Log In/Sign Up
Your email has been sent.
HIGHLIGHTS
- New roundabout, hard corner, with 100’ of frontage on Loveland Madeira Road and 375’ of frontage on new connector road.
- Total Corridor Project Preliminary Cost Estimate: $12,908,981.
LOT AVAILABLE
Display Rental Rate as
| Rental Rate |
|
Lot Size | 1.65 AC |
| Lease Term | Negotiable |
| Rental Rate | |
| Lease Term | Negotiable |
| Lot Size | 1.65 AC |
Pad Ready Drive-Thru Allowed New roundabout, hard corner, with 100’ of frontage on Loveland Maderia Road and 375’ of frontage on new connector road Total Corridor Project Preliminary Cost Estimate: $12,908,981
PROPERTY OVERVIEW
Utilites stubbed on site
PROPERTY FACTS
| Total Space Available | 1.65 AC | Property Subtype | Commercial |
| Property Type | Land | Proposed Use | Retail |
| Total Space Available | 1.65 AC |
| Property Type | Land |
| Property Subtype | Commercial |
| Proposed Use | Retail |
1 1
1 of 5
VIDEOS
MATTERPORT 3D EXTERIOR
MATTERPORT 3D TOUR
PHOTOS
STREET VIEW
STREET
MAP
1 of 1
Presented by
507 Loveland Madeira Rd
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.



