Votre courriel a été envoyé.
32.38142491527811 -102.85648629400552 - Freeman Energy Field I & II Lot • Terrain industriel • 1 248 Acres • Andrews, TX 79714

Certaines informations ont été traduites automatiquement.
Faits saillants de l'investissement
- CURRENT CAPACITY - 450 megawatts (MW)
- ANTICIPATED EXPANSION CAPACITY - 3.0+ gigawatts (GW)
Résumé de l'annonce
• Permitted, shovel-ready development with Phase I environmental clearance
• ERCOT deregulated market with flexible energy contracting and arbitrage opportunities (Field 1)
• Fiber access via Windstream and Uniti Fiber
• Local and state incentives, including sales tax exemptions and property abatements
• Proximity to Midland/Odessa’s tech labor market, regional freight routes, and major airports
Faits sur la propriété
| Type de vente | Investissement | Sous-type de propriété | Terrain industriel |
| Nombre de lots | 1 | Utilisation proposée | Centre commercial géant |
| Type de propriété | Terrain | Taille totale du lot | 1 248,00 AC |
| Type de vente | Investissement |
| Nombre de lots | 1 |
| Type de propriété | Terrain |
| Sous-type de propriété | Terrain industriel |
| Utilisation proposée | Centre commercial géant |
| Taille totale du lot | 1 248,00 AC |
1 Lot disponible
Lot
| Taille du lot | 1 248,00 AC |
| Taille du lot | 1 248,00 AC |
+\- 8,700 Acres (Divisible) Premier Data Center Development Opportunity
Description
South Texas Energy Center II offers a rare opportunity to deliver up to 4 gigawatts of hyperscale or AI-driven data center capacity across ±8,700 acres in Webb County, Texas. Designed around exceptional access to energy and natural resources. Located in South Texas, the project is uniquely positioned with abundant water, on-site natural gas, and 138 kV transmission nearby. On-site Eagle Ford production and 10 different gas pipelines reduce transport costs and secure low-cost energy delivery. Development is phased to support rapid, scalable growth. Per 1,000 acres, behind-the-meter natural gas generation supports each data center end user with 500 MW in 18 months, scalable to 2+ GW within 24–36 months. A nuclear SMR-capable delivery within 60–72 months.
Présenté par
32.38142491527811 -102.85648629400552 - Freeman Energy Field I & II
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.
