Votre courriel a été envoyé.
438 S Callaghan Rd
San Antonio, TX 78227
Westport Industrial Park Phase II · Industriel Propriété À louer
·
187 200 pi²


Certaines informations ont été traduites automatiquement.
Faits saillants du parc
- Breaking ground Q4 2026, delivering Q4 2027 within a 17.02-acre industrial park.
- 23 dock-high doors, four drive-in ramps, and 130' truck courts with trailer storage.
- Strategic location near Loop 1604, I-410, US-90, TX-151, and major distribution networks.
- Two ±93,600 SF buildings featuring 24' clear heights and ESFR fire protection.
- Robust infrastructure with 3-phase electrical service and AT&T fiber connectivity.
- Proximity to Amazon, Microsoft, FedEx, Boeing, and other regional employers.
Faits sur le parc
| Superficie totale disponible | 187 200 pi² | Type de parc | Parc industriel |
| Min. divisible | 18 720 pi² |
| Superficie totale disponible | 187 200 pi² |
| Min. divisible | 18 720 pi² |
| Type de parc | Parc industriel |
Aperçu du parc
Westport Phase II offers approximately 187,200 square feet of premier industrial space within a fully entitled 17.02-acre park. The development will commence in Q4 2026 with completion slated for Q4 2027, providing state-of-the-art features designed for modern distribution and manufacturing operations. Each ±93,600 SF building delivers exceptional functionality with 24-foot clear heights, ESFR fire protection, and 23 dock-high doors complemented by four drive-in ramps. Clerestory windows introduce natural light to the interior, while robust 3-phase power and AT&T fiber support advanced operational requirements. The property is equipped with expansive 130-foot truck courts and additional trailer parking, ensuring efficient logistics flow. Strategically positioned near Loop 1604, I-410, US-90, and TX-151, the site provides unmatched connectivity to key regional corridors. Nearby tenants include major corporate names such as Amazon, Microsoft, Boeing, and FedEx, reinforcing the area’s identity as a logistics hub. Full utility infrastructure is already in place, including a 12-inch water main and 2-inch sewer force main, reducing time-to-occupancy for prospective users.
