Votre courriel a été envoyé.
Certaines informations ont été traduites automatiquement.
Faits saillants de l'investissement
- Two-site Bitcoin mining campus totaling 14 MW with 10-year low-cost power at $0.0372/kWh, providing immediate operational capability.
- Prime location offering an 8-MW live load, with an approved 4-MW expansion, and multiple high-performing Disruptor 2000 mining containers.
- 10-year power contracts through South Central Public Power District.
- Possible expansion of the runway to 25 MW at Blue Hill Substation positions the platform for scalable future growth for enhanced value.
Résumé de l'annonce
Rare opportunity to acquire a fully operational, revenue-generating Bitcoin mining platform consisting of two commissioned facilities in south-central Nebraska. The portfolio includes the Lawrence (Webster County) and Sutton (Clay County) campuses, representing approximately 14 MW of contracted power capacity with immediate operational control upon closing.
Unlike development-stage mining projects, both facilities are fully built, energized, and actively producing revenue, eliminating construction, permitting, interconnection, and commissioning risk.
POWER ADVANTAGE
The campuses operate under long-term power agreements with South Central Public Power District, providing a blended average electricity rate of approximately $0.0372/kWh. The current agreements provide power certainty through a 10-year contracted structure, positioning the operation among the most competitive power-cost environments in North America.
Both locations feature dedicated fiber connectivity with Starlink redundancy to maximize uptime and operational resilience.
LAWRENCE CAMPUS
Located on approximately 0.46 acres adjacent to its serving substation, the Lawrence facility currently supports 8 MW of active mining load with an additional 4 MW expansion already approved.
Infrastructure includes:
• Three RK Disruptor 2000 MK II mining containers
• One Digital Shovel Mini-Pod M300
• Fully fenced and secured perimeter
• Controlled gate access
• Dedicated fiber connectivity
• Immediate substation adjacency
SUTTON CAMPUS
Located on approximately 1.18 acres adjacent to its serving substation, the Sutton facility currently operates approximately 2 MW of active mining load.
Infrastructure includes:
• Digital Shovel Mini-Pod M300
• Fully fenced and secured perimeter
• Controlled gate access
• Dedicated fiber connectivity
• Immediate substation adjacency
MINING FLEET
The portfolio includes approximately 2,490 deployed miners consisting primarily of:
• Bitmain Antminer S19 K Pro
• Bitmain Antminer S19 J Pro
• Bitmain Antminer S19 Pro
• Bitmain Antminer L7
• ElphaPex DG1+
Documented infrastructure and equipment acquisition costs exceed $3.6 million.
OPERATING PERFORMANCE
Detailed operating statements, production history, power agreements, and supporting documentation are available through the data room upon execution of a confidentiality agreement.
EXPANSION POTENTIAL
The acquisition provides a clear pathway for future growth. A potential 25 MW expansion opportunity has been identified through the Blue Hill Substation, creating a scalable platform for operators seeking to increase capacity beyond the existing footprint.
TRANSACTION STRUCTURE
Ownership is open to multiple transaction structures, including:
• Turnkey operation with mining fleet included
• Infrastructure-only acquisition
• Customized transaction structures for qualified buyers
Data room access available following NDA execution. Letter of Intent required prior to advanced due diligence.
Faits sur la propriété
| Type de vente | Investissement | Sous-type de propriété | Terrain commercial |
| Condition de vente | Ventes de portefeuille | Utilisation proposée | Centre commercial géant |
| Nombre de lots | 1 | Taille totale du lot | 0,23 AC |
| Type de propriété | Terrain | ||
| Zonage | 05-AGRICUL - Both sites are zoned AG-G, General Agricultural District. Current use as energy/data infrastructure and permitted under existing approvals. | ||
| Type de vente | Investissement |
| Condition de vente | Ventes de portefeuille |
| Nombre de lots | 1 |
| Type de propriété | Terrain |
| Sous-type de propriété | Terrain commercial |
| Utilisation proposée | Centre commercial géant |
| Taille totale du lot | 0,23 AC |
| Zonage | 05-AGRICUL - Both sites are zoned AG-G, General Agricultural District. Current use as energy/data infrastructure and permitted under existing approvals. |
1 Lot disponible
Lot
| Taille du lot | 0,23 AC |
| Taille du lot | 0,23 AC |
Operational Bitcoin mining site. 8 MW live load, 4 MW expansion approved. 10-year power contract at $0.0372/kWh through South Central Public Power District. Adjacent to serving substation. Fenced, gated, revenue-producing.
Description
14 MW operational Bitcoin mining campus across two purpose-built sites in south-central Nebraska. Constructed between 2023 and 2024. Both sites are fully energized, revenue-producing, and configured for immediate buyer takeover. The Lawrence facility (Webster County) hosts 8 MW of active load across four mining containers on 0.46 acres, with an additional 4 MW expansion already approved. The Sutton facility (Clay County) hosts 2 MW via a Digital Shovel Mini-Pod M300 on 1.18 acres. Both sites are fully fenced, gate-controlled, and positioned directly adjacent to their serving substations — minimizing transmission losses and operational risk. Power is secured under 10-year agreements with South Central Public Power District at a blended average rate of $0.0372/kWh. Both sites run carrier-grade fiber with Starlink redundancy. Financials verified and available in data room under NDA. Future expansion to 25 MW identified at Blue Hill Substation (2029). Seller open to asset sale or infrastructure-only transaction.
Impôts fonciers
| Numéro de lot | 0006108.00 | Évaluation des bâtiments | 142 704 $ CAD |
| Évaluation du terrain | 272 029 $ CAD | Évaluation totale | 414 733 $ CAD |
Impôts fonciers
Conseiller(ère) en vente
Richard Lowrance, Seller Representative
Présenté par
2118 Road 2800
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.


