Votre courriel a été envoyé.
Certaines informations ont été traduites automatiquement.
Faits saillants
- 3 Building Industrial Park in Cypress
- Clear Height 20' at the Eaves
- Buildings 2 and 3 in construction, estimated completion Sept 2026
- Fenced Park on 2.60 AC site with 24hr access
- 3 Phase Power
- Functional layout for truck access
Caractéristiques
Tous les espaces disponibles(2)
Afficher les taux de location en
- Espace
- Taille
- Terme
- Taux de location
- Utilisation de l’espace
- Aménagement
- Disponible
**PLEASE DO NOTE ENTER THE PROPERTY WITHOUT LISTING AGENT OR DISTURB TENANTS** - Fenced Property - 9,375 SF Building - Paved and ample parking lot - x2 Grade height doors - 3 phase power: 600amps
- Salle de bains privée
- 9,375 SF, new building. Completion Sept 2026
- 2 grade-level overhead doors
- Freestanding large industrial building in Cypress,
- Secured fenced lot with ample parking
- Functional layout for truck access
**PLEASE DO NOTE ENTER THE PROPERTY WITHOUT LISTING AGENT OR DISTURB TENANTS** - Fenced Property - 9,375 SF Building - Paved and ample parking lot - x2 Grade height doors - 3 phase power: 600amps
- Freestanding large industrial building in Cypress
- Secured fenced lot with ample parking
- Functional layout for truck access
- 9,375 SF, new building. Completion Sept 2026
- 2 Grade-Level overhead doors
| Espace | Taille | Terme | Taux de location | Utilisation de l’espace | Aménagement | Disponible |
| 1er étage - Building 2 | 9 375 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | - | 2026-09-01 |
| 1er étage - Building 3 | 9 375 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | - | 2026-09-01 |
1er étage - Building 2
| Taille |
| 9 375 pi² |
| Terme |
| Négociable |
| Taux de location |
| Sur demande Sur demande Sur demande Sur demande |
| Utilisation de l’espace |
| Industriel |
| Aménagement |
| - |
| Disponible |
| 2026-09-01 |
1er étage - Building 3
| Taille |
| 9 375 pi² |
| Terme |
| Négociable |
| Taux de location |
| Sur demande Sur demande Sur demande Sur demande |
| Utilisation de l’espace |
| Industriel |
| Aménagement |
| - |
| Disponible |
| 2026-09-01 |
1er étage - Building 2
| Taille | 9 375 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| Aménagement | - |
| Disponible | 2026-09-01 |
**PLEASE DO NOTE ENTER THE PROPERTY WITHOUT LISTING AGENT OR DISTURB TENANTS** - Fenced Property - 9,375 SF Building - Paved and ample parking lot - x2 Grade height doors - 3 phase power: 600amps
- Salle de bains privée
- Freestanding large industrial building in Cypress,
- 9,375 SF, new building. Completion Sept 2026
- Secured fenced lot with ample parking
- 2 grade-level overhead doors
- Functional layout for truck access
1er étage - Building 3
| Taille | 9 375 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| Aménagement | - |
| Disponible | 2026-09-01 |
**PLEASE DO NOTE ENTER THE PROPERTY WITHOUT LISTING AGENT OR DISTURB TENANTS** - Fenced Property - 9,375 SF Building - Paved and ample parking lot - x2 Grade height doors - 3 phase power: 600amps
- Freestanding large industrial building in Cypress
- 9,375 SF, new building. Completion Sept 2026
- Secured fenced lot with ample parking
- 2 Grade-Level overhead doors
- Functional layout for truck access
Aperçu de la propriété
**PLEASE DO NOTE ENTER THE PROPERTY WITHOUT LISTING AGENT OR DISTURB TENANTS** - 3 Building Industrial Park in Cypress - Hwy 290/Barker Cypress corridor - Building 1 is currently leased out (11,195 SF) - Buildings 2/3 are in construction, expected to be completed by September 2026 - Fully fenced lot with ample parking. Functional truck access - Buildings 2/3 have 3-Phase power: 600A - Building 1: single phase power with 3 phase capabilities
Faits sur l’installation Industriel
Sélectionner des locataires
- Étage
- Nom du locataire
- 1ᵉʳ
- Masram Mechanical Company
Présenté par
12307 Woodworth Dr
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.








