Votre courriel a été envoyé.
Pin Green Industrial Estate 1-4 Units 2, 7 & 8, Pin Green Industrial Estate 165–17 274 pi² d'espace disponible • Industriel • Stevenage SG1 4QJ



Certaines informations ont été traduites automatiquement.
Faits saillants
- Superb dual carriageway links to A1(M).
- To be refubished.
- Generous allocated parking and exclusive loading areas.
- Target EPC rating - B.
- Excellent established location.
- Steel portal frame construction with clear warehouse space.
- Eaves height 7.4m (ridge 8.4m).
Caractéristiques
Tous les espaces disponibles(6)
Afficher les taux de location en
- Espace
- Taille
- Terme
- Taux de location
- Utilisation de l’espace
- Aménagement
- Disponible
Unit 4 is positioned at the front of the estate. It is a mid terraced unit with 2-storey front offices and rear loading. The warehouse offers a single uninterrupted space with an eaves of 7.4m (ridge 8.4m).
- Classe d’utilisation : B8
- Cote de rendement énergétique - B
- Recently refurbished
- LED motion sensory lighting throughout
- Espace en excellent état
- Prominent unit on Cartwright Road
- Electric loading door
Unit 7 comprises a mid-terrace warehouse with front two-storey offices. The warehouse provides clear space with an eaves height of 5.4m.
- Classe d’utilisation : B8
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 9 276 pi² d’espace adjacent.
- Espace en excellent état
- Cote de rendement énergétique - B
Unit 8 comprises an end of terrace unit with front two-storey offices. The warehouse provides clear space with an eaves height of 5.4m.
- Classe d’utilisation : B8
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 9 276 pi² d’espace adjacent.
- Espace en excellent état
- Cote de rendement énergétique - B
Unit 2 is positioned at the front of the estate. It is a mid terraced unit with 2-storey front offices and rear loading. The warehouse offers a single uninterrupted space with an eaves of 7.4m (ridge 8.4m).
- Classe d’utilisation : B8
- Cote de rendement énergétique - B
- Espace en excellent état
Unit 7 comprises a mid-terrace warehouse with front two-storey offices. The warehouse provides clear space with an eaves height of 5.4m.
- Classe d’utilisation : B8
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 9 276 pi² d’espace adjacent.
- Espace en excellent état
- Cote de rendement énergétique - B
Unit 8 comprises an end of terrace unit with front two-storey offices. The warehouse provides clear space with an eaves height of 5.4m.
- Classe d’utilisation : B8
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 9 276 pi² d’espace adjacent.
- Espace en excellent état
- Cote de rendement énergétique - B
| Espace | Taille | Terme | Taux de location | Utilisation de l’espace | Aménagement | Disponible |
| RDC - Unit 2 | 7 238 à 7 618 pi² | Négociable | 24,36 $ CAD/pi²/an 2,03 $ CAD/pi²/mois 185 582 $ CAD/an 15 465 $ CAD/mois | Industriel | construction partielle | Maintenant |
| RDC - Unit 7 | 3 478 pi² | Négociable | 24,36 $ CAD/pi²/an 2,03 $ CAD/pi²/mois 84 728 $ CAD/an 7 061 $ CAD/mois | Industriel | construction partielle | Maintenant |
| RDC - Unit 8 | 5 463 pi² | Négociable | 24,36 $ CAD/pi²/an 2,03 $ CAD/pi²/mois 133 084 $ CAD/an 11 090 $ CAD/mois | Industriel | construction partielle | Maintenant |
| 1er étage - Unit 2 | 380 pi² | Négociable | 24,36 $ CAD/pi²/an 2,03 $ CAD/pi²/mois 9 257 $ CAD/an 771,43 $ CAD/mois | Industriel | construction partielle | Maintenant |
| 1er étage - Unit 7 | 170 pi² | Négociable | 24,36 $ CAD/pi²/an 2,03 $ CAD/pi²/mois 4 141 $ CAD/an 345,11 $ CAD/mois | Industriel | construction partielle | Maintenant |
| 1er étage - Unit 8 | 165 pi² | Négociable | 24,36 $ CAD/pi²/an 2,03 $ CAD/pi²/mois 4 020 $ CAD/an 334,96 $ CAD/mois | Industriel | construction partielle | Maintenant |
RDC - Unit 2
| Taille |
| 7 238 à 7 618 pi² |
| Terme |
| Négociable |
| Taux de location |
| 24,36 $ CAD/pi²/an 2,03 $ CAD/pi²/mois 185 582 $ CAD/an 15 465 $ CAD/mois |
| Utilisation de l’espace |
| Industriel |
| Aménagement |
| construction partielle |
| Disponible |
| Maintenant |
RDC - Unit 7
| Taille |
| 3 478 pi² |
| Terme |
| Négociable |
| Taux de location |
| 24,36 $ CAD/pi²/an 2,03 $ CAD/pi²/mois 84 728 $ CAD/an 7 061 $ CAD/mois |
| Utilisation de l’espace |
| Industriel |
| Aménagement |
| construction partielle |
| Disponible |
| Maintenant |
RDC - Unit 8
| Taille |
| 5 463 pi² |
| Terme |
| Négociable |
| Taux de location |
| 24,36 $ CAD/pi²/an 2,03 $ CAD/pi²/mois 133 084 $ CAD/an 11 090 $ CAD/mois |
| Utilisation de l’espace |
| Industriel |
| Aménagement |
| construction partielle |
| Disponible |
| Maintenant |
1er étage - Unit 2
| Taille |
| 380 pi² |
| Terme |
| Négociable |
| Taux de location |
| 24,36 $ CAD/pi²/an 2,03 $ CAD/pi²/mois 9 257 $ CAD/an 771,43 $ CAD/mois |
| Utilisation de l’espace |
| Industriel |
| Aménagement |
| construction partielle |
| Disponible |
| Maintenant |
1er étage - Unit 7
| Taille |
| 170 pi² |
| Terme |
| Négociable |
| Taux de location |
| 24,36 $ CAD/pi²/an 2,03 $ CAD/pi²/mois 4 141 $ CAD/an 345,11 $ CAD/mois |
| Utilisation de l’espace |
| Industriel |
| Aménagement |
| construction partielle |
| Disponible |
| Maintenant |
1er étage - Unit 8
| Taille |
| 165 pi² |
| Terme |
| Négociable |
| Taux de location |
| 24,36 $ CAD/pi²/an 2,03 $ CAD/pi²/mois 4 020 $ CAD/an 334,96 $ CAD/mois |
| Utilisation de l’espace |
| Industriel |
| Aménagement |
| construction partielle |
| Disponible |
| Maintenant |
RDC - Unit 2
| Taille | 7 238 à 7 618 pi² |
| Terme | Négociable |
| Taux de location | 24,36 $ CAD/pi²/an |
| Utilisation de l’espace | Industriel |
| Aménagement | construction partielle |
| Disponible | Maintenant |
Unit 4 is positioned at the front of the estate. It is a mid terraced unit with 2-storey front offices and rear loading. The warehouse offers a single uninterrupted space with an eaves of 7.4m (ridge 8.4m).
- Classe d’utilisation : B8
- Espace en excellent état
- Cote de rendement énergétique - B
- Prominent unit on Cartwright Road
- Recently refurbished
- Electric loading door
- LED motion sensory lighting throughout
RDC - Unit 7
| Taille | 3 478 pi² |
| Terme | Négociable |
| Taux de location | 24,36 $ CAD/pi²/an |
| Utilisation de l’espace | Industriel |
| Aménagement | construction partielle |
| Disponible | Maintenant |
Unit 7 comprises a mid-terrace warehouse with front two-storey offices. The warehouse provides clear space with an eaves height of 5.4m.
- Classe d’utilisation : B8
- Espace en excellent état
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 9 276 pi² d’espace adjacent.
- Cote de rendement énergétique - B
RDC - Unit 8
| Taille | 5 463 pi² |
| Terme | Négociable |
| Taux de location | 24,36 $ CAD/pi²/an |
| Utilisation de l’espace | Industriel |
| Aménagement | construction partielle |
| Disponible | Maintenant |
Unit 8 comprises an end of terrace unit with front two-storey offices. The warehouse provides clear space with an eaves height of 5.4m.
- Classe d’utilisation : B8
- Espace en excellent état
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 9 276 pi² d’espace adjacent.
- Cote de rendement énergétique - B
1er étage - Unit 2
| Taille | 380 pi² |
| Terme | Négociable |
| Taux de location | 24,36 $ CAD/pi²/an |
| Utilisation de l’espace | Industriel |
| Aménagement | construction partielle |
| Disponible | Maintenant |
Unit 2 is positioned at the front of the estate. It is a mid terraced unit with 2-storey front offices and rear loading. The warehouse offers a single uninterrupted space with an eaves of 7.4m (ridge 8.4m).
- Classe d’utilisation : B8
- Espace en excellent état
- Cote de rendement énergétique - B
1er étage - Unit 7
| Taille | 170 pi² |
| Terme | Négociable |
| Taux de location | 24,36 $ CAD/pi²/an |
| Utilisation de l’espace | Industriel |
| Aménagement | construction partielle |
| Disponible | Maintenant |
Unit 7 comprises a mid-terrace warehouse with front two-storey offices. The warehouse provides clear space with an eaves height of 5.4m.
- Classe d’utilisation : B8
- Espace en excellent état
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 9 276 pi² d’espace adjacent.
- Cote de rendement énergétique - B
1er étage - Unit 8
| Taille | 165 pi² |
| Terme | Négociable |
| Taux de location | 24,36 $ CAD/pi²/an |
| Utilisation de l’espace | Industriel |
| Aménagement | construction partielle |
| Disponible | Maintenant |
Unit 8 comprises an end of terrace unit with front two-storey offices. The warehouse provides clear space with an eaves height of 5.4m.
- Classe d’utilisation : B8
- Espace en excellent état
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 9 276 pi² d’espace adjacent.
- Cote de rendement énergétique - B
Aperçu de la propriété
Stevenage is located between junctions 7 and 8 of the A1(M) approximately 25 miles north of London and 16 miles north of Junction23 of the M25. The A505 provided fast east/west communications between Luton and the M1 Cambridge and M11. Stevenage intercity station provides a fast service to London Kings Cross with a minimum travel time of only 19 minutes. Stevenage is a modern new town served by efficient system of dual carriageways and has a particularly strong base of hi-tech industries in the pharmaceutical, aerospace and defence sectors. Cartwright Road is located in the Pin Green commercial area on the north east side of the town with dual carriageway links to both A1(M) Junctions. Pin Green Industrial Estate comprises 8 Units arranged in two terraces with excellent HGV turning and loading areas. The entire estate has been upgraded which included a programme of external redecorations and new signage to all units.
Faits sur l’installation entrepôt
Présenté par
Entreprise non fournie
Pin Green Industrial Estate | 1-4 Units 2, 7 & 8, Pin Green Industrial Estate
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.






