Votre courriel a été envoyé.
Morgan Lakes Transload Facility 421 Morgan Lakes Industrial blvd 115 500 pi² d'espace disponible • Industriel • 4 étoiles • Pooler, GA 31322



Certaines informations ont été traduites automatiquement.
FAITS SAILLANTS
- Stationnement des remorques
- Terminal
CARACTÉRISTIQUES
TOUS LES ESPACES DISPONIBLES(1)
Afficher les taux de location en
- ESPACE
- TAILLE
- TERME
- TAUX DE LOCATION
- UTILISATION DE L’ESPACE
- ÉTAT
- DISPONIBLE
115,500 square foot transload facility featuring 120 dock high doors and 335 concrete trailer spaces. Freespan bays, concrete tilt up construction, cross-dock configuration with 24' clear height and 185' truck court depth. 102 auto parking spaces with security fence. Facility is located 9.5 miles from the Garden City Terminal and 15.1 miles from the Ocean Terminal (both via Jimmy Deloach Parkway). Drive times: Atlanta (3.5 hours), Jacksonville (2.0 hours), Charleston (2.0 hours). Move-in ready. Adjacent gravel yard is also available. Gravel yard is capable of parking 371 trailers or can accommodate additional build-to-suit requirements.
- Comprend 2 500 pi² d’espace de bureau dédié
- Espace en excellent état
- Entreposage sécurisé
- 1 accès plain-pied
- 120 quais de chargement
- Cour
| Espace | Taille | Terme | Taux de location | Utilisation de l’espace | État | Disponible |
| 1er étage | 115 500 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | construction complète | Maintenant |
1er étage
| Taille |
| 115 500 pi² |
| Terme |
| Négociable |
| Taux de location |
| Sur demande Sur demande Sur demande Sur demande |
| Utilisation de l’espace |
| Industriel |
| État |
| construction complète |
| Disponible |
| Maintenant |
1er étage
| Taille | 115 500 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| État | construction complète |
| Disponible | Maintenant |
115,500 square foot transload facility featuring 120 dock high doors and 335 concrete trailer spaces. Freespan bays, concrete tilt up construction, cross-dock configuration with 24' clear height and 185' truck court depth. 102 auto parking spaces with security fence. Facility is located 9.5 miles from the Garden City Terminal and 15.1 miles from the Ocean Terminal (both via Jimmy Deloach Parkway). Drive times: Atlanta (3.5 hours), Jacksonville (2.0 hours), Charleston (2.0 hours). Move-in ready. Adjacent gravel yard is also available. Gravel yard is capable of parking 371 trailers or can accommodate additional build-to-suit requirements.
- Comprend 2 500 pi² d’espace de bureau dédié
- 1 accès plain-pied
- Espace en excellent état
- 120 quais de chargement
- Entreposage sécurisé
- Cour
APERÇU DE LA PROPRIÉTÉ
Installation de transbordement de 115 500 pieds carrés comprenant 120 portes hautes de quai et 335 emplacements pour remorques en béton. Baies à espacement libre, construction inclinable en béton, configuration transversale avec hauteur libre de 24 pi et profondeur de terrain de camion de 185 pi. 102 places de stationnement pour voitures avec clôture de sécurité. L'installation est située à 9,5 milles du terminal Garden City et à 15,1 milles du terminal Ocean Terminal (les deux via la promenade Jimmy Deloach). Temps de conduite : Atlanta (3,5 heures), Jacksonville (2,0 heures), Charleston (2,0 heures). Prêt pour l'emménagement. Une cour de gravier adjacente est également disponible. La cour de triage peut stationner 371 remorques ou accueillir d'autres constructions sur mesure.
FAITS SUR L’INSTALLATION TERMINAL ROUTIER
Présenté par
Morgan Lakes Transload Facility | 421 Morgan Lakes Industrial blvd
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.



