Your email has been sent.
Highlights
- Uses - USDA-Food Processing, Freezer, Blast Freezer, Cooler, Commissary, Food Prep, and Distribution
- Sprinklers
- Heavy Power 7000 Amps, 400/480, 3 phase (Buyer/tenant to verify)
- Parking - Fenced and fully secured parking 111 auto stalls
Features
All Available Spaces(2)
Display Rental Rate as
- Space
- Size
- Term
- Rental Rate
- Space Use
- Condition
- Available
The basement has a total of 50,013 square feet of space. Space breakdown: Blast Freezer: 500 sf Cooler/Processing: 8,500 sf Meal Prep/ Commissary ( Drains, exhaust hoods, baking mixing): 10,000 sf Dry Storage: 14,000 sf Office/Welfare: 4,500 sf
- Lease rate does not include utilities, property expenses or building services
- Space is in Excellent Condition
- Freezer Space
- Heavy duty freight elevator between floors
- Floor Drains
- Clarifiers
- Includes 4,500 SF of dedicated office space
- Can be combined with additional space(s) for up to 103,633 SF of adjacent space
- 8 pallet lift between ground floor and basement
- Cooking Hoods
- Boilers
The first floor has a total of 53,620 square feet of space. Space breakdown: Freezer: 11,750 sf Cooler/ Processing: 22,200 sf Dry Storage: 4,000 sf Office/Welfare: 1,700 sf
- Lease rate does not include utilities, property expenses or building services
- Space is in Excellent Condition
- Freezer Space
- Heavy duty freight elevator between floors
- Floor drains
- Boilers
- Includes 1,700 SF of dedicated office space
- Can be combined with additional space(s) for up to 103,633 SF of adjacent space
- 8 pallet lift between ground floor and basement
- Cooking Hoods
- Clarifiers
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| Basement | 50,013 SF | Negotiable | $27.11 CAD/SF/YR $2.26 CAD/SF/MO $1,355,732 CAD/YR $112,978 CAD/MO | Industrial | Full Build-Out | 30 Days |
| 1st Floor | 53,620 SF | Negotiable | $27.11 CAD/SF/YR $2.26 CAD/SF/MO $1,453,509 CAD/YR $121,126 CAD/MO | Industrial | Full Build-Out | 30 Days |
Basement
| Size |
| 50,013 SF |
| Term |
| Negotiable |
| Rental Rate |
| $27.11 CAD/SF/YR $2.26 CAD/SF/MO $1,355,732 CAD/YR $112,978 CAD/MO |
| Space Use |
| Industrial |
| Condition |
| Full Build-Out |
| Available |
| 30 Days |
1st Floor
| Size |
| 53,620 SF |
| Term |
| Negotiable |
| Rental Rate |
| $27.11 CAD/SF/YR $2.26 CAD/SF/MO $1,453,509 CAD/YR $121,126 CAD/MO |
| Space Use |
| Industrial |
| Condition |
| Full Build-Out |
| Available |
| 30 Days |
Basement
| Size | 50,013 SF |
| Term | Negotiable |
| Rental Rate | $27.11 CAD/SF/YR |
| Space Use | Industrial |
| Condition | Full Build-Out |
| Available | 30 Days |
The basement has a total of 50,013 square feet of space. Space breakdown: Blast Freezer: 500 sf Cooler/Processing: 8,500 sf Meal Prep/ Commissary ( Drains, exhaust hoods, baking mixing): 10,000 sf Dry Storage: 14,000 sf Office/Welfare: 4,500 sf
- Lease rate does not include utilities, property expenses or building services
- Includes 4,500 SF of dedicated office space
- Space is in Excellent Condition
- Can be combined with additional space(s) for up to 103,633 SF of adjacent space
- Freezer Space
- 8 pallet lift between ground floor and basement
- Heavy duty freight elevator between floors
- Cooking Hoods
- Floor Drains
- Boilers
- Clarifiers
1st Floor
| Size | 53,620 SF |
| Term | Negotiable |
| Rental Rate | $27.11 CAD/SF/YR |
| Space Use | Industrial |
| Condition | Full Build-Out |
| Available | 30 Days |
The first floor has a total of 53,620 square feet of space. Space breakdown: Freezer: 11,750 sf Cooler/ Processing: 22,200 sf Dry Storage: 4,000 sf Office/Welfare: 1,700 sf
- Lease rate does not include utilities, property expenses or building services
- Includes 1,700 SF of dedicated office space
- Space is in Excellent Condition
- Can be combined with additional space(s) for up to 103,633 SF of adjacent space
- Freezer Space
- 8 pallet lift between ground floor and basement
- Heavy duty freight elevator between floors
- Cooking Hoods
- Floor drains
- Clarifiers
- Boilers
Property Overview
±103,633 SF building with refrigerated production and cold storage, with easy access to I-5, I-10, I-110, I-710, and Hwy-60.
Food Processing Facility Facts
Presented by
3305 E Vernon Ave
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.








