MAJOR SYSTEM IMPROVEMENTS
Ownership has invested approximately $2M to date in deferred maintenance and critical system upgrades.
Approximately $2,000,000 of capital improvements have been invested into the facility and major systems in the last two years under the current Ownership's tenure. Such improvements include upgrades and replacements of numerous components of the core refrigeration and ammonia systems - including three phases of redundancy for the operations of the building, installation of brand new roof-mounted ammonia piping infrastructure, fire protection systems upgraded to current operational standards, new LED lighting throughout entire facility, parking lot improvements, additional bathrooms installed, and total repainting of the facade of the property.
These investments address many of the mechanical, refrigeration, and life-safety items typically associated with legacy cold storage facilities and significantly reduces near-term capital expenditure requirements for future ownership.
FIRE PROTECTION SYSTEM IMPROVEMENTS — 2023
Replacement of two dry pipe valve assemblies.
Installation of new PS40 low-air and PS10 waterflow pressure switches for each system
Replacement of failed ¾" check valve on System 4. Installed lock on PIV 6 for enhanced safety and compliance
Modernizes life-safety infrastructure and supports long-term operational reliability
Isolation of underground fire main; removal of existing dry pipe valves and installation of new differential dry pipe valves tied to existing airline
Added 2" main drain line for both systems, piped through exterior wall
LED LIGHTING UPGRADE - 2024
Comprehensive LED lighting replacement throughout designated interior and exterior areas
Enhances energy efficiency, reduces maintenance costs, and improves overall illumination quality
EXTERIOR BUILDING PAINTING - 2024
Full exterior repainting completed in 2024
RESTROOM RENOVATIONS - 2024
Upgrades include new masonry, plumbing, electrical, and doors
PARKING LOT IMPROVEMENTS - 2025 (AND SCHEDULED IN 2026)
3” asphalt patching across targeted areas of the lot
NEW ROOFING SYSTEM INSTALLED IN PHASES 2019-2022
A new roofing system was installed in 2022, providing long-term protection and extending the useful life of the building envelope.
REFRIGERATION COIL REPLACEMENTS
AMMONIA PIPING & MECHANICAL SYSTEMS UPGRADES
A substantial modernization of the facility’s ammonia refrigeration infrastructure has been completed. These
improvements materially reduce maintenance exposure, enhance safety, and extend the operational lifespan of
critical refrigeration systems.
Installation and testing of new roof-mounted ammonia mains
Relocation of ammonia piping to the roof
Replacement and insulation of valve groups serving multiple rooms
Hot gas system enhancements
Full system commissioning, and removal of legacy piping
Additional upgrades included replacement of ammonia control systems, NH3 alarm panels, and purging equipment.
REFRIGERATION COIL REPLACEMENTS
New evaporator coils were installed in key tenant spaces, including replacement of coils serving Room 4 and the citrimex space. Work included electrical finish, system startup, and removal of obsolete equipment. These upgrades improve system performance, reduce maintenance requirements, and support tenant operations.
Ownership has invested approximately $2M to date in deferred maintenance and critical system upgrades.
Approximately $2,000,000 of capital improvements have been invested into the facility and major systems in the last two years under the current Ownership's tenure. Such improvements include upgrades and replacements of numerous components of the core refrigeration and ammonia systems - including three phases of redundancy for the operations of the building, installation of brand new roof-mounted ammonia piping infrastructure, fire protection systems upgraded to current operational standards, new LED lighting throughout entire facility, parking lot improvements, additional bathrooms installed, and total repainting of the facade of the property.
These investments address many of the mechanical, refrigeration, and life-safety items typically associated with legacy cold storage facilities and significantly reduces near-term capital expenditure requirements for future ownership.
FIRE PROTECTION SYSTEM IMPROVEMENTS — 2023
Replacement of two dry pipe valve assemblies.
Installation of new PS40 low-air and PS10 waterflow pressure switches for each system
Replacement of failed ¾" check valve on System 4. Installed lock on PIV 6 for enhanced safety and compliance
Modernizes life-safety infrastructure and supports long-term operational reliability
Isolation of underground fire main; removal of existing dry pipe valves and installation of new differential dry pipe valves tied to existing airline
Added 2" main drain line for both systems, piped through exterior wall
LED LIGHTING UPGRADE - 2024
Comprehensive LED lighting replacement throughout designated interior and exterior areas
Enhances energy efficiency, reduces maintenance costs, and improves overall illumination quality
EXTERIOR BUILDING PAINTING - 2024
Full exterior repainting completed in 2024
RESTROOM RENOVATIONS - 2024
Upgrades include new masonry, plumbing, electrical, and doors
PARKING LOT IMPROVEMENTS - 2025 (AND SCHEDULED IN 2026)
3” asphalt patching across targeted areas of the lot
NEW ROOFING SYSTEM INSTALLED IN PHASES 2019-2022
A new roofing system was installed in 2022, providing long-term protection and extending the useful life of the building envelope.
REFRIGERATION COIL REPLACEMENTS
AMMONIA PIPING & MECHANICAL SYSTEMS UPGRADES
A substantial modernization of the facility’s ammonia refrigeration infrastructure has been completed. These
improvements materially reduce maintenance exposure, enhance safety, and extend the operational lifespan of
critical refrigeration systems.
Installation and testing of new roof-mounted ammonia mains
Relocation of ammonia piping to the roof
Replacement and insulation of valve groups serving multiple rooms
Hot gas system enhancements
Full system commissioning, and removal of legacy piping
Additional upgrades included replacement of ammonia control systems, NH3 alarm panels, and purging equipment.
REFRIGERATION COIL REPLACEMENTS
New evaporator coils were installed in key tenant spaces, including replacement of coils serving Room 4 and the citrimex space. Work included electrical finish, system startup, and removal of obsolete equipment. These upgrades improve system performance, reduce maintenance requirements, and support tenant operations.
Faits sur la propriété
| Type de vente | Investissement | Aire du bâtiment louable | 190 540 pi² |
| Taux de capitalisation | 7,21% | Nombre d’étages | 1 |
| Type de propriété | Industriel | Année de construction/rénovation | 1967/2025 |
| Sous-type de propriété | Entrepot de réfrigération | Ratio de stationnement | 1,05/1 000 pi² |
| Classe d’immeuble | B | Effacer hauteur du plafond | 19’ |
| Taille du lot | 9,70 AC | ||
| Zonage | I-3 - I-3 | ||
| Type de vente | Investissement |
| Taux de capitalisation | 7,21% |
| Type de propriété | Industriel |
| Sous-type de propriété | Entrepot de réfrigération |
| Classe d’immeuble | B |
| Taille du lot | 9,70 AC |
| Aire du bâtiment louable | 190 540 pi² |
| Nombre d’étages | 1 |
| Année de construction/rénovation | 1967/2025 |
| Ratio de stationnement | 1,05/1 000 pi² |
| Effacer hauteur du plafond | 19’ |
| Zonage | I-3 - I-3 |
Commodités
- Chambres de congélation
- Climatisation
Services publics
- Gaz - Naturel
- Eau - Eau de ville
- Égout - Égout de la ville
- Chauffage - Gaz
Impôts fonciers
| Numéro de lot | 49-11-17-102-013.000-900 | Évaluation des bâtiments | 3 210 244 $ CAD |
| Évaluation du terrain | 771 153 $ CAD | Évaluation totale | 3 981 397 $ CAD |
Impôts fonciers
Numéro de lot
49-11-17-102-013.000-900
Évaluation du terrain
771 153 $ CAD
Évaluation des bâtiments
3 210 244 $ CAD
Évaluation totale
3 981 397 $ CAD
1 de 25
Vidéos
Visite extérieure 3D Matterport
Visite 3D Matterport
Photos
Vue depuis la rue
Rue
Carte