Log In/Sign Up
Your email has been sent.
Matterport 3D Tour
Investment Highlights
- Newly delivered Class A warehouse facility with contemporary design and premium construction.
- Equipped with oversized docks, drive-in doors, and heavy power capacity to accommodate diverse industrial uses.
- Strategic access to major routes including I-81 and proximity to Dulles Airport for superior distribution reach.
- Located in an emerging regional market with documented labor force growth and expanding infrastructure.
Executive Summary
This modern industrial facility offers investors a rare opportunity to acquire a newly constructed Class A warehouse in the rapidly expanding Berryville market. Completed in 2023, the 67,000-square-foot building is designed with a full range of advanced features suited for manufacturing, distribution, and logistics operations. Its infrastructure includes oversized loading docks, multiple drive-in doors for seamless circulation, and heavy power capabilities to support high-volume throughput.
Positioned just 18 minutes from Interstate 81, 40 minutes from Washington Dulles International Airport, and approximately one hour from Washington, D.C., the site ensures exceptional regional and national connectivity. Berryville serves as a prime industrial hub in Clarke County, benefiting from consistent population and labor force growth, which enhances its long-term viability. With land availability constrained and new inventory extremely limited, this offering signifies an exclusive opportunity in a high-demand corridor that has witnessed significant economic momentum.
Set within the first phase of the Patriot Industrial Park development, the property combines aesthetic appeal with practical operational efficiency. This is an investment that aligns immediate utility with substantial long-term upside, positioned amid robust transportation networks and a strengthening industrial base.
Positioned just 18 minutes from Interstate 81, 40 minutes from Washington Dulles International Airport, and approximately one hour from Washington, D.C., the site ensures exceptional regional and national connectivity. Berryville serves as a prime industrial hub in Clarke County, benefiting from consistent population and labor force growth, which enhances its long-term viability. With land availability constrained and new inventory extremely limited, this offering signifies an exclusive opportunity in a high-demand corridor that has witnessed significant economic momentum.
Set within the first phase of the Patriot Industrial Park development, the property combines aesthetic appeal with practical operational efficiency. This is an investment that aligns immediate utility with substantial long-term upside, positioned amid robust transportation networks and a strengthening industrial base.
Matterport 3D Tour
1 of 1
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
Property Facts
| Sale Type | Investment or Owner User | Rentable Building Area | 67,000 SF |
| Property Type | Industrial | No. Stories | 1 |
| Building Class | B | Year Built | 2023 |
| Lot Size | 10.50 AC | Tenancy | Single |
| Zoning | IG - Industrial Uses: Manufacturing, Warehousing, and Distribution. Can also refer to a Light Industrial District, Low-Intensity industrial dist, etc. | ||
| Sale Type | Investment or Owner User |
| Property Type | Industrial |
| Building Class | B |
| Lot Size | 10.50 AC |
| Rentable Building Area | 67,000 SF |
| No. Stories | 1 |
| Year Built | 2023 |
| Tenancy | Single |
| Zoning | IG - Industrial Uses: Manufacturing, Warehousing, and Distribution. Can also refer to a Light Industrial District, Low-Intensity industrial dist, etc. |
Amenities
- Air Conditioning
Space Availability
- Space
- Size
- Space Use
- Build-Out
- Available
| Space | Size | Space Use | Build-Out | Available |
| 1st Floor | 67,000 SF | Industrial | Full Build-Out | Now |
1st Floor
| Size |
| 67,000 SF |
| Space Use |
| Industrial |
| Build-Out |
| Full Build-Out |
| Available |
| Now |
1 of 5
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1st Floor
| Size | 67,000 SF |
| Space Use | Industrial |
| Build-Out | Full Build-Out |
| Available | Now |
Somewhat walkable
20/100
Exceptionally drivable
90/100
Somewhat bikeable
30/100
Demographics
Regional Accessibility
City
Population
Miles
Drive Time
Washington
702,455
66
1 h 35 m
Philadelphia
1,584,138
194
4 h 8 m
New York
8,398,748
278
5 h 47 m
Columbus
892,533
336
6 h 38 m
Charlotte
872,498
373
7 h 2 m
Indianapolis
867,125
507
9 h 47 m
Access and Labor Force
10 Miles
Total Population
58,856
Total Labor Force
33,483
Unemployment Rate
2.96%
Median Household Income
$96,081
Warehouse Employees
3,851
High School Education Or Higher
89.80%
$ values in USD
Property Taxes
| Parcel Number | 14-A-56 | Improvements Assessment | $5,187,761 CAD |
| Land Assessment | $1,778,595 CAD | Total Assessment | $6,966,355 CAD |
Property Taxes
Parcel Number
14-A-56
Land Assessment
$1,778,595 CAD
Improvements Assessment
$5,187,761 CAD
Total Assessment
$6,966,355 CAD
Sale Advisors
Vito John Germinario, Chief Executive Officer
Vito is a seasoned professional serving as the Chief Executive Officer at Glass Projects Resource, Inc. since January 2005, accumulating an impressive 19 years and 1 month of experience in the industry. Based in Sterling, Virginia, Vito oversees and directs the strategic operations of the company. Additionally, he holds the position of Managing Principal at LGV Group, LLC, a role he has been dedicated to since March 2011, showcasing over 12 years and 11 months of commitment to the Sterling, Virginia community. Vito's leadership and expertise have played a pivotal role in the success and management of both Glass Projects Resource, Inc. and LGV Group, LLC.
1 of 20
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
Presented by
410 Jack Enders Blvd
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.







