Your email has been sent.
Park Highlights
- Concrete Tiltwall Construction Dock High and Front Loading Drive-In Ramps Fully Sprinklered 30'x30' Column Spacing Easy Access to Highway 290, Beltw
Park Facts
Features and Amenities
- 24 Hour Access
- Signage
All Available Space(1)
Display Rental Rate as
- Space
- Size
- Term
- Rental Rate
- Space Use
- Condition
- Available
Master Planned Business Park Concrete Tilt Wall Construction (6) Dock High Front Loading Doors (1) Oversized Dock Door (1) Ramp 22' Clear Height 100% Fire Sprinklered All Concrete Paving
- Includes 4,185 SF of dedicated office space
- 7 Loading Docks
- Easy Access to Hwy 290, Beltway 8, and Loop 610
- 1 Drive Bay
- Central Air Conditioning
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| 1st Floor - 9326 | 40,275 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request | Industrial | - | 2026-11-01 |
9300-9350 Baythorne Dr - 1st Floor - 9326
9300-9350 Baythorne Dr - 1st Floor - 9326
| Size | 40,275 SF |
| Term | Negotiable |
| Rental Rate | Upon Request |
| Space Use | Industrial |
| Condition | - |
| Available | 2026-11-01 |
Master Planned Business Park Concrete Tilt Wall Construction (6) Dock High Front Loading Doors (1) Oversized Dock Door (1) Ramp 22' Clear Height 100% Fire Sprinklered All Concrete Paving
- Includes 4,185 SF of dedicated office space
- 1 Drive Bay
- 7 Loading Docks
- Central Air Conditioning
- Easy Access to Hwy 290, Beltway 8, and Loop 610
Park Overview
Concrete Tiltwall Construction Dock High and Front Loading Drive-In Ramps Fully Sprinklered 30'x30' Column Spacing Easy Access to Highway 290, Beltway 8, I-10, & 610
Presented by
Northwest Industrial Park | Houston, TX 77041
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.




