Se Connecter/S’inscrire
Votre courriel a été envoyé.
0 Dobbs Mountain Rd - Battery Energy Storage System Opportunity Lot • Terrain industriel • 49 Acres • Villa Rica, GA 30180

Certaines informations ont été traduites automatiquement.
FAITS SAILLANTS DE L'INVESTISSEMENT
- Strategic BESS site near existing transmission infrastructure in metro Atlanta
- Atlanta is the #2 U.S. data center market with 2,159 MW under construction
- Low Latency: Long Haul and Regional Fiber within 1500 feet
- Sustainable Load Growth Support: Grid Scale BESS project - 500 kV Bus and 280 kV Bus lines
- High capacity potential with modest upgrade spend: 1 GW Injection is possible
- Regulatory Support: Georgia Public Service Commission (PSC) actively approving BESS projects through Integrated Resource Plan (IRP) process
RÉSUMÉ DE L'ANNONCE
Unique opportunity to participate in the sustainable solution for the unprecedented metro Atlanta data and power consumption growth. This is not a data center project. This is a Battery Energy Storage System (BESS) project. This is a sustainable energy solution through peak shaving and curtailment, adding energy back to the grid when its needed. NO ENERGY CONSUMPTION. BESS will reduce peak demand on the grid by discharging energy that is stored during non-peak periods during peak periods, when the grid is most stressed.
FAITS SUR LA PROPRIÉTÉ
1 LOT DISPONIBLE
Lot
| Taille du lot | 49,00 AC |
| Taille du lot | 49,00 AC |
Raw land, gentle slope
DESCRIPTION
Land located adjacent to GPC's Villa Rica substation, as well as the intersection of two high voltage transmission lines. 500kV Offtake Projection. 1+ GW injection opportunity with modest upgrade costs.
1 1
1 de 2
VIDÉOS
VISITE EXTÉRIEURE 3D MATTERPORT
VISITE 3D MATTERPORT
PHOTOS
VUE DEPUIS LA RUE
RUE
CARTE
1 de 1
Présenté par
0 Dobbs Mountain Rd - Battery Energy Storage System Opportunity
Vous êtes déjà membre? Connectez-vous
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.
