Votre courriel a été envoyé.
Chichester Business Park 1 Pear Tree Knap 8 040–24 660 pi² d'espace disponible • Industriel • Chichester PO20 2NX

Certaines informations ont été traduites automatiquement.
FAITS SAILLANTS
- Places de stationnement sur place
- La phase 1 a été construite selon des normes d'efficacité énergétique élevées, pour atteindre les EPC classés A
- Bornes de recharge pour véhicules électriques doubles dédiées ainsi que 8 chargeurs de VE communs
TOUS LES ESPACES DISPONIBLES(3)
Afficher les taux de location en
- ESPACE
- TAILLE
- TERME
- TAUX DE LOCATION
- UTILISATION DE L’ESPACE
- ÉTAT
- DISPONIBLE
The first phase of development was completed in Q1 2024, and comprises 9 industrial/warehouse units of steel portal frame construction with metal and timber clad elevations beneath a pitched roof. Phase two will be an identical specification albeit minimum eaves range from 7.3m to 10m, along with electric level access doors and yard depths of over 20m. Each unit will benefit from translucent roof lights and solar panels on the roof, providing green energy electricity to the development. Externally, the units have the dedicated spaces shown in the schedule of accommodation table and there will also be generous communal car parking provision including disabled parking spaces. Each unit has at least one double EV charger and there are also 8 communal EV charging points.
- Classe d’utilisation : B2
- Salle de bains privée
- Lumière naturelle
- Cour
- Portes de chargement à accès au niveau électrique
- Dégagement d'une hauteur minimale d'avant-toits d'au moins 7,3 m
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 24 660 pi² d’espace adjacent.
- Entreposage sécurisé
- Stores automatiques
- Bail professionnel
- Lampes de toit translucides installées
The first phase of development was completed in Q1 2024, and comprises 9 industrial/warehouse units of steel portal frame construction with metal and timber clad elevations beneath a pitched roof. Phase two will be an identical specification albeit minimum eaves range from 7.3m to 10m, along with electric level access doors and yard depths of over 20m. Each unit will benefit from translucent roof lights and solar panels on the roof, providing green energy electricity to the development. Externally, the units have the dedicated spaces shown in the schedule of accommodation table and there will also be generous communal car parking provision including disabled parking spaces. Each unit has at least one double EV charger and there are also 8 communal EV charging points.
- Classe d’utilisation : B2
- Salle de bains privée
- Lumière naturelle
- Cour
- Portes de chargement à accès au niveau électrique
- Dégagement d'une hauteur minimale d'avant-toits d'au moins 7,3 m
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 24 660 pi² d’espace adjacent.
- Entreposage sécurisé
- Stores automatiques
- Bail professionnel
- Lampes de toit translucides installées
The first phase of development was completed in Q1 2024, and comprises 9 industrial/warehouse units of steel portal frame construction with metal and timber clad elevations beneath a pitched roof. Phase two will be an identical specification albeit minimum eaves range from 7.3m to 10m, along with electric level access doors and yard depths of over 20m. Each unit will benefit from translucent roof lights and solar panels on the roof, providing green energy electricity to the development. Externally, the units have the dedicated spaces shown in the schedule of accommodation table and there will also be generous communal car parking provision including disabled parking spaces. Each unit has at least one double EV charger and there are also 8 communal EV charging points.
- Classe d’utilisation : B2
- Salle de bains privée
- Lumière naturelle
- Cour
- Portes de chargement à accès au niveau électrique
- Dégagement d'une hauteur minimale d'avant-toits d'au moins 7,3 m
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 24 660 pi² d’espace adjacent.
- Entreposage sécurisé
- Stores automatiques
- Bail professionnel
- Lampes de toit translucides installées
| Espace | Taille | Terme | Taux de location | Utilisation de l’espace | État | Disponible |
| RDC - 3 | 8 040 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | construction partielle | 2026-01-19 |
| RDC - 4 | 8 310 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | construction partielle | 2026-01-19 |
| RDC - 5 | 8 310 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | construction partielle | 2026-01-19 |
RDC - 3
| Taille |
| 8 040 pi² |
| Terme |
| Négociable |
| Taux de location |
| Sur demande Sur demande Sur demande Sur demande |
| Utilisation de l’espace |
| Industriel |
| État |
| construction partielle |
| Disponible |
| 2026-01-19 |
RDC - 4
| Taille |
| 8 310 pi² |
| Terme |
| Négociable |
| Taux de location |
| Sur demande Sur demande Sur demande Sur demande |
| Utilisation de l’espace |
| Industriel |
| État |
| construction partielle |
| Disponible |
| 2026-01-19 |
RDC - 5
| Taille |
| 8 310 pi² |
| Terme |
| Négociable |
| Taux de location |
| Sur demande Sur demande Sur demande Sur demande |
| Utilisation de l’espace |
| Industriel |
| État |
| construction partielle |
| Disponible |
| 2026-01-19 |
RDC - 3
| Taille | 8 040 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| État | construction partielle |
| Disponible | 2026-01-19 |
The first phase of development was completed in Q1 2024, and comprises 9 industrial/warehouse units of steel portal frame construction with metal and timber clad elevations beneath a pitched roof. Phase two will be an identical specification albeit minimum eaves range from 7.3m to 10m, along with electric level access doors and yard depths of over 20m. Each unit will benefit from translucent roof lights and solar panels on the roof, providing green energy electricity to the development. Externally, the units have the dedicated spaces shown in the schedule of accommodation table and there will also be generous communal car parking provision including disabled parking spaces. Each unit has at least one double EV charger and there are also 8 communal EV charging points.
- Classe d’utilisation : B2
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 24 660 pi² d’espace adjacent.
- Salle de bains privée
- Entreposage sécurisé
- Lumière naturelle
- Stores automatiques
- Cour
- Bail professionnel
- Portes de chargement à accès au niveau électrique
- Lampes de toit translucides installées
- Dégagement d'une hauteur minimale d'avant-toits d'au moins 7,3 m
RDC - 4
| Taille | 8 310 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| État | construction partielle |
| Disponible | 2026-01-19 |
The first phase of development was completed in Q1 2024, and comprises 9 industrial/warehouse units of steel portal frame construction with metal and timber clad elevations beneath a pitched roof. Phase two will be an identical specification albeit minimum eaves range from 7.3m to 10m, along with electric level access doors and yard depths of over 20m. Each unit will benefit from translucent roof lights and solar panels on the roof, providing green energy electricity to the development. Externally, the units have the dedicated spaces shown in the schedule of accommodation table and there will also be generous communal car parking provision including disabled parking spaces. Each unit has at least one double EV charger and there are also 8 communal EV charging points.
- Classe d’utilisation : B2
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 24 660 pi² d’espace adjacent.
- Salle de bains privée
- Entreposage sécurisé
- Lumière naturelle
- Stores automatiques
- Cour
- Bail professionnel
- Portes de chargement à accès au niveau électrique
- Lampes de toit translucides installées
- Dégagement d'une hauteur minimale d'avant-toits d'au moins 7,3 m
RDC - 5
| Taille | 8 310 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| État | construction partielle |
| Disponible | 2026-01-19 |
The first phase of development was completed in Q1 2024, and comprises 9 industrial/warehouse units of steel portal frame construction with metal and timber clad elevations beneath a pitched roof. Phase two will be an identical specification albeit minimum eaves range from 7.3m to 10m, along with electric level access doors and yard depths of over 20m. Each unit will benefit from translucent roof lights and solar panels on the roof, providing green energy electricity to the development. Externally, the units have the dedicated spaces shown in the schedule of accommodation table and there will also be generous communal car parking provision including disabled parking spaces. Each unit has at least one double EV charger and there are also 8 communal EV charging points.
- Classe d’utilisation : B2
- Peut être associé à un ou plusieurs espaces supplémentaires pour obtenir jusqu’à 24 660 pi² d’espace adjacent.
- Salle de bains privée
- Entreposage sécurisé
- Lumière naturelle
- Stores automatiques
- Cour
- Bail professionnel
- Portes de chargement à accès au niveau électrique
- Lampes de toit translucides installées
- Dégagement d'une hauteur minimale d'avant-toits d'au moins 7,3 m
APERÇU DE LA PROPRIÉTÉ
Ces unités constituent la phase 2 de ce parc d'affaires moderne de haute qualité, dont la phase 1 a été achevée au premier trimestre de 2024 et les locataires occupent maintenant plus de 50 % du site. La phase 2 comprend les unités 3-5 et les unités 13-14, disponibles individuellement ou au moyen d'une combinaison d'unités. Les dimensions varient de 8 040 pieds carrés à environ 24 660 pieds carrés lors de la combinaison. Toutes les unités ont obtenu un consentement de planification pour l'installation de 50 % de mezzanines, ce qui permet immédiatement d'augmenter la surface au sol pour les occupants. La ville historique de Cathedral City et de County Town of West Sussex est située sur l'artère A27 de la côte sud, à mi-chemin entre Southampton et Brighton et à seulement 65 milles au sud-ouest de London. Plusieurs entreprises nationales et internationales se sont établies dans le district de Chichester pour profiter du profil d'emploi et des attraits liés au style de vie de la ville et des environs. Chichester est la maison de Rolls Royce, dont le siège social mondial et l'installation de production de 600 000 pieds carrés sont situés à Goodwood. Le parc d'affaires Chichester est stratégiquement situé à quatre milles à l'est de Chichester et offre un accès immédiat à l'artère A27/M27 de la côte sud.
FAITS SUR L’INSTALLATION INDUSTRIEL
Présenté par
Chichester Business Park | 1 Pear Tree Knap
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.
