Your email has been sent.
HIGHLIGHTS
- Delivery within 18 months
- Target BREAAM Excellent
- Target EPC A
FEATURES
ALL AVAILABLE SPACE(1)
Display Rental Rate as
- SPACE
- SIZE
- TERM
- RENTAL RATE
- SPACE USE
- CONDITION
- AVAILABLE
Owners are in the process of seeking detailed planning consent and it is expected that delivery of the building could be as early as 18 months from the date terms are agreed. There is also the opportunity for the occupier to make minor changes to the building in advance of the construction start date. Plans of the building are available on request
- Use Class: Class 5
- 4 Drive Ins
- New build
- Gatehouse
- Includes 15,000 SF of dedicated office space
- 16 Loading Docks
- Two buildings
| Space | Size | Term | Rental Rate | Space Use | Condition | Available |
| Ground | 235,000 SF | Negotiable | Upon Request Upon Request Upon Request Upon Request | Industrial | Full Build-Out | 2026-12-16 |
Ground
| Size |
| 235,000 SF |
| Term |
| Negotiable |
| Rental Rate |
| Upon Request Upon Request Upon Request Upon Request |
| Space Use |
| Industrial |
| Condition |
| Full Build-Out |
| Available |
| 2026-12-16 |
Ground
| Size | 235,000 SF |
| Term | Negotiable |
| Rental Rate | Upon Request |
| Space Use | Industrial |
| Condition | Full Build-Out |
| Available | 2026-12-16 |
Owners are in the process of seeking detailed planning consent and it is expected that delivery of the building could be as early as 18 months from the date terms are agreed. There is also the opportunity for the occupier to make minor changes to the building in advance of the construction start date. Plans of the building are available on request
- Use Class: Class 5
- Includes 15,000 SF of dedicated office space
- 4 Drive Ins
- 16 Loading Docks
- New build
- Two buildings
- Gatehouse
PROPERTY OVERVIEW
The building will comprise a distribution or logistics building with supporting office accommodation fronting directly onto Strand Drive. The main warehouse will be of steel portal frame construction with a minimum eaves height of 12.5m. The wall and roof cladding will be insulated panelling and the roof is inset with translucent panels providing a good level of natural light internally. The staff and visitor car parking is to the front of the building and will be separate from the HGV access and circulation area.
DISTRIBUTION FACILITY FACTS
Presented by
Unit 1 | Strand Dr
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.



