Se Connecter/S’inscrire
Votre courriel a été envoyé.
28.436994 -98.845523 - South Texas Energy Center Lot • Terrain industriel • 5 222 Acres • Fowlerton, TX 78021

Certaines informations ont été traduites automatiquement.
FAITS SAILLANTS DE L'INVESTISSEMENT
- 500 MW Online Within 18 Months | Scalable to 4 GW
RÉSUMÉ DE L'ANNONCE
500 MW Online Within 18 Months | Scalable to 4 GW
Strategically located in La Salle County, South Texas Energy Center spans +/-5,222 acres of development-ready land with integrated access to power, water, natural gas, and fiber. Zoned within an Opportunity Zone and EPA Attainment Area, the site is designed to support up to 4 gigawatts of hyperscale, AI/HPC, or industrial energy demand—delivered through a unique combination of behind-the-meter natural gas, nuclear SMR, and scalable solar + battery storage.
With abundant infrastructure and phased energy delivery, South Texas Energy Center offers unmatched resilience, grid independence, and speed to market. Whether you’re deploying next-generation data infrastructure or scaling energy-intensive AI applications, this is where cost-advantaged, high-capacity operations take root in the heart of deregulated ERCOT territory.
Permitting: Opportunity Zone, EPA Attainment Zone, EB-5 TEA HUA & Rural Area Qualified
Delivery: Shovel-ready for initial Phase 1 development. On-site infrastructure available for immediate deployment
Expansion Capacity -
Natural Gas Power Phase: 500 MW – 3 GW natural gas power plant within 48 months (behind the meter)
Nuclear SMR Phase: 250–500 MW nuclear SMR within 72 months
Optional Renewable Phase: 500 MW solar + battery energy storage within 18 months
Fully capable of supporting hyperscale or AI/high-density data center campus operations
Strategically located in La Salle County, South Texas Energy Center spans +/-5,222 acres of development-ready land with integrated access to power, water, natural gas, and fiber. Zoned within an Opportunity Zone and EPA Attainment Area, the site is designed to support up to 4 gigawatts of hyperscale, AI/HPC, or industrial energy demand—delivered through a unique combination of behind-the-meter natural gas, nuclear SMR, and scalable solar + battery storage.
With abundant infrastructure and phased energy delivery, South Texas Energy Center offers unmatched resilience, grid independence, and speed to market. Whether you’re deploying next-generation data infrastructure or scaling energy-intensive AI applications, this is where cost-advantaged, high-capacity operations take root in the heart of deregulated ERCOT territory.
Permitting: Opportunity Zone, EPA Attainment Zone, EB-5 TEA HUA & Rural Area Qualified
Delivery: Shovel-ready for initial Phase 1 development. On-site infrastructure available for immediate deployment
Expansion Capacity -
Natural Gas Power Phase: 500 MW – 3 GW natural gas power plant within 48 months (behind the meter)
Nuclear SMR Phase: 250–500 MW nuclear SMR within 72 months
Optional Renewable Phase: 500 MW solar + battery energy storage within 18 months
Fully capable of supporting hyperscale or AI/high-density data center campus operations
FAITS SUR LA PROPRIÉTÉ
1 LOT DISPONIBLE
Lot
| Taille du lot | 5 222,00 AC |
| Taille du lot | 5 222,00 AC |
Location: La Salle County, Texas – Central South Texas, strategically positioned between San Antonio, Laredo, and Corpus Christi Acreage: +\- 5,222 Acres (Divisible)
1 1
1 de 2
VIDÉOS
VISITE EXTÉRIEURE 3D MATTERPORT
VISITE 3D MATTERPORT
PHOTOS
VUE DEPUIS LA RUE
RUE
CARTE
1 de 1
Présenté par
28.436994 -98.845523 - South Texas Energy Center
Vous êtes déjà membre? Connectez-vous
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.
