Log In/Sign Up
Your email has been sent.
Investment Highlights
- ±534,985 SF FOR SALE, LEASE, BTS OR DESIGN BUILD
- PHASE I UNDER CONSTRUCTION I December 2026 Delivery
Executive Summary
±534,985 SF FOR SALE, LEASE, BTS OR DESIGN BUILD
PHASE I UNDER CONSTRUCTION I December 2026 Delivery
• Phase One Delivers December 2026
• ± 28’ clear-height (Building 3)
• ± 32’ clear-height (Building 2, 5, 6)
• Build to Suit Options Available
• Tilt wall construction
• Fort Bend County
• City of Rosenberg
• Easy access to several major thoroughfares
• Strong local labor force
• Close proximity to KCS intermodal and Freeport deepwater port
• City utilities to site
• Off-Site Regional Detention Pond
• Low tax rate - 1.8689%
• Economic incentives available
PHASE I UNDER CONSTRUCTION I December 2026 Delivery
• Phase One Delivers December 2026
• ± 28’ clear-height (Building 3)
• ± 32’ clear-height (Building 2, 5, 6)
• Build to Suit Options Available
• Tilt wall construction
• Fort Bend County
• City of Rosenberg
• Easy access to several major thoroughfares
• Strong local labor force
• Close proximity to KCS intermodal and Freeport deepwater port
• City utilities to site
• Off-Site Regional Detention Pond
• Low tax rate - 1.8689%
• Economic incentives available
Property Facts
| Sale Type | Investment or Owner User | Individually For Sale | 0 |
| Status | Active | Total Building Size | 534,985 SF |
| Number of Properties | 11 | Total Land Area | 152.04 AC |
| Sale Type | Investment or Owner User |
| Status | Active |
| Number of Properties | 11 |
| Individually For Sale | 0 |
| Total Building Size | 534,985 SF |
| Total Land Area | 152.04 AC |
Properties
Show More > < Show Less
1 1
1 of 3
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1 of 1
Presented by
Spur 10 Logistics Park
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.


