Se Connecter/S’inscrire
Votre courriel a été envoyé.
Certaines informations ont été traduites automatiquement.
LOT Disponible
Afficher les taux de location en
| Taux de location |
|
Taille du lot | 5,00 AC |
| Durée du bail | Négociable |
| Taux de location | |
| Durée du bail | Négociable |
| Taille du lot | 5,00 AC |
The Landlord is planning to lay down gravel and fence in this fantastic IOS opportunity. The pad has access from three sides and backs up to the building in the front of the project. The 6-building development to the north also has availability (10,000-50,000 SF) where this IOS can be part of a building lease. The industrial park located on BFG 9000 Way in Taylor is less than 10 minutes from the Samsung site and 1.5 miles north from the newest bridge over highway 79.
Aperçu de la propriété
The Landlord is planning to lay down gravel and fence in this fantastic IOS opportunity. The pad has access from three sides and backs up to the building in the front of the project. The 6-building development to the north also has availability (10,000-50,000 SF) where this IOS can be part of a building lease. The industrial park located on BFG 9000 Way in Taylor is less than 10 minutes from the Samsung site and 1.5 miles north from the newest bridge over highway 79.
Faits sur la propriété
Inaccessible à pied
10/100
Exceptionnellement adapté aux voitures
100/100
Inaccessible en vélo
10/100
1 de 6
Vidéos
Visite extérieure 3D Matterport
Visite 3D Matterport
Photos
Vue depuis la rue
Rue
Carte
Présenté par
120 Bfg 9000 Way
Vous êtes déjà membre? Connectez-vous
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.




