Share This Listing

Message

935 characters remaining

Hmm, there seems to have been an error sending your message. Please try again.

Your email has been sent.

Still interested?

Contact the broker for more information about this property

1 Mega Watt Available Today 402 S 29th St 10,000 SF of Industrial Space Available in Blackwell, OK 74631

Save this listing!

Favourite this listing to get notified of price updates, new media and more

Highlights

  • Turn Key Data Center Located In Blackwell AI Foundry Opportunity Zone, 402 S. 29th, Blackwell, OK 74631

Features

Clear Height
16’

All Available Space(1)

Display Rental Rate as

  • Space
  • Size
  • Term
  • Rental Rate
  • Space Use
  • Condition
  • Available
  • 1st Floor
  • 10,000 SF
  • 10 Years
  • $38.35 CAD/SF/YR $3.20 CAD/SF/MO $383,494 CAD/YR $31,958 CAD/MO
  • Industrial
  • Full Build-Out
  • Now

FOR LEASE: BLACKWELL AI FOUNDRY & DATA PARK 10,000 SF Plug-and-Play AI Data Center | 1 MW | Federal Opportunity Zone Location: Blackwell, Oklahoma (I-35 Corridor) Total Space: 10,000 SF on 5-Acre AI Data Park (Expandable) Lease Rate: $150.00 / SF / YR (NNN) Status: Operational | Certificate of Occupancy (CO) in Hand ________________________________________ EXECUTIVE SUMMARY Rare opportunity to lease a fully commissioned, high-density data center in a Federal Opportunity Zone. Designed for AI, High-Performance Computing (HPC), and Enterprise workloads, this facility offers 1 MW of dedicated power and 125 tons of cooling. With a signed work order for 4 Gbps fiber, the site provides a "plug-and-play" environment with massive tax advantages for Qualified Opportunity Zone Businesses (QOZB). CRITICAL INFRASTRUCTURE • Power: 1 MW dedicated capacity (120/208V, 3-Phase). • Distribution: 3,200 Amps via 7 panels in a secured power room. Overhead 120/208V 3-Phase dispersed via ceiling hangers in all halls. • Cooling: 125 Tons total dedicated AC capacity. o Data Hall 1 (2,600 SF): 55 Tons AC o Data Hall 2 (2,400 SF): 50 Tons AC o Data Halls 3 & 4: Pre-configured for rapid deployment. • Connectivity: 4 Gbps Fiber (Work order signed with Bluepeak; installation pending). • Resiliency: Pre-built generator pad ready for immediate deployment. INVESTOR & TENANT ADVANTAGES • Federal Opportunity Zone: Significant tax-saving potential for tenants structured as a QOZB, including potential 0% capital gains on business appreciation over a 10-year hold. • Low Operational Cost: Located in a low-power-cost region with high-capacity municipal utilities operational. • Scalability: Sited on 5 acres with significant room for additional data modules or facility expansion. • Security: Fully fenced perimeter (6-foot chain-link with barbed wire). LOCATION & LOGISTICS Strategically located in Blackwell, OK, along the I-35 corridor, providing rapid logistical access to regional tech hubs while maintaining the privacy and security of a dedicated data park. ________________________________________ For leasing inquiries and site tours, contact: Rodney A. Babb - Blackwell Industrial Foundry 405-203-1948 rbabb@turtlecreekexec.com

  • Lease rate does not include utilities, property expenses or building services
  • Partitioned Offices
  • Laboratory
  • Security System
  • Emergency Lighting
  • Shower Facilities
  • DDA Compliant
  • Smoke Detector
  • Central Air and Heating
  • Private Restrooms
  • Wi-Fi Connectivity
  • Secure Storage
  • Plug & Play
  • Energy Performance Rating - A
  • Yard
  • Wheelchair Accessible
Space Size Term Rental Rate Space Use Condition Available
1st Floor 10,000 SF 10 Years $38.35 CAD/SF/YR $3.20 CAD/SF/MO $383,494 CAD/YR $31,958 CAD/MO Industrial Full Build-Out Now

1st Floor

Size
10,000 SF
Term
10 Years
Rental Rate
$38.35 CAD/SF/YR $3.20 CAD/SF/MO $383,494 CAD/YR $31,958 CAD/MO
Space Use
Industrial
Condition
Full Build-Out
Available
Now

1st Floor

Size 10,000 SF
Term 10 Years
Rental Rate $38.35 CAD/SF/YR
Space Use Industrial
Condition Full Build-Out
Available Now

FOR LEASE: BLACKWELL AI FOUNDRY & DATA PARK 10,000 SF Plug-and-Play AI Data Center | 1 MW | Federal Opportunity Zone Location: Blackwell, Oklahoma (I-35 Corridor) Total Space: 10,000 SF on 5-Acre AI Data Park (Expandable) Lease Rate: $150.00 / SF / YR (NNN) Status: Operational | Certificate of Occupancy (CO) in Hand ________________________________________ EXECUTIVE SUMMARY Rare opportunity to lease a fully commissioned, high-density data center in a Federal Opportunity Zone. Designed for AI, High-Performance Computing (HPC), and Enterprise workloads, this facility offers 1 MW of dedicated power and 125 tons of cooling. With a signed work order for 4 Gbps fiber, the site provides a "plug-and-play" environment with massive tax advantages for Qualified Opportunity Zone Businesses (QOZB). CRITICAL INFRASTRUCTURE • Power: 1 MW dedicated capacity (120/208V, 3-Phase). • Distribution: 3,200 Amps via 7 panels in a secured power room. Overhead 120/208V 3-Phase dispersed via ceiling hangers in all halls. • Cooling: 125 Tons total dedicated AC capacity. o Data Hall 1 (2,600 SF): 55 Tons AC o Data Hall 2 (2,400 SF): 50 Tons AC o Data Halls 3 & 4: Pre-configured for rapid deployment. • Connectivity: 4 Gbps Fiber (Work order signed with Bluepeak; installation pending). • Resiliency: Pre-built generator pad ready for immediate deployment. INVESTOR & TENANT ADVANTAGES • Federal Opportunity Zone: Significant tax-saving potential for tenants structured as a QOZB, including potential 0% capital gains on business appreciation over a 10-year hold. • Low Operational Cost: Located in a low-power-cost region with high-capacity municipal utilities operational. • Scalability: Sited on 5 acres with significant room for additional data modules or facility expansion. • Security: Fully fenced perimeter (6-foot chain-link with barbed wire). LOCATION & LOGISTICS Strategically located in Blackwell, OK, along the I-35 corridor, providing rapid logistical access to regional tech hubs while maintaining the privacy and security of a dedicated data park. ________________________________________ For leasing inquiries and site tours, contact: Rodney A. Babb - Blackwell Industrial Foundry 405-203-1948 rbabb@turtlecreekexec.com

  • Lease rate does not include utilities, property expenses or building services
  • Central Air and Heating
  • Partitioned Offices
  • Private Restrooms
  • Laboratory
  • Wi-Fi Connectivity
  • Security System
  • Secure Storage
  • Emergency Lighting
  • Plug & Play
  • Shower Facilities
  • Energy Performance Rating - A
  • DDA Compliant
  • Yard
  • Smoke Detector
  • Wheelchair Accessible

Property Overview

FOR LEASE: BLACKWELL AI FOUNDRY & DATA PARK 10,000 SF Plug-and-Play AI Data Center | 1 MW | Federal Opportunity Zone Location: Blackwell, Oklahoma (I-35 Corridor) Total Space: 10,000 SF on 5-Acre AI Data Park (Expandable) Lease Rate: $28.00 / SF / YR (NNN) Status: Operational | Certificate of Occupancy (CO) in Hand “A national survey of turnkey data-center leases shows comparable facilities ranging from $20–$50/SF/year. This Blackwell site delivers competitive mechanical capability with dramatically lower electric cost, faster utility response, and full scalability on 5 acres. The facility is also located just 1 millisecond from Google’s new Stillwater data center, positioning it as a hyperscale-adjacent edge location ideal for AI/GPU, HPC, hybrid cloud, and low-latency compute workloads.” This facility is priced at $28 per square foot per year, reflecting its unique position as a turnkey, high-capacity compute barn with infrastructure rarely available in this region. Tenants gain immediate access to climate-controlled industrial space, high-capacity power, fiber connectivity, natural gas service, and expansion-ready acreage, eliminating the long lead times and capital outlay typically required for AI/GPU, mining, and edge compute deployments. The property sits in a strategic gap between Oklahoma City and Wichita with no competing data center inventory, offering tenants a cost-efficient alternative to major-market rates that commonly exceed $40–$65/SF/YR for comparable power-ready space. The Opportunity Zone designation further enhances tenant economics. At $28/SF/YR, the site delivers exceptional value relative to national compute-oriented industrial comps while supporting rapid deployment and scalable growth. ________________________________________ EXECUTIVE SUMMARY Rare opportunity to lease a fully commissioned, high-density data center in a Federal Opportunity Zone. Designed for AI, High-Performance Computing (HPC), and Enterprise workloads, this facility offers 1 MW of dedicated power and 125 tons of cooling. With a signed work order for 4 Gbps fiber, the site provides a "plug-and-play" environment with massive tax advantages for Qualified Opportunity Zone Businesses (QOZB). CRITICAL INFRASTRUCTURE • Power: 1 MW dedicated capacity (120/208V, 3-Phase). • Distribution: 3,200 Amps via 7 panels in a secured power room. Overhead 120/208V 3-Phase dispersed via ceiling hangers in all halls. • Cooling: 125 Tons total dedicated AC capacity. o Data Hall 1 (2,600 SF): 55 Tons AC o Data Hall 2 (2,400 SF): 50 Tons AC o Data Halls 3 & 4: Pre-configured for rapid deployment. • Connectivity: 4 Gbps Fiber (Work order signed with Bluepeak; installation pending). • Resiliency: Pre-built generator pad ready for immediate deployment. INVESTOR & TENANT ADVANTAGES • Federal Opportunity Zone: Significant tax-saving potential for tenants structured as a QOZB, including potential 0% capital gains on business appreciation over a 10-year hold. • Low Operational Cost: Located in a low-power-cost region with high-capacity municipal utilities operational. • Scalability: Sited on 5 acres with significant room for additional data modules or facility expansion. • Security: Fully fenced perimeter (6-foot chain-link with barbed wire). LOCATION & LOGISTICS Strategically located in Blackwell, OK, along the I-35 corridor, providing rapid logistical access to regional tech hubs while maintaining the privacy and security of a dedicated data park. ________________________________________ For leasing inquiries and site tours, contact: Rodney A. Babb - Blackwell AI Foundry 405-203-1948 rbabb@turtlecreekexec.com

Data Center Facility Facts

Building Size
10,000 SF
Lot Size
5.00 AC
Year Built/Renovated
1980/2019
Construction
Steel
Water
City
Sewer
City
Heating
Electric
Gas
Natural
Power Supply
Amps: 3,200 Volts: 120-208 Phase: 3
Zoning
Industrial - Zoned industrial, permitted for data center, located in opportunity zone, estimated 1.0 ms Latency to new Google Data Center in Stillwater, OK,

Attachments

COO Data Center - Blackwell AI Foundry
Loop 28 Net summary 2-15-2026 (1)
  • Listing ID: 39434362

  • Date on Market: 2026-02-13

  • Last Updated:

  • Address: 402 S 29th St, Blackwell, OK 74631

Link copied
Your LoopNet account has been created!

Please Share Your Feedback

We welcome any feedback on how we can improve LoopNet to better serve your needs.
X
{{ getErrorText(feedbackForm.starRating, "rating") }}
255 character limit ({{ remainingChars() }} charactercharacters remainingover)
{{ getErrorText(feedbackForm.msg, "rating") }}
{{ getErrorText(feedbackForm.fname, "first name") }}
{{ getErrorText(feedbackForm.lname, "last name") }}
{{ getErrorText(feedbackForm.phone, "phone number") }}
{{ getErrorText(feedbackForm.phonex, "phone extension") }}
{{ getErrorText(feedbackForm.email, "email address") }}