Votre courriel a été envoyé.
13001 Challenger Pky - GREI Challenger Pkwy Land UCF Research Park Lot • Terrain industriel • 31,97 Acres • Orlando, FL 32826



Certaines informations ont été traduites automatiquement.
Faits saillants de l'investissement
- Direct access to UCF (University of Central Florida) main campus
- 1,000+Ac office park with 150 companies and over 60 buildings
- 26,100 AADT traffic counts between Woodbury Road and Challenger Parkway
- 15 minutes to I-4, Downtown Orlando and Orlando executive park.
- Signalized corner of Woodbury road and Challenger Parkway
- Simulation centers, UCF, major business Headquarters
Résumé de l'annonce
Zoning: IND-2/IND-3/INDUSTRIAL
-Recent Wetland Mitigation completed showing 3.79Ac of uplands before required buffer.
-Highest and best may include requesting reduction of required buffer distance and/or wetland mitigation.
-Sellers are looking for highest offer with shortest due diligence.
- 0.7ac after buffer (if buffer is not reduced)
-An Environmental Resource Permit (ERP) will be required through the St. Johns River Water
Management District (SJRWMD) to authorize construction and operation of a stormwater
management system for the site in association with a proposed project.
-U.S. Army Corps of Engineers (USACE) will need to be consulted for development:
The on-site wetlands appear to be USACE jurisdictional due to the
hydrologic connection to the Econlockhatchee River.
-Orange County Environmental Protection Division:
A Wetland Determination (WD) will be required from the Orange County Environmental
Protection Division (OCEPD) to determine the extent of any wetlands and surface waters that exist
within the subject site, or the absence of wetlands and surface waters within the subject site. During
this process, a signed and sealed boundary survey describing the metes and bounds of all the on
site wetlands and surface waters tied to the boundary will be required. This permit will be valid
for five (5) years, unless extended under a permit modification.
-Natural Resource Impact Permit (NRIP)
All wetland and/or surface water impacts will require either a Noticed General Permit (NGP) or
Standard Permit (SP) from OCEPD. Due to the various impact thresholds for meeting either a NGP
or SP permit, the type of NRIP cannot be determined until a site plan has been created. All wetlands
and/or surface waters now require a 100-ft upland buffer; including ditches and man-made ponds.
Additionally, a permit will be required for development within the 100-foot upland buffer
surrounding any wetland or surface water, even if no wetland impacts are proposed.
Faits sur la propriété
1 Lot disponible
Lot
| Taille du lot | 31,97 AC |
| Taille du lot | 31,97 AC |
Gagnon Real Estate Investments LLC is proud to exclusively represent this former Luminar Technologies INC property within the UCF Research park. Zoning: IND-2/IND-3/INDUSTRIAL Not a formal REO listing but this property is being sold by the receivers.
Description
32+ Acres of IND Land with recent wetland delineation showing 3.79AC of uplands before required buffer. Highest and best may be to try to reduce buffer distance and / or wetland mitigation. Owners looking for Highest offer with shortest due diligence requirements. contact Gary Gagnon at Gary@GagnonRealEstate.com More information to follow. Zoning: IND-2/IND-3/INDUSTRIAL Last sale was $1,000,000.00 12/16/22
Impôts fonciers
| Numéro de lot | 15-2231-1218-32-010 | Évaluation des bâtiments | 0 $ CAD |
| Évaluation du terrain | 1 211 332 $ CAD | Évaluation totale | 1 211 332 $ CAD |
Impôts fonciers
Présenté par
13001 Challenger Pky - GREI Challenger Pkwy Land UCF Research Park
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.
