Log In/Sign Up
Your email has been sent.
Investment Highlights
- Prime established commercial location on the A5 in Rugby
- Europark lies within the ‘Golden Triangle’ placing approximately 85% of England and Wales within 4 hours drive time
- Junctions 18 and 20 of the M1, Junction 1 of the M6 and the A14 all accessible within minutes
- Short distance from Magna Park (Lutterworth) to the north and DIRFT to the south
Executive Summary
All enabling infrastructure is completed. Construction can commence on completion of all legal documentation, allowing for the building to be completed in as little as 10-12 months.
To buy or rent. Terms available on request.
To buy or rent. Terms available on request.
Property Facts
| Sale Type | Investment or Owner User | Construction Status | Proposed |
| Tenure | Freehold | Rentable Building Area | 24,052 SF |
| Property Type | Industrial | No. Stories | 1 |
| Property Subtype | Warehouse | Year Built | 2026 |
| Building Class | B | Tenancy | Single |
| Lot Size | 34.36 AC | Clear Ceiling Height | 29’5” (8.97 m) |
| Sale Type | Investment or Owner User |
| Tenure | Freehold |
| Property Type | Industrial |
| Property Subtype | Warehouse |
| Building Class | B |
| Lot Size | 34.36 AC |
| Construction Status | Proposed |
| Rentable Building Area | 24,052 SF |
| No. Stories | 1 |
| Year Built | 2026 |
| Tenancy | Single |
| Clear Ceiling Height | 29’5” (8.97 m) |
Amenities
- Automatic Blinds
Space Availability
- Space
- Size
- Space Use
- Build-Out
- Available
All enabling infrastructure is completed. Construction can commence on completion of all legal documentation, allowing for the building to be completed in as little as 10-12 months.
| Space | Size | Space Use | Build-Out | Available |
| Ground | 24,052 SF | Industrial | Shell Space | Now |
Ground
| Size |
| 24,052 SF |
| Space Use |
| Industrial |
| Build-Out |
| Shell Space |
| Available |
| Now |
Ground
| Size | 24,052 SF |
| Space Use | Industrial |
| Build-Out | Shell Space |
| Available | Now |
All enabling infrastructure is completed. Construction can commence on completion of all legal documentation, allowing for the building to be completed in as little as 10-12 months.
1 1
1 of 3
Videos
Matterport 3D Exterior
Matterport 3D Tour
Photos
Street View
Street
Map
1 of 1
Presented by
Phase 2 | A5 Watling St
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.


