Partager cette annonce

Message

915 caractères restants

Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.

Votre courriel a été envoyé.

Toujours intéressé ?

Communiquez avec les courtiers pour obtenir plus d’informations sur cette propriété

Certaines informations ont été traduites automatiquement.

Faits saillants de l'investissement

  • Brand-New Construction - Turnkey asset with zero deferred maintenance or near-term capital expenditure requirements.
  • Built-In Rent Growth - 3% annual escalations provide durable income growth and inflation protection.
  • Compelling Airport Fundamentals-Active regional airport with training operations, aerial firefighting, National Guard activity, and strong GA culture.
  • Significant Pent-Up Demand-35+ aircrafts on the waitlist plus strong off-market leasing interest; national undersupply of General Aviation hangars.
  • Long-Term Ground Lease w/ Public Airport at Below Market Rates - 20- year initial term plus 20-year option.
  • Supply-Constrained, FAA-Regulated Asset Class

Résumé de l'annonce

This rare offering consists of two newly constructed, on-airport T-hangar buildings totaling 18 units and approximately 21,000 square feet at Columbia Gorge Regional Airport (KDLS). Eleven standard hangar bays measure 42’ W x 25’ D, and seven corner units include approximately 300 additional square feet. The hangars feature sliding doors and offer direct apron and taxiway access. The asset benefits from a low-cost maintenance and operating structure, with some tenants responsible for utilities, insurance, CAM, leasehold taxes, and administrative costs, resulting in low ownership overhead.
Demand is both local and structural. Nationally, industry surveys indicate 71% of general aviation airports report shortages of individual hangars, while 55% report having land but lacking the resources to deliver new supply—creating a persistent imbalance between demand and inventory. This supply constraint is reinforced by public-airport governance and FAA policy frameworks that prioritize aeronautical infrastructure improvements over hangar construction.
Locally, KDLS and surrounding airports maintain formal waiting list processes, and aviation publications report approximately 50 pilots waiting for hangar space alongside significant interest in the 18-unit development—supporting rapid stabilization. T-hangars on publicly owned airports rarely come to market due to limited new construction, and increasing rental rates combined with long-term, low-cost ground leases position the asset for steady revenue growth over time.

Faits sur la propriété

Prix 2 998 468 $ CAD
Prix par pi² 142,78 $ CAD
Type de vente Investissement
Type de propriété Industriel
Classe d’immeuble B
Aire du bâtiment louable 21 000 pi²
Nombre d’étages 1
Année de construction 2025
Zone de développement économique Oui

Impôts fonciers

Impôts fonciers

Numéro de lot
02133400001200
Évaluation du terrain
305 381 $ CAD
Évaluation des bâtiments
2 926 199 $ CAD
Évaluation totale
3 231 580 $ CAD
  • ID d’inscription: 39715310

  • Date de mise sur le marché: 2026-03-09

  • Dernière mise à jour:

  • Adresse: 45 Airport Way, Dallesport, WA 98617

Lien copié
Votre compte LoopNet a été créé !

Veuillez partager vos commentaires

Nous vous invitons à nous faire part de vos commentaires sur la façon dont nous pouvons améliorer LoopNet afin de mieux répondre à vos besoins.
X
{{ getErrorText(feedbackForm.starRating, "Ce notation") }}
255 Limite de caractères ({{ remainingChars() }} caractèrecaractères restantsur)
{{ getErrorText(feedbackForm.msg, "Ce notation") }}
{{ getErrorText(feedbackForm.fname, "Ce prénom") }}
{{ getErrorText(feedbackForm.lname, "Ce nom") }}
{{ getErrorText(feedbackForm.phone, "Ce numéro de téléphone") }}
{{ getErrorText(feedbackForm.phonex, "Cette extension de téléphone") }}
{{ getErrorText(feedbackForm.email, "Cet email") }}