Your email has been sent.
Braselton Technology Center - Bldg 100 354 Tom White Rd 204,514 SF of 4-Star Industrial Space Available in Braselton, GA 30517



Highlights
- Direct access to I-85 corridor
- Strategic positioning between Atlanta and Northeast Georgia markets
- Proximity to major logistics hubs including FedEx Ground Hub Braselton and UPS Hub Gainesville
- Established industrial area with neighbors including Amazon, FedEx, Whole Foods Market, and Uline
Features
All Available Space(1)
Display Rental Rate as
- Space
- Size
- Term
- Rental Rate
- Space Use
- Build-Out
- Available
Building SF: 204,120 SF Office SF: BTS Configuration: Rear Load Dimensions: 756' x 270' Clear Height: 32' Construction Type: Concrete Tilt-Wall Drive-in Doors: 2 (12' x 14') Warehouse Lighting: LED Roof: 45 mil TPO with R-15 insulation (R-25 included at future office locations) Sprinklers: ESFR Auto Parking: 193 Trailer Parking: 30 (54 future spaces) Truck Court Depth: 185' Floor Slab: 6' non-reinforceable slab on grade
- Listed rate may not include certain utilities, building services and property expenses
- Space is in Excellent Condition
| Space | Size | Term | Rental Rate | Space Use | Build-Out | Available |
| 1st Floor | 204,514 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request | Industrial | Full Build-Out | 2027-06-01 |
1st Floor
| Size |
| 204,514 SF |
| Term |
| Negotiable |
| Rental Rate |
| Upon Request Upon Request Upon Request Upon Request |
| Space Use |
| Industrial |
| Build-Out |
| Full Build-Out |
| Available |
| 2027-06-01 |
1st Floor
| Size | 204,514 SF |
| Term | Negotiable |
| Rental Rate | Upon Request |
| Space Use | Industrial |
| Build-Out | Full Build-Out |
| Available | 2027-06-01 |
Building SF: 204,120 SF Office SF: BTS Configuration: Rear Load Dimensions: 756' x 270' Clear Height: 32' Construction Type: Concrete Tilt-Wall Drive-in Doors: 2 (12' x 14') Warehouse Lighting: LED Roof: 45 mil TPO with R-15 insulation (R-25 included at future office locations) Sprinklers: ESFR Auto Parking: 193 Trailer Parking: 30 (54 future spaces) Truck Court Depth: 185' Floor Slab: 6' non-reinforceable slab on grade
- Listed rate may not include certain utilities, building services and property expenses
- Space is in Excellent Condition
Property Overview
Strategically located at 354 Tom White Road in Braselton's premier technology corridor, this state-of-the-art industrial development offers exceptional warehouse and distribution opportunities . The Braselton Technology Center features two modern concrete tilt-wall buildings with optimal logistics connectivity. Building 100 Specifications: 204,514 SF total building area 32' minimum clear height Concrete tilt-wall construction with 6" non-reinforced slab on grade Two 12' x 14' drive-in doors with rear-load configuration 185' deep truck court for efficient trailer maneuvering 193 auto parking spaces plus 30 trailer storage spaces (54 future expansion) LED warehouse lighting and ESFR sprinkler system 45 mil TPO roof with R-15 insulation Building 200 Specifications: 149,318 SF total building area 32' minimum clear height Matching concrete tilt-wall construction Two 12' x 14' drive-in doors with rear-load design 185' deep truck court 154 auto parking spaces plus 19 trailer storage spaces LED lighting and ESFR sprinkler protection [Source: attachment - 2026-04-10T103425.500.pdf] Based on the specifications and location of the Braselton Technology Center, several types of companies would find this property attractive: E-Commerce & Fulfillment Operations: Online retailers needing regional distribution centers Third-party logistics (3PL) providers serving the Southeast market Companies requiring last-mile delivery capabilities to Atlanta and surrounding areas Food & Consumer Goods Distribution: Food distributors and grocery chains (given Whole Foods Market's presence in the area) Consumer packaged goods companies Beverage distribution operations Retail supply chain operations Manufacturing & Assembly: Light manufacturing companies requiring 32' clear height for equipment Assembly operations with moderate storage needs Companies needing both warehouse and potential office space (BTS configurations available) Logistics & Transportation: Regional freight consolidation operations Cross-docking facilities leveraging I-85 corridor access Companies serving the Atlanta-Northeast Georgia logistics network Freight forwarding and distribution companies Automotive & Industrial Supply: Auto parts distribution (given proximity to major transportation routes) Industrial supply companies Building materials distribution The property's rear-load configuration, substantial truck courts (185' deep), and trailer storage capacity make it particularly suited for companies with significant inbound/outbound freight operations. The presence of established logistics companies like Amazon, FedEx, and Uline in the immediate area indicates strong market demand from supply chain-focused businesses
Distribution Facility Facts
Presented by
Braselton Technology Center - Bldg 100 | 354 Tom White Rd
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.
