Votre courriel a été envoyé.
Exit 8 Logistics Center Manalapan Township, NJ 07726 294 500–596 750 pi² d'espace disponible • Industriel



Certaines informations ont été traduites automatiquement.
Faits saillants du parc
- Exit 8 Logistics Center, a two-building warehouse site, is set to offer Building A at 294,500 square feet and Building B at 302,250 square feet.
- Large-scale, heavy industrial user opportunities to acquire Class A warehouse space with an approaching delivery date and loading capabilities.
- US 9 is Manalapan’s commercial hub; Manalapan EpiCentre Mall hosts a Wegmans and Target, and the Freehold Raceway Mall is 3 miles down Route 9.
- Easy access to Interstate 95 and Route 33 (NJ Parkway), 45.2 miles from Newark Liberty International Airport and 46.8 miles from New York City.
- Industry synergy in the industrial corridor with neighbors such as Panatec Corporation, CRS Machine Rebuilders, and Shore Manufacturing.
- 94% of the 10-mile population (318,075) has a high school education or higher – a highly skilled workforce.
Faits sur le parc
| Superficie totale disponible | 596 750 pi² | Type de parc | Parc industriel |
| Superficie totale disponible | 596 750 pi² |
| Type de parc | Parc industriel |
Tous les espaces disponibles(2)
Afficher les taux de location en
- Espace
- Taille
- Terme
- Taux de location
- Utilisation de l’espace
- État
- Disponible
- Comprend 15 000 pi² d’espace de bureau dédié
- Espace en excellent état
- 53' by 54' column spacing
- 20 trailer parking spaces
- 48 docks doors
- 2 accès plain-pied
- 48 quais de chargement
- 40' clear height
- LED warehouse lighting
- Two drive in's
| Espace | Taille | Terme | Taux de location | Utilisation de l’espace | État | Disponible |
| 1er étage | 302 250 pi² | 5 ans | Sur demande Sur demande Sur demande Sur demande | Industriel | - | 2027-12-01 |
203B State Route 33 - 1er étage
- Espace
- Taille
- Terme
- Taux de location
- Utilisation de l’espace
- État
- Disponible
- Comprend 2 500 pi² d’espace de bureau dédié
- Espace en excellent état
- 53' by 54' column spacing
- 130' truck court depth
- LED warehouse lighting
- 2 accès plain-pied
- 57 quais de chargement
- 40' clear height
- ESFR sprinkler system
- TPO roofing system
| Espace | Taille | Terme | Taux de location | Utilisation de l’espace | État | Disponible |
| 1er étage | 294 500 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | selon spécifications | 2026-12-01 |
203A State Route 33 - 1er étage
203B State Route 33 - 1er étage
| Taille | 302 250 pi² |
| Terme | 5 ans |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| État | - |
| Disponible | 2027-12-01 |
- Comprend 15 000 pi² d’espace de bureau dédié
- 2 accès plain-pied
- Espace en excellent état
- 48 quais de chargement
- 53' by 54' column spacing
- 40' clear height
- 20 trailer parking spaces
- LED warehouse lighting
- 48 docks doors
- Two drive in's
203A State Route 33 - 1er étage
| Taille | 294 500 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| État | selon spécifications |
| Disponible | 2026-12-01 |
- Comprend 2 500 pi² d’espace de bureau dédié
- 2 accès plain-pied
- Espace en excellent état
- 57 quais de chargement
- 53' by 54' column spacing
- 40' clear height
- 130' truck court depth
- ESFR sprinkler system
- LED warehouse lighting
- TPO roofing system
Aperçu du parc
As the exclusive advisor, EQT Real Estate offers new-to-market Class A warehouse buildings conveniently located off Interstate 95 at the Exit 8 Logistics Center in Manalapan Township, New Jersey. The project is currently under construction, with Building A scheduled for a 2027 completion and Building B for a late 2026 completion. Building A has a planned footprint of 294,500 square feet with 57 dock-high doors, two drive-ins, 127 auto parking spaces, and 20 (banked) trailer parking spaces. Building B has a planned footprint of 302,250 square feet with 48 dock-high doors, two drive-ins, 183 auto parking spaces, and 20 (banked) trailer parking spaces. Both warehouses will feature a 40-foot clear height, LED warehouse lighting, and a TPO roofing system. Exit 8 Logistics Center is strategically located to support delivery logistics. It is 48 minutes from Newark Liberty International Airport, 46 miles from New York City, and 55 miles from Philadelphia. The nearest freight port, the New York Container Terminal, is reachable within an hour’s drive. Rail access is close by at the National Distribution Center railway station (13 miles). Manalapan Township features both heavy and light industrial users and is home to a notable hub, Manalapan Tech Park, which includes 84,000 square feet of warehouse and office space. A key employer of the township is Glorium Technologies, a bespoke software development firm. Situated in Monmouth County, Manalapan Township offers easy access to regional transportation, which has contributed to its industrial growth over the years.
Brochure du parc
Données démographiques
Accessibilité régionale
Commodités à proximité
Commerce de détail |
||
|---|---|---|
| Ace Hardware | Matériel | 13 Min. de marche |
Hôtels |
|
|---|---|
| Red Roof Inn |
47 Pièces
8 route min.
|
| Radisson by Choice |
121 Pièces
9 route min.
|
Agent de location
Chris McCrea, Investment Leasing Officer - Northeast
À propos du propriétaire
Autres propriétés dans le EQT REAL ESTATE portefeuille
Présenté par
Exit 8 Logistics Center | Manalapan Township, NJ 07726
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.



