Log In/Sign Up
Your email has been sent.
71410 Columbia Blvd
Boardman, OR 97818
Data Center Land · Land For Sale
·
21.00 AC


Investment Highlights
- Up to 180,000 SF of Data Center to be Built
- Zoned Industrial
- Umatilla Electric Cooperative (UEC)
- Up to 50 MW of Power
- Abundant Fiber
- Call Howard for pricing
Executive Summary
The data center market in Boardman, Oregon is distinct due to its strategic location and large scale adjacent to the Columbia River.
Boardman is close to important Pacific Northwest markets, including Portland and Seattle, making it a good place for data infrastructure. The region also has a strong power grid, low-latency access to undersea cables, and excellent connectivity to government agencies and major metropolitan areas, making it a good place for collocation.
As of June 2024, the Boardman area had 372.2 MW of data center space under construction, with 91.8% of it pre-leased. This limited supply has led to rising rental rates for all sizes of space. The market is also being fueled by continued interest from hyperscale and AI companies.
Boardman is close to important Pacific Northwest markets, including Portland and Seattle, making it a good place for data infrastructure. The region also has a strong power grid, low-latency access to undersea cables, and excellent connectivity to government agencies and major metropolitan areas, making it a good place for collocation.
As of June 2024, the Boardman area had 372.2 MW of data center space under construction, with 91.8% of it pre-leased. This limited supply has led to rising rental rates for all sizes of space. The market is also being fueled by continued interest from hyperscale and AI companies.
Property Facts Under Contract
1 Lot Available
Lot
| Lot Size | 21.00 AC |
| Lot Size | 21.00 AC |
±914,760 SF of Data Center land. The site is not entitled, plans are conceptual. Up to 180,000 SF of data center to be built with up to 50 MW of power. The land is zoned for Industrial and there is abundant fiber.
Description
±914,760 SF of Data Center land. The site is not entitled, plans are conceptual. Up to 180,000 SF of data center to be built with up to 50 MW of power. The land is zoned for Industrial and there is abundant fiber.
1 of 4
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
