Se Connecter/S’inscrire
Votre courriel a été envoyé.
Jam Data Center 12626A Dairy Ashford 15 995 pi² Industriel Immeuble Sugar Land, TX 77478 47 640 952 $ CAD (2 978,49 $ CAD/pi²)



Certaines informations ont été traduites automatiquement.
Faits saillants de l'investissement
- Immediate Power Availability – Approximately 14 MW of firm, delivered electrical capacity available today, eliminating multi-year utility interconnect
- Speed-to-Market Advantage – Enables buyers to deploy compute capacity months or years faster than greenfield alternatives, capturing revenue and strat
- Scarcity Value – Assets with live, transferable power at this scale are increasingly rare as utilities impose moratoriums and long lead times on new i
Résumé de l'annonce
Rare opportunity to acquire a fully renovated power-forward compute and data infrastructure site with immediate, low-cost electrical capacity in a constrained Houston-area power market. New Rood, New Remodel!
This opportunity is best suited for buyers prioritizing power certainty and rapid deployment over traditional data center build timelines.
The property is not a traditional turnkey data center and is intentionally positioned for modular, micro-data center, AI inference, edge compute, or power-intensive users seeking speed to deployment rather than hyperscale construction timelines.
Key Highlights
• ~14 MW of firm, delivered power available today
• Utility approvals supporting expansion up to ~22 MW
• Exceptionally low power cost (~$0.05/kWh) – materially below current market rates for the first 3 Megawatts and possible for the rest.
• Power delivered at 480/277V, 3-phase
• Industrial building (~16,000 SF) on ~1.8 acres / .8 acres available to build additional building
• Zoned for industrial / power-intensive use
• Immediate access to major Houston infrastructure and fiber routes
Use Case Positioning
Ideal for buyers deploying:
• Modular or containerized data centers
• AI inference or GPU compute pods
• Edge compute / private cloud infrastructure
• Energy-intensive or power-constrained operations
Cooling and final configuration are buyer-designed, allowing flexibility for liquid cooling, rear-door heat exchangers, or modular mechanical solutions.
Investment Thesis
The value of this site is driven by immediate power availability, certainty of interconnection, and speed to market in an environment where new utility capacity often requires 24–36 months. The asset offers buyers the ability to deploy 1–2 MW blocks quickly and scale over time.
Marketing Notes
• Offered as-is
• Not marketed as a Tier III / raised-floor data center
• Tours and detailed power information provided upon NDA
This opportunity is best suited for buyers prioritizing power certainty and rapid deployment over traditional data center build timelines.
The property is not a traditional turnkey data center and is intentionally positioned for modular, micro-data center, AI inference, edge compute, or power-intensive users seeking speed to deployment rather than hyperscale construction timelines.
Key Highlights
• ~14 MW of firm, delivered power available today
• Utility approvals supporting expansion up to ~22 MW
• Exceptionally low power cost (~$0.05/kWh) – materially below current market rates for the first 3 Megawatts and possible for the rest.
• Power delivered at 480/277V, 3-phase
• Industrial building (~16,000 SF) on ~1.8 acres / .8 acres available to build additional building
• Zoned for industrial / power-intensive use
• Immediate access to major Houston infrastructure and fiber routes
Use Case Positioning
Ideal for buyers deploying:
• Modular or containerized data centers
• AI inference or GPU compute pods
• Edge compute / private cloud infrastructure
• Energy-intensive or power-constrained operations
Cooling and final configuration are buyer-designed, allowing flexibility for liquid cooling, rear-door heat exchangers, or modular mechanical solutions.
Investment Thesis
The value of this site is driven by immediate power availability, certainty of interconnection, and speed to market in an environment where new utility capacity often requires 24–36 months. The asset offers buyers the ability to deploy 1–2 MW blocks quickly and scale over time.
Marketing Notes
• Offered as-is
• Not marketed as a Tier III / raised-floor data center
• Tours and detailed power information provided upon NDA
Salle de données Cliquez ici pour accéder à
- Market Information
Faits sur la propriété
Commodités
- Accès 24 heures
- Accès contrôlé
- Installations de conférences
- Chargement frontal
- Système de sécurité
- Affichage
- Accessible aux fauteuils roulants
- Réception
- Espace d'entreposage
- Station de recharge de voiture
- Affichage sur monument
- Climatisation
- Internet par fibre optique
- Backup Power / Generators
- Perimeter Security Fence
- On-Site Power Generation
- Raised Floor System
Services publics
- Éclairage
- Eau
- Chauffage
Impôts fonciers
| Numéros de lot | Évaluation des bâtiments | 1 958 880 $ CAD (2025) | |
| Évaluation du terrain | 809 127 $ CAD (2025) | Évaluation totale | 2 768 007 $ CAD (2025) |
Impôts fonciers
Numéros de lot
Évaluation du terrain
809 127 $ CAD (2025)
Évaluation des bâtiments
1 958 880 $ CAD (2025)
Évaluation totale
2 768 007 $ CAD (2025)
1 de 59
Vidéos
Visite extérieure 3D Matterport
Visite 3D Matterport
Photos
Vue depuis la rue
Rue
Carte
Présenté par
Scale Capital Partners
Jam Data Center | 12626A Dairy Ashford
Vous êtes déjà membre? Connectez-vous
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.
Votre message a été envoyé !
Activez votre compte LoopNet dès maintenant pour suivre les propriétés, recevoir des alertes en temps réel, gagner du temps sur vos demandes futures et bien plus encore.

