Partager cette annonce

Message

897 caractères restants

Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.

Votre courriel a été envoyé.

Toujours intéressé ?

Contactez le courtier pour plus d'informations sur cette propriété

1725 12th Road Southeast - 78.9 AC Available for Data Center Development Lot • Terrain commercial • 78,9 Acres • Burlington, KS 66839

Certaines informations ont été traduites automatiquement.

Enregistrez cette annonce !

Ajoutez cette annonce à vos favoris et recevez des notifications de changement de prix, de nouveaux médias, etc.

FAITS SAILLANTS DE L'INVESTISSEMENT

  • Proximity to Wolf Creek Nuclear Power Plant
  • No Floodplain - Cooling Water Source: Wolf Creek Reservoir/Coffey County Lake
  • Direct Access to 69 KV transmission lines that run directly to Wolf Creek Plant Substation

RÉSUMÉ DE L'ANNONCE

Prime Land Listing for Data Center and Battery Storage Development
Location: Near Wolf Creek Nuclear Power Plant, Burlington, Kansas
Seize the opportunity to develop this 78-acre parcel, strategically located near the Wolf Creek Nuclear Plant. Wolf Creek generates approx. 1,250 MW of electricity – enough to power more than 800,000 homes. Jointly owned by Evergy and Kansas Electric Power Cooperative. Today Wolf Creek generates more than 20% of Kansas’ total power and serves several major cities including Kansas City, Topeka and Wichita. The plant is cleared to operate through 2045, helping to meet future power demands in Kansas and Missouri. This site has access to 69 KV transmission lines and has no floodplain. A 69 KV substation sits at the edge of the site and is linked through the transmission lines to the Wolf Creek Substation with a 345 KV – 69 KV range. Easy access to US-75, approx. 4 miles west plus proximity to the Missouri Pacific railroad to the east.
Key Features:
- Reliable Energy Source: provided through Wolf Creek Nuclear Plant, which maintains a pressurized water reactor certified for operation through 2045. Westinghouse Four-Loop Model. Servicing Kansas and Missouri with reliable energy since 1985. Wolf Creek is the only Nuclear Plant in Kansas. A 69 KV max + min volt substation sits along the north side of the property. The same transmission lines run to the Wolf Creek substation with 345 KV max and 69 min volt range.
- Cooling Water Source: The Coffey County Lake/Wolf Creek Reservoir was built alongside the plant in 1985. The lake boasts over 5,000 acres of surface water.
- Secure Development Environment: The site has zero floodplain, offering a safe and stable foundation for your investment.
- Transmission Lines: 69 KV transmission lines run along the northern perimeter of the site with a 345 KV line nearby.
Investment Opportunity:
This prime location offers reliable energy access and a strategic advantage in the burgeoning sectors of data storage and battery technology. This site is an exceptional opportunity for investors and developers in the booming data center market. Premier Hyper-Scale Data Center Development Site. For pricing and more information, please contact Broker. Office: (405) 778 - 3355, Direct: (580) 583 - 3517. In Association with Scott Reid and ParaSell, Inc. | Broker of Record, KS – CO00002998 | 940 South Coast Drive, Suite 100, Costa Mesa, CA 92626 | (949) 942- 6585 | broker@parasellinc.com

FAITS SUR LA PROPRIÉTÉ

Type de vente Investissement
Nombre de lots 1
Type de propriété Terrain
Sous-type de propriété Terrain commercial
Utilisation proposée
Centre commercial géant
  • Sous-station utilitaire
Taille totale du lot 78,90 AC

1 LOT DISPONIBLE

Lot 1

Taille du lot 78,90 AC

78-acre parcel, strategically located near the Wolf Creek Nuclear Plant. Wolf Creek generates approx. 1,250 MW. Site has access to 69 KV transmission lines. No floodplain. A 69 KV substation sits at the edge of the site. Easy access to US 75.

DESCRIPTION

Prime Land Listing for Data Center and Battery Storage Development Location: Near Wolf Creek Nuclear Power Plant, Burlington, Kansas Seize the opportunity to develop this 78-acre parcel, strategically located near the Wolf Creek Nuclear Plant. Wolf Creek generates approx. 1,250 MW of electricity – enough to power more than 800,000 homes. Jointly owned by Evergy and Kansas Electric Power Cooperative. Today Wolf Creek generates more than 20% of Kansas’ total power and serves several major cities including Kansas City, Topeka and Wichita. The plant is cleared to operate through 2045, helping to meet future power demands in Kansas and Missouri. This site has access to 69 KV transmission lines and has no floodplain. A 69 KV substation sits at the edge of the site and is linked through the transmission lines to the Wolf Creek Substation with a 345 KV – 69 KV range. Easy access to US 75, approx. 4 miles west and proximity to the Missouri Pacific railroad to the east. Key Features: - Reliable Energy Source: provided through Wolf Creek Nuclear Plant, which maintains a pressurized water reactor certified for operation through 2045. Westinghouse Four-Loop Model. Servicing Kansas and Missouri with reliable energy since 1985. Wolf Creek is the only Nuclear Plant in Kansas. A 69 KV max + min volt substation sits along the north side of the property. The same transmission lines run to the Wolf Creek substation with 345 KV max and 69 min volt range. - Cooling Water Source: The Coffey County Lake/Wolf Creek Reservoir was built alongside the plant in 1985. The lake boasts over 5,000 acres of surface water. - Secure Development Environment: The site has zero floodplain, offering a safe and stable foundation for your investment. - Transmission Lines: 69 KV transmission lines run along the northern perimeter of the site with a 345 KV line nearby. Wolf Creek Nuclear Plant Info: Location: Burlington, KS (3.5 miles NE of Burlington, KS) in Region IV Operator: Wolf Creek Nuclear Operating Corp. Operating License: Issued - 06/04/1985 Renewed License: Issued - 11/20/2008 License Expires - 03/11/2045 Docket Number: 05000482 Reactor Type: Pressurized Water Reactor Licensed MWt: 3,565 Reactor Vendor/Type: Westinghouse Four-Loop Containment Type: Dry, Ambient Pressure Cooling source: Wolf creek reservoir. Investment Opportunity: This prime location offers reliable energy access and a strategic advantage in the burgeoning sectors of data storage and battery technology. This site is an exceptional opportunity for investors and developers in the booming data center market. Premier Hyper-Scale Data Center Development Site. For pricing and more information, please contact Broker. Office: (405) 778 - 3355, Direct: (580) 583 - 3517. In Association with Scott Reid and ParaSell, Inc. | Broker of Record, KS – CO00002998 | 940 South Coast Drive, Suite 100, Costa Mesa, CA 92626 | (949) 942- 6585 | broker@parasellinc.com

Impôts fonciers

Impôts fonciers

Numéro de lot
128-28-0-00-00-003.00-0
Évaluation du terrain
8 398 $ CAD
Évaluation des bâtiments
491 $ CAD
Évaluation totale
8 888 $ CAD
  • ID d’inscription: 39012472

  • Date de mise sur le marché: 2026-01-08

  • Dernière mise à jour:

  • Adresse: 1725 12th Road Southeast, Burlington, KS 66839

Lien copié
Votre compte LoopNet a été créé !

Veuillez partager vos commentaires

Nous vous invitons à nous faire part de vos commentaires sur la façon dont nous pouvons améliorer LoopNet afin de mieux répondre à vos besoins.
X
{{ getErrorText(feedbackForm.starRating, "Ce notation") }}
255 Limite de caractères ({{ remainingChars() }} caractèrecaractères restantsur)
{{ getErrorText(feedbackForm.msg, "Ce notation") }}
{{ getErrorText(feedbackForm.fname, "Ce prénom") }}
{{ getErrorText(feedbackForm.lname, "Ce nom") }}
{{ getErrorText(feedbackForm.phone, "Ce numéro de téléphone") }}
{{ getErrorText(feedbackForm.phonex, "Cette extension de téléphone") }}
{{ getErrorText(feedbackForm.email, "Cet email") }}