Partager cette annonce

Message

926 caractères restants

Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.

Votre courriel a été envoyé.

Toujours intéressé ?

Contactez le courtier pour plus d'informations sur cette propriété

Certaines informations ont été traduites automatiquement.

Faits saillants de l'investissement

  • 31.89± acre industrial parcel
  • Utilities available to site
  • Strong regional access
  • Flexible development configuration
  • Near Muller Parkway growth corridor

Résumé de l'annonce

A Prime 31.89± acre industrial development parcel located within Buckeye Industrial Park near South Bently Parkway in Minden, Nevada. The parcel offers a large flexible development footprint suitable for industrial, flex space, or campus-style projects.
The property benefits from proximity to Muller Parkway, the new US-395 bypass corridor currently under development. As this major infrastructure project continues toward completion, commercial development and investment activity in the surrounding area are expected to increase.
Buckeye Industrial Park has already seen multiple parcel sales and growing interest from industrial users and regional businesses seeking locations within the Carson Valley.

Faits sur la propriété

Prix 9 505 829 $ CAD
Type de vente Investissement
Nombre de lots 1
Type de propriété Terrain
Sous-type de propriété Terrain industriel
Utilisation proposée
Industriel
  • Parc industriel
Taille totale du lot 31,89 AC
Zonage Industrial - Light Industrial (L-1) – Build Ready

1 Lot disponible

Lot

Prix 9 505 829 $ CAD
Prix par AC 298 081,83 $ CAD
Taille du lot 31,89 AC

31.89± acre industrial development parcel located off South Bently Parkway within Buckeye Industrial Park. Flexible development opportunity near Muller Parkway and the expanding Carson Valley growth corridor.

Description

This prime industrial parcel consists of approximately 31.89 acres within Buckeye Industrial Park and offers an excellent opportunity for large-scale industrial or flex development in Minden, Nevada. The property is located near South Bently Parkway with convenient access to Muller Parkway, the new US-395 bypass currently being constructed to improve regional transportation throughout the Carson Valley. The parcel provides a large contiguous site suitable for a wide range of uses including warehouse operations, contractor service yards, light manufacturing, or flex industrial development. Utilities including sewer and water are available to the site, and the property has been rough graded to support future development. Buckeye Industrial Park is strategically positioned within one of the valley’s emerging commercial areas, with growing development activity and proximity to planned residential growth that will bring additional population and workforce to the area. This parcel offers a strong opportunity for businesses or developers seeking a large industrial parcel in a growing Northern Nevada market.

Impôts fonciers

Impôts fonciers

Numéro de lot
1320-27-002-004
Évaluation du terrain
1 651 457 $ CAD
Évaluation des bâtiments
0 $ CAD
Évaluation totale
1 651 457 $ CAD
  • ID d’inscription: 39724432

  • Date de mise sur le marché: 2026-03-10

  • Dernière mise à jour:

  • Adresse: 1620 Bently Pky S, Minden, NV 89423

Lien copié
Votre compte LoopNet a été créé !

Veuillez partager vos commentaires

Nous vous invitons à nous faire part de vos commentaires sur la façon dont nous pouvons améliorer LoopNet afin de mieux répondre à vos besoins.
X
{{ getErrorText(feedbackForm.starRating, "Ce notation") }}
255 Limite de caractères ({{ remainingChars() }} caractèrecaractères restantsur)
{{ getErrorText(feedbackForm.msg, "Ce notation") }}
{{ getErrorText(feedbackForm.fname, "Ce prénom") }}
{{ getErrorText(feedbackForm.lname, "Ce nom") }}
{{ getErrorText(feedbackForm.phone, "Ce numéro de téléphone") }}
{{ getErrorText(feedbackForm.phonex, "Cette extension de téléphone") }}
{{ getErrorText(feedbackForm.email, "Cet email") }}