Se Connecter/S’inscrire
Votre courriel a été envoyé.
1600 Centre Park dr
Loudon, TN 37774
111.36 Acres | Centre 75 Business Park | Loud · Terrain À vendre
·
111,36 AC


Certaines informations ont été traduites automatiquement.
Faits saillants de l'investissement
- M-2 Heavy Industrial zoning supporting industrial and logistics uses.
- Development-ready with utilities including 3-phase power, water, sewer, and natural gas.
- Direct access to I-75 with proximity to I-40 interchange for regional distribution.
- Located in a premier East Tennessee master-planned business park.
Résumé de l'annonce
Selling Price : $2,700,000
Exceptional industrial development opportunity consisting of 111.36± acres across two parcels (22.20± acres and 89.16± acres) within Centre 75 Business Park, East Tennessee's premier master-planned business park. Ideally located at Interstate 75, Exit 72 in Loudon, Tennessee, the property offers outstanding interstate access and visibility for manufacturing, logistics, distribution, and industrial users.
Encompassing 284 acres, Centre 75 Business Park has been thoughtfully designed to accommodate modern industrial development with high-quality infrastructure and attractive amenities. The park features underground utilities, and a landscaped and lighted boulevard entrance.
The site is zoned M-2 Heavy Industrial and is served by the Loudon Utilities Board with robust utility infrastructure, including:
3-phase electric service (approximately 4 MW capacity)
12-inch water main
12-inch sewer main
4-inch natural gas main
With its strategic location along the I-75 corridor, exceptional infrastructure, and development-ready setting, this offering presents a rare opportunity for industrial users, developers, and investors seeking one of East Tennessee's most desirable business park locations.
Exceptional industrial development opportunity consisting of 111.36± acres across two parcels (22.20± acres and 89.16± acres) within Centre 75 Business Park, East Tennessee's premier master-planned business park. Ideally located at Interstate 75, Exit 72 in Loudon, Tennessee, the property offers outstanding interstate access and visibility for manufacturing, logistics, distribution, and industrial users.
Encompassing 284 acres, Centre 75 Business Park has been thoughtfully designed to accommodate modern industrial development with high-quality infrastructure and attractive amenities. The park features underground utilities, and a landscaped and lighted boulevard entrance.
The site is zoned M-2 Heavy Industrial and is served by the Loudon Utilities Board with robust utility infrastructure, including:
3-phase electric service (approximately 4 MW capacity)
12-inch water main
12-inch sewer main
4-inch natural gas main
With its strategic location along the I-75 corridor, exceptional infrastructure, and development-ready setting, this offering presents a rare opportunity for industrial users, developers, and investors seeking one of East Tennessee's most desirable business park locations.
Faits sur la propriété
| Type de vente | Investissement | Utilisation proposée | Commercial |
| Nombre de lots | 1 | Taille totale du lot | 111,36 AC |
| Type de propriété | Terrain | Zone de développement économique |
Oui
|
| Sous-type de propriété | Terrain commercial | ||
| Zonage | M-2 - The site is zoned M-2 Heavy Industrial and is served by the Loudon Utilities Board with robust utility infrastructure. | ||
| Type de vente | Investissement |
| Nombre de lots | 1 |
| Type de propriété | Terrain |
| Sous-type de propriété | Terrain commercial |
| Utilisation proposée | Commercial |
| Taille totale du lot | 111,36 AC |
| Zone de développement économique |
Oui |
| Zonage | M-2 - The site is zoned M-2 Heavy Industrial and is served by the Loudon Utilities Board with robust utility infrastructure. |
1 Lot disponible
Lot
| Prix | 3 798 900 $ CAD | Taille du lot | 111,36 AC |
| Prix par AC | 34 113,68 $ CAD |
| Prix | 3 798 900 $ CAD |
| Prix par AC | 34 113,68 $ CAD |
| Taille du lot | 111,36 AC |
Description
Its strategic location just 13 miles from the I-75/I-40 split enables direct haul routes throughout the Southeast. With its size, zoning, and existing infrastructure, the property caters to manufacturers, logistics companies, and distribution operators seeking long-term scalability in a thriving industrial corridor.
1 de 11
Vidéos
Visite extérieure 3D Matterport
Visite 3D Matterport
Photos
Vue depuis la rue
Rue
Carte
