Votre courriel a été envoyé.
Mill St Industrial Park Madras, OR 97741 3 000–12 000 pi² d'espace disponible • Industriel



Certaines informations ont été traduites automatiquement.
Faits sur le parc
| Superficie totale disponible | 12 000 pi² | Type de parc | Parc industriel |
| Superficie totale disponible | 12 000 pi² |
| Type de parc | Parc industriel |
Tous les espaces disponibles(3)
Afficher les taux de location en
- Espace
- Taille
- Terme
- Taux de location
- Utilisation de l’espace
- Aménagement
- Disponible
Building description: Centrally located in the heart of the Madras Industrial Park near Bright Wood Corporation, Central Oregon Seed, Erickson Aero Tanker Base, Daimler Trucks North America and Madras Airport. Easy access from US Hwy 26, 3 blocks away. This NEW building is priced below its competition with introductory pricing. Building highlights: New construction in the Madras Industrial Park. Units range from 3,000 sq. ft. to 6,000 sq. ft. Cascade Natural Gas and Pacific Power to each unit, base space has 200-amp service, additional capacity available. Each unit has ADA restroom and small office.
- Comprend 120 pi² d’espace de bureau dédié
- Espace en excellent état
Building description: Centrally located in the heart of the Madras Industrial Park near Bright Wood Corporation, Central Oregon Seed, Erickson Aero Tanker Base, Daimler Trucks North America and Madras Airport. Easy access from US Hwy 26, 3 blocks away. This NEW building is priced below its competition with introductory pricing. Building highlights: New construction in the Madras Industrial Park. Units range from 3,000 sq. ft. to 6,000 sq. ft. Cascade Natural Gas and Pacific Power to each unit, base space has 200-amp service, additional capacity available. Each unit has ADA restroom and small office.
- Comprend 120 pi² d’espace de bureau dédié
- Espace en excellent état
| Espace | Taille | Terme | Taux de location | Utilisation de l’espace | Aménagement | Disponible |
| 1er étage - #1 | 3 000 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | construction complète | Maintenant |
| 1er étage - #2 | 3 000 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | construction complète | Maintenant |
1843 NW Mill St - 1er étage - #1
1843 NW Mill St - 1er étage - #2
- Espace
- Taille
- Terme
- Taux de location
- Utilisation de l’espace
- Aménagement
- Disponible
Building description: Centrally located in the heart of the Madras Industrial Park near Bright Wood Corporation, Central Oregon Seed, Erickson Aero Tanker Base, Daimler Trucks North America and Madras Airport. Easy access from US Hwy 26, 3 blocks away. This NEW building is priced below its competition with introductory pricing. Building highlights: New construction in the Madras Industrial Park. Units range from 3,000 sq. ft. to 6,000 sq. ft. Cascade Natural Gas and Pacific Power to each unit, base space has 200-amp service, additional capacity available. Each unit has ADA restroom and small office.
- Comprend 120 pi² d’espace de bureau dédié
- Espace en excellent état
| Espace | Taille | Terme | Taux de location | Utilisation de l’espace | Aménagement | Disponible |
| 1er étage - #3 | 6 000 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | construction complète | Maintenant |
1843 NW Mill St - 1er étage - #3
1843 NW Mill St - 1er étage - #1
| Taille | 3 000 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| Aménagement | construction complète |
| Disponible | Maintenant |
Building description: Centrally located in the heart of the Madras Industrial Park near Bright Wood Corporation, Central Oregon Seed, Erickson Aero Tanker Base, Daimler Trucks North America and Madras Airport. Easy access from US Hwy 26, 3 blocks away. This NEW building is priced below its competition with introductory pricing. Building highlights: New construction in the Madras Industrial Park. Units range from 3,000 sq. ft. to 6,000 sq. ft. Cascade Natural Gas and Pacific Power to each unit, base space has 200-amp service, additional capacity available. Each unit has ADA restroom and small office.
- Comprend 120 pi² d’espace de bureau dédié
- Espace en excellent état
1843 NW Mill St - 1er étage - #2
| Taille | 3 000 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| Aménagement | construction complète |
| Disponible | Maintenant |
Building description: Centrally located in the heart of the Madras Industrial Park near Bright Wood Corporation, Central Oregon Seed, Erickson Aero Tanker Base, Daimler Trucks North America and Madras Airport. Easy access from US Hwy 26, 3 blocks away. This NEW building is priced below its competition with introductory pricing. Building highlights: New construction in the Madras Industrial Park. Units range from 3,000 sq. ft. to 6,000 sq. ft. Cascade Natural Gas and Pacific Power to each unit, base space has 200-amp service, additional capacity available. Each unit has ADA restroom and small office.
- Comprend 120 pi² d’espace de bureau dédié
- Espace en excellent état
1843 NW Mill St - 1er étage - #3
| Taille | 6 000 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| Aménagement | construction complète |
| Disponible | Maintenant |
Building description: Centrally located in the heart of the Madras Industrial Park near Bright Wood Corporation, Central Oregon Seed, Erickson Aero Tanker Base, Daimler Trucks North America and Madras Airport. Easy access from US Hwy 26, 3 blocks away. This NEW building is priced below its competition with introductory pricing. Building highlights: New construction in the Madras Industrial Park. Units range from 3,000 sq. ft. to 6,000 sq. ft. Cascade Natural Gas and Pacific Power to each unit, base space has 200-amp service, additional capacity available. Each unit has ADA restroom and small office.
- Comprend 120 pi² d’espace de bureau dédié
- Espace en excellent état
Aperçu du parc
Centrally located in the heart of the Madras Industrial Park near Bright Wood Corporation, Central Oregon Seed, Erickson Aero Tanker Base, Daimler Trucks North America and Madras Airport. Easy access from US Hwy 26, 3 blocks away. This NEW building is priced below its competition with introductory pricing. New construction in the Madras Industrial Park. Units range from 3,000 sq. ft. to 6,000 sq. ft. Cascade Natural Gas and Pacific Power to each unit, base space has 200-amp service, additional capacity available. Each unit has ADA restroom and small office.
Présenté par
B&B Investments LLC
Mill St Industrial Park | Madras, OR 97741
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.
