Partager cette annonce

Message

926 caractères restants

Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.

Votre courriel a été envoyé.

Toujours intéressé ?

Communiquez avec les courtiers pour obtenir plus d’informations sur cette propriété

Certaines informations ont été traduites automatiquement.

Faits saillants de l'investissement

  • 18" Natural Gas Line
  • 1 Mile of SR 60 Frontage
  • Fiber Optic Connectivity
  • TECO Confirmed Power
  • CSX Rail Access

Résumé de l'annonce

Size: 1,000± acres; divisible to parcels of 150± acres or larger
Zoning: PD (Planned Development)
Power: TECO
Rail Access: CSX rail adjoins the property
Port Access: Approximately 15 miles from Port Tampa Bay
Targeted Uses: Manufacturing and assembly, logistics and distribution, retail, and medical/office
Frontage: More than one mile along SR 60
Road Improvements: Planned SR 60 widening project
Site Access: Additional traffic signal pending applicable approvals
Energy Uses: Approved for alternative energy production

Faits sur la propriété

Type de vente Investissement ou propriétaire utilisateur
Nombre de lots 1
Type de propriété Terrain
Sous-type de propriété Terrain industriel
Utilisation proposée
Commercial
  • Industriel
  • Commerce de détail
  • Bureau
  • Services hôteliers
  • Grand magasin
  • Distribution
  • Soins de santé
  • Hôtel
  • Parc industriel
  • Médical
  • Centre de voisinage
  • Centre commercial géant
  • Réfrigération/Chambre froide
  • Entrepôt de détail
  • Terminal routier
  • Entrepôt
Taille totale du lot 1 000,00 AC
Zonage PD - The PD (Planned Development) zoning supports unified, large-scale mixed-use development with flexible concept plans responsive to market conditions.

1 Lot disponible

Lot

Taille du lot 1 000,00 AC

E 1/2 LESS SR 60 AND S 3/4 OF W 1/2 LESS RR R/W'S LESS THAT PART LYING WITHIN FOLL DESC PARCEL COMM AT SW COR OF N 1/2 OF NW

Description

University Energy Park presents a rare opportunity to acquire approximately 1,000 acres of large-scale, entitled development land within Hillsborough County’s Urban Service Area. Located at 4145 E State Road 60 in the Tampa MSA, the property offers more than one mile of frontage along SR 60 and is positioned for advanced manufacturing, logistics, distribution, institutional, office, medical, hospitality, retail, and related commercial development. The approved entitlements support more than 6.1 million square feet of industrial, manufacturing, office, warehousing, and distribution uses, plus up to 350,000 square feet of retail, hospitality, medical office, and other commercial uses. The property is also approved for alternate energy production, providing additional flexibility for solar and other energy-related applications. Ownership preference is to transact on the entire site, although they may consider subdividing the site into parcels of approximately 150 acres or larger. University Energy Park is distinguished by an infrastructure profile designed to support large-scale industrial and high-demand users. An 18-inch Florida Gas Transmission high-pressure natural gas pipeline traverses the property, while TECO high-voltage transmission infrastructure is adjacent to the site. Multiple long-haul and metro fiber networks are also adjacent along the SR 60 and CSX corridors, providing access to diverse, scalable connectivity options. A CSX rail line adjoins and crosses portions of the property, creating the potential to reestablish spur connectivity for rail-served users, subject to CSX coordination and applicable approvals. The site also provides convenient connectivity to I-4, I-75, Port Tampa Bay, Tampa International Airport, and Lakeland Linder International Airport. The property currently benefits from two traffic signals serving the site which would further enhance access and traffic circulation. The planned widening of SR 60 is expected to provide additional long-term capacity along this growing industrial and employment corridor. With campus-scale acreage, flexible entitlements, multimodal transportation connectivity, utility access, fiber adjacency, and multiple energy options, University Energy Park offers a highly differentiated development platform for investors, master developers, manufacturers, logistics operators, and other large-scale occupiers.

Inaccessible à pied
10/100
Exceptionnellement adapté aux voitures
100/100
Plutôt accessible en vélo
40/100

Impôts fonciers

Impôts fonciers

Numéros de lot
Plusieurs
  • U-34-29-21-ZZZ-000004-20150.0
  • U-28-29-21-ZZZ-000004-13680.1
  • U-33-29-21-ZZZ-000004-19470.0
  • U-28-29-21-ZZZ-000004-13680.0
  • U-27-29-21-ZZZ-000004-13630.0
Évaluation du terrain
139 $ CAD
Évaluation des bâtiments
0 $ CAD
Évaluation totale
1 325 948 $ CAD
  • ID d’inscription: 40193792

  • Date de mise sur le marché: 2026-04-17

  • Dernière mise à jour:

  • Adresse: 4145 E State Rd 60, Dover, FL 33527

Lien copié
Votre compte LoopNet a été créé !

Veuillez partager vos commentaires

Nous vous invitons à nous faire part de vos commentaires sur la façon dont nous pouvons améliorer LoopNet afin de mieux répondre à vos besoins.
X
{{ getErrorText(feedbackForm.starRating, "Ce notation") }}
255 Limite de caractères ({{ remainingChars() }} caractèrecaractères restantsur)
{{ getErrorText(feedbackForm.msg, "Ce notation") }}
{{ getErrorText(feedbackForm.fname, "Ce prénom") }}
{{ getErrorText(feedbackForm.lname, "Ce nom") }}
{{ getErrorText(feedbackForm.phone, "Ce numéro de téléphone") }}
{{ getErrorText(feedbackForm.phonex, "Cette extension de téléphone") }}
{{ getErrorText(feedbackForm.email, "Cet email") }}