Your email has been sent.
INVESTMENT HIGHLIGHTS
- 13.4 acres of land zoned M-1 Light Industrial
- 63 trailer parking stalls, 233 passenger vehicle parking stalls
- ±3,000 amps of 480 volt power
- 35 dock loading positions, 2 ground level doors
- ±36’ min. clear height, Column spacing ±56’X60’
EXECUTIVE SUMMARY
The Roseville Parkway Extension Project includes construction of a:
• Four lane roadway between Washington and Foothills Blvds. (2 lanes in each direction);
• Bridge over Industrial Avenue and Union Pacific railroad tracks;
• Sidewalk;
]• Class II bike lanes; and
• Multi-use path.
• Landscaping;
PROPERTY FACTS
| Sale Type | Investment or Owner User | Rentable Building Area | 206,833 SF |
| Property Type | Industrial | No. Stories | 1 |
| Property Subtype | Warehouse | Parking Ratio | 1.13/1,000 SF |
| Building Class | B | Clear Ceiling Height | 36’ |
| Lot Size | 13.40 AC | No. Dock-High Doors/Loading | 35 |
| Construction Status | Proposed | No. Drive In / Grade-Level Doors | 2 |
| Zoning | M-1 - Light Industrial | ||
| Sale Type | Investment or Owner User |
| Property Type | Industrial |
| Property Subtype | Warehouse |
| Building Class | B |
| Lot Size | 13.40 AC |
| Construction Status | Proposed |
| Rentable Building Area | 206,833 SF |
| No. Stories | 1 |
| Parking Ratio | 1.13/1,000 SF |
| Clear Ceiling Height | 36’ |
| No. Dock-High Doors/Loading | 35 |
| No. Drive In / Grade-Level Doors | 2 |
| Zoning | M-1 - Light Industrial |
UTILITIES
- Gas
- Water
- Sewer
SPACE AVAILABILITY
- SPACE
- SIZE
- SPACE USE
- CONDITION
- AVAILABLE
• 13.4 acres of land • 35 dock loading positions • 2 ground level doors • 63 trailer parking stalls • 233 passenger vehicle parking stalls • ±36’ min. clear height • Column spacing ±56’X60’ • ±3,000 amps of 480 volt power • Zoning M-1 Light Industrial • ESFR sprinkler system • Placer County APN 017-232-007 • Water: 24” main in Foothills Blvd. • Sewer: 16” main in Foothills Blvd. and 8” in Niblick Dr. • Storm: 18” main in Foothills Blvd. and 30” in Niblick Dr. • Gas: PG&E • Telephone: Surewest • Electricity: Roseville Electric • Bonds: No Mello Roos
| Space | Size | Space Use | Condition | Available |
| 1st Floor | 206,833 SF | Industrial | Full Build-Out | Jan 2027 |
1st Floor
| Size |
| 206,833 SF |
| Space Use |
| Industrial |
| Condition |
| Full Build-Out |
| Available |
| Jan 2027 |
1st Floor
| Size | 206,833 SF |
| Space Use | Industrial |
| Condition | Full Build-Out |
| Available | Jan 2027 |
• 13.4 acres of land • 35 dock loading positions • 2 ground level doors • 63 trailer parking stalls • 233 passenger vehicle parking stalls • ±36’ min. clear height • Column spacing ±56’X60’ • ±3,000 amps of 480 volt power • Zoning M-1 Light Industrial • ESFR sprinkler system • Placer County APN 017-232-007 • Water: 24” main in Foothills Blvd. • Sewer: 16” main in Foothills Blvd. and 8” in Niblick Dr. • Storm: 18” main in Foothills Blvd. and 30” in Niblick Dr. • Gas: PG&E • Telephone: Surewest • Electricity: Roseville Electric • Bonds: No Mello Roos
PROPERTY TAXES
| Parcel Number | 017-232-037 | Improvements Assessment | $0 CAD |
| Land Assessment | $5,921,899 CAD | Total Assessment | $5,921,899 CAD |
PROPERTY TAXES
Presented by
751 Roseville Pky
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.




