC parcels Utilities located in adjacent right-of-way for flexible site connections 2200 W widened with new water & sewer lines Horizontal improvements delivering 4Q2026 Survey, Geotech & Phase I reports available
Lot 2
| Lot Size | 1.80 AC |
| Lot Size | 1.80 AC |
Zoned M-1A Light Industrial 1–10 AC parcels Utilities located in adjacent right-of-way for flexible site connections 2200 W widened with new water & sewer lines Horizontal improvements delivering 4Q2026 Survey, Geotech & Phase I reports available
Lot 3
| Lot Size | 5.80 AC |
| Lot Size | 5.80 AC |
Zoned M-1A Light Industrial 1–10 AC parcels Utilities located in adjacent right-of-way for flexible site connections 2200 W widened with new water & sewer lines Horizontal improvements delivering 4Q2026 Survey, Geotech & Phase I reports available
Lot 4
| Lot Size | 2.60 AC |
| Lot Size | 2.60 AC |
Zoned M-1A Light Industrial 1–10 AC parcels Utilities located in adjacent right-of-way for flexible site connections 2200 W widened with new water & sewer lines Horizontal improvements delivering 4Q2026 Survey, Geotech & Phase I reports available
Lot 5
| Lot Size | 2.10 AC |
| Lot Size | 2.10 AC |
Zoned M-1A Light Industrial 1–10 AC parcels Utilities located in adjacent right-of-way for flexible site connections 2200 W widened with new water & sewer lines Horizontal improvements delivering 4Q2026 Survey, Geotech & Phase I reports available
Lot 6
| Lot Size | 5.20 AC |
| Lot Size | 5.20 AC |
Zoned M-1A Light Industrial 1–10 AC parcels Utilities located in adjacent right-of-way for flexible site connections 2200 W widened with new water & sewer lines Horizontal improvements delivering 4Q2026 Survey, Geotech & Phase I reports available
Lot 7
| Lot Size | 6.90 AC |
| Lot Size | 6.90 AC |
Zoned M-1A Light Industrial 1–10 AC parcels Utilities located in adjacent right-of-way for flexible site connections 2200 W widened with new water & sewer lines Horizontal improvements delivering 4Q2026 Survey, Geotech & Phase I reports available
Lot 8
| Lot Size | 4.78 AC |
| Lot Size | 4.78 AC |
Zoned M-1A Light Industrial 1–10 AC parcels Utilities located in adjacent right-of-way for flexible site connections 2200 W widened with new water & sewer lines Horizontal improvements delivering 4Q2026 Survey, Geotech & Phase I reports available
Lot 9
| Lot Size | 5.70 AC |
| Lot Size | 5.70 AC |
Zoned M-1A Light Industrial 1–10 AC parcels Utilities located in adjacent right-of-way for flexible site connections 2200 W widened with new water & sewer lines Horizontal improvements delivering 4Q2026 Survey, Geotech & Phase I reports available
Lot 10
| Lot Size | 7.30 AC |
| Lot Size | 7.30 AC |
Zoned M-1A Light Industrial 1–10 AC parcels Utilities located in adjacent right-of-way for flexible site connections 2200 W widened with new water & sewer lines Horizontal improvements delivering 4Q2026 Survey, Geotech & Phase I reports available
Lot 11
| Lot Size | 8.50 AC |
| Lot Size | 8.50 AC |
Zoned M-1A Light Industrial 1–10 AC parcels Utilities located in adjacent right-of-way for flexible site connections 2200 W widened with new water & sewer lines Horizontal improvements delivering 4Q2026 Survey, Geotech & Phase I reports available
Lot 12
| Lot Size | 9.80 AC |
| Lot Size | 9.80 AC |
Zoned M-1A Light Industrial 1–10 AC parcels Utilities located in adjacent right-of-way for flexible site connections 2200 W widened with new water & sewer lines Horizontal improvements delivering 4Q2026 Survey, Geotech & Phase I reports available
Lot 13
| Lot Size | 9.90 AC |
| Lot Size | 9.90 AC |
Zoned M-1A Light Industrial 1–10 AC parcels Utilities located in adjacent right-of-way for flexible site connections 2200 W widened with new water & sewer lines Horizontal improvements delivering 4Q2026 Survey, Geotech & Phase I reports available
DESCRIPTION
Zoning & Parcels • Zoned M-1A Light Industrial • 1–10 acre parcels available • Contact brokers for pricing & tours Strategic Location • Direct access to I-215 and major freight corridors • High visibility from I-215 • Strong proximity to Salt Lake City & Davis County labor pools Site Infrastructure • Utilities located in adjacent right-of-way for flexible site connections • 2200 W widened with new water and sewer lines • Horizontal improvements delivering 4Q2026 • Survey, Geotech, & Phase I reports available
Presented by
3200 N 2200 W
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.



