Share This Listing

Message

917 characters remaining

Hmm, there seems to have been an error sending your message. Please try again.

Your email has been sent.

Still interested?

Contact the brokers for more information about this property

Investment Highlights

  • ELIGIBLE USES: Medical, ALF, Nursing Homes, Worship, Schools, Child/Adult Care, Group Care, Essential Svcs, Water/Sewer & Electric Sub-Stations.
  • PRIVATE LAKE: Pre-integrated infrastructure for retention/runoff; bypasses costly excavation & permitting; saves $100k+ in valuable engineering costs.
  • INFRASTRUCTURE EXPANSION: Capitalize on the Oil Well Road widening (6 lanes by FY2027) and current major nearby Desoto Blvd intersection improvements.
  • GROWTH EPICENTER: The direct path of North Naples' massive expansion; Serves over 10,000+ new homes and the future master-planned Town of Big Cypress.
  • GROWTH RESTUDY: Site is a 2026 Restudy node; positioned for a "By-Right" commercial transition to support 9,300+ new area rooftop deliveries.
  • UTILITY MOMENTUM: Direct FPL & High-Speed Data at site; aligned with the $438M Northeast Utility Program for municipal expansion.

Executive Summary

——————————————————
STRATEGIC DUAL-LOT ASSEMBLAGE
——————————————————
In an environment where entitled land is increasingly scarce, this dual-lot assemblage offers a direct, fully de-risked path to completion through its broad range of allowable Conditional Use (CU) Entitlements. Consisting of two adjacent properties with 1,157± linear feet of premium frontage, the site stands as the primary turnkey candidate for institutional facilities that require superior site circulation and multiple strategic ingress/egress points.
——————————————————
CATALYST: 2026 BY-RIGHT ASSET
——————————————————
The Rural Golden Gate Estates Restudy serves as a powerful de-risking mechanism for this asset. By modernizing the Growth Management Plan to support 9,300+ new rooftop deliveries, the County is effectively pre-validating this site’s transition to high-density, "By-Right" commercial use. For an institutional buyer, this alignment offers a formalized bridge toward "Highest and Best Use" without the traditional legislative friction. By utilizing the Restudy’s findings, a developer can compress the approval timeline, bypass rezoning uncertainty, and solidify the property’s long-term appreciation. This site stands as a primary beneficiary of the Northeast Program’s effort to centralize essential services at key regional nodes.
——————————————————
INFRASTRUCTURE-READY
——————————————————
A standout feature is the existing Private Lake, a pre-integrated infrastructure asset strategically ready for retention and runoff compliance. By meeting environmental regulations without the need for additional excavation, a buyer can bypass the costly engineering and permitting hurdles that typically stall large-scale institutional projects, saving $100k+ in valuable engineering costs.
——————————————————
VALUE ENTITLEMENT ASSET
——————————————————
As the surrounding corridor transitions toward a denser, service-oriented landscape, this site serves as a vital bridge for community-essential infrastructure. This Value Entitlement Asset is already positioned to absorb surging demand for ALF, Medical, and School facilities included in the entitled uses that are currently under-represented in the North Naples market.
——————————————————
CAPTIVE CONSUMER BASE
——————————————————
Proximity to major master-planned villages, including Rivergrass (2,500 units), Longwater (2,600 units), Bellmar (2,750 units), and SkySail (1,500 units), representing over 9,300+ immediate rooftop deliveries, creates an immediate and surging demand for the specialized commercial and community-essential services allowed under the current entitlements.
——————————————————
OPTIMIZED DEVELOPMENT YIELD
——————————————————
Unlike standard parcels where environmental setbacks and retention requirements can consume up to 25-30% of buildable acreage, this site is engineered for maximum density. The presence of the existing lake as a centralized drainage solution allows a developer to utilize a significantly higher percentage of the "upland" footprint for vertical construction. This translates directly to a higher bed count for ALFs, increased square footage for medical offices, or expanded classroom capacity, driving a superior yield-on-cost that is unattainable on unimproved 7-acre tracts.
——————————————————
PRO-FORMA & INVESTMENT THESIS
——————————————————
A preliminary feasibility analysis indicates that the site’s maximized upland footprint supports a significantly higher-than-average yield-on-cost for institutional-grade developments. With the broad CU entitlements already in place and the existing 2.6± AC lake providing a turnkey drainage solution, a buyer can project a streamlined stabilization timeline. Detailed pro-forma data and site-specific infrastructure analysis are available to qualified buyers upon the execution of a Confidentiality Agreement.
——————————————————
THE FIRST TO MARKET ADVANTAGE
——————————————————
Where timing is as critical as location, this site offers a "first-to-market" advantage that traditional raw land cannot provide. A buyer inherits a project where the most significant capital and schedule hurdles are already cleared. The combination of existing entitlements and the private lake allows you to bypass a 12-24 month "risk window" and move straight to site plan approval. Given the scarcity of shovel-ready institutional land, this opportunity will not last. Capture the epicenter of the county’s growth, anchored by the upcoming Oil Well Road expansion and regional utility extensions, with maximum speed and minimal capital exposure.
——————————————————
*Disclaimer: This is an owner-direct, principal-to-principal listing; the seller is a private individual and not a licensed brokerage. While property dimensions and allowable Conditional Uses (CU) are based on Collier County data and indicate a streamlined administrative path for development, all information, including 2026 Restudy projections and utility expansions, is for illustrative purposes only. Potential buyers must perform independent due diligence and provide their own surveys to verify exact usable acreage, setbacks, and infrastructure capacities prior to execution.
——————————————————
Serious inquiries are invited to submit a Letter of Intent (LOI) or formal offer directly to Heather Hunter at hhunterdeaninvestment@gmail.com.

Property Facts

Sale Type Investment
Sale Conditions
Bulk/Portfolio Sale
  • Redevelopment Project
No. Lots 1
Property Type Land
Property Subtype Commercial
Proposed Use
Daycare Centre
  • Healthcare
  • Rehabilitation Centre
  • Religious Facility
  • Schools
  • Storefront, Retail or Office
  • Storefront, Retail or Residential
  • Supermarket
Total Lot Size 7.48 AC
Zoning E - Estates District (E) - Supports Institutional/Medical/ALF via Conditional Uses.

1 Lot Available

Lot Multiple

Lot Size 7.48 AC

7.48± AC assemblage: 3269 Desoto (2.34 AC) & 3275 Desoto (5.14 AC) • 1,157’± dual-street frontage • 2.6± AC lake for retention • Ideal for Institutional-Medical-ALF via CU • High & Dry • Near 9,300+ New Homes • APNs: 40073120003, 40073040002.

Description

THE STRATEGIC OPPORTUNITY —————————————————— The Desoto Assemblage represents a high-velocity 7.48± AC development node strategically positioned at the epicenter of North Naples’ primary growth corridor. Comprised of two contiguous parcels (3269 and 3275 Desoto Blvd N), the site offers 1,157± linear feet of premium dual-street frontage. This is a policy-driven investment, as the site is a designated focal point within the 2026 Rural Golden Gate Estates Restudy. This legislative alignment pre-validates a transition to high-density, service-oriented uses designed to support the 9,300+ new rooftop deliveries currently transforming the immediate submarket. RAPID SPEED-TO-MARKET —————————————————— A defining competitive advantage of this asset is the existing 2.6± AC private lake, which serves as a turnkey retention and drainage solution. Unlike raw land tracts that require extensive excavation and complex environmental permitting, this site allows developers to bypass a typical 12–24 month "risk window." By utilizing the existing lake for runoff compliance, a buyer can realize over $100k in immediate engineering cost avoidance and utilize a significantly higher percentage of the "upland" footprint for vertical construction. This optimization directly translates to superior development yields for institutional-grade facilities. INSTITUTIONAL GROWTH —————————————————— The property’s location and infrastructure make it an ideal candidate for medical centers, senior living facilities (ALF/Skilled Nursing), and educational campuses. The site is perfectly positioned to capture the captive consumer base of neighboring master-planned communities like Rivergrass, Longwater, and SkySail. With the Oil Well Road expansion to six lanes by 2027 and the $438M Northeast Utility Program extending municipal services to the area, the Desoto Assemblage offers a de-risked bridge to the 2027 "By-Right" valuation upside. This is a rare, shovel-ready opportunity to anchor the most significant regional node in Collier County.

Exceptionally drivable
100/100
Somewhat bikeable
30/100

Property Taxes

Property Taxes

Parcel Numbers
Multiple
  • 40073120003
  • 40073040002
Land Assessment
$0 CAD
Improvements Assessment
$0 CAD
Total Assessment
$103,257 CAD
  • Listing ID: 39833008

  • Date on Market: 2026-03-19

  • Last Updated:

  • Address: 3275 Desoto Blvd N, Naples, FL 34120

Link copied
Your LoopNet account has been created!

Please Share Your Feedback

We welcome any feedback on how we can improve LoopNet to better serve your needs.
X
{{ getErrorText(feedbackForm.starRating, "rating") }}
255 character limit ({{ remainingChars() }} charactercharacters remainingover)
{{ getErrorText(feedbackForm.msg, "rating") }}
{{ getErrorText(feedbackForm.fname, "first name") }}
{{ getErrorText(feedbackForm.lname, "last name") }}
{{ getErrorText(feedbackForm.phone, "phone number") }}
{{ getErrorText(feedbackForm.phonex, "phone extension") }}
{{ getErrorText(feedbackForm.email, "email address") }}