Your email has been sent.
Riverport Parkway - Riverport Commerce Center | Phase 3 30 - 120 Acre Industrial Land Lots in Hardeeville, SC 29927

Investment Highlights
- Flexible Pod sizes ranging from ±30 - 150 AC
- Only 10 Miles from the GPA's Garden City Terminal
- Over 3.9 million SF of development potential
Executive Summary
The offering consists of three separate industrial pods, and Seller will entertain offers for the individual pods or for multiple pods. (Flexible Pod Sizes ranging from 30-150 AC)
Pod A: ±201.74 Gross AC with three buildings (±1,616,090 SF)
Pod B: ±123.74 Gross AC with two buildings (±1,114,686 SF)
Pod C: ±63.19 Gross AC with three buildings (±380,700 SF)
Pod D: ±65.44 Gross AC with 1 building (±910,000 SF)
Completed Entitlements
• Zoned Industrial (City of Hardeeville, SC)
• 404 Wetland Permit Complete
• Wetlands Mitigated for warehouse construction per approved Master Plan
• Initial Master Plan Approved (City of Hardeeville, SC)
• Master Utility Agreement with Dominion Power
• Riverport Parkway Extension Building Permit in hand - construction to start Q2 2026
• Water/Sewer Development Agreement Complete with utility infrastructure under construction
Property Facts
2 Lots Available
Lot 1
| Lot Size | 30.00 AC |
| Lot Size | 30.00 AC |
Industrial land 10 miles from Port of Savannah. Entitled, utility-served, with new parkway access. Seller offering flexible pod sizes ±30–150 AC. Ideal for logistics and warehouse development.
Lot
| Lot Size | 120.00 AC |
| Lot Size | 120.00 AC |
Industrial land 10 miles from Port of Savannah. Entitled, utility-served, with new parkway access. Seller offering flexible pod sizes ±30–150 AC. Ideal for logistics and warehouse development.
Description
Completed Entitlements: • Zoned Industrial (City of Hardeeville, SC) • 404 Wetland Permit Complete • Wetlands Mitigated for warehouse construction per approved Master Plan • Initial Master Plan Approved (City of Hardeeville, SC) • Master Utility Agreement with Dominion Power • Riverport Parkway Extension Building Permit in hand - construction to start Q2 2026 • Water/Sewer Development Agreement Complete with utility infrastructure under construction
Presented by
Riverport Parkway - Riverport Commerce Center | Phase 3
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.
