Se Connecter/S’inscrire
Votre courriel a été envoyé.
2 T-Hangar Buildings | 45 Airport Way 45 Airport Way 21 000 pi² 100% Loué Industriel Immeuble Dallesport, WA 98617 2 998 468 $ CAD (142,78 $ CAD/pi²)

Certaines informations ont été traduites automatiquement.
Faits saillants de l'investissement
- Brand-New Construction - Turnkey asset with zero deferred maintenance or near-term capital expenditure requirements.
- Built-In Rent Growth - 3% annual escalations provide durable income growth and inflation protection.
- Compelling Airport Fundamentals-Active regional airport with training operations, aerial firefighting, National Guard activity, and strong GA culture.
- Significant Pent-Up Demand-35+ aircrafts on the waitlist plus strong off-market leasing interest; national undersupply of General Aviation hangars.
- Long-Term Ground Lease w/ Public Airport at Below Market Rates - 20- year initial term plus 20-year option.
- Supply-Constrained, FAA-Regulated Asset Class
Résumé de l'annonce
This rare offering consists of two newly constructed, on-airport T-hangar buildings totaling 18 units and approximately 21,000 square feet at Columbia Gorge Regional Airport (KDLS). Eleven standard hangar bays measure 42’ W x 25’ D, and seven corner units include approximately 300 additional square feet. The hangars feature sliding doors and offer direct apron and taxiway access. The asset benefits from a low-cost maintenance and operating structure, with some tenants responsible for utilities, insurance, CAM, leasehold taxes, and administrative costs, resulting in low ownership overhead.
Demand is both local and structural. Nationally, industry surveys indicate 71% of general aviation airports report shortages of individual hangars, while 55% report having land but lacking the resources to deliver new supply—creating a persistent imbalance between demand and inventory. This supply constraint is reinforced by public-airport governance and FAA policy frameworks that prioritize aeronautical infrastructure improvements over hangar construction.
Locally, KDLS and surrounding airports maintain formal waiting list processes, and aviation publications report approximately 50 pilots waiting for hangar space alongside significant interest in the 18-unit development—supporting rapid stabilization. T-hangars on publicly owned airports rarely come to market due to limited new construction, and increasing rental rates combined with long-term, low-cost ground leases position the asset for steady revenue growth over time.
Demand is both local and structural. Nationally, industry surveys indicate 71% of general aviation airports report shortages of individual hangars, while 55% report having land but lacking the resources to deliver new supply—creating a persistent imbalance between demand and inventory. This supply constraint is reinforced by public-airport governance and FAA policy frameworks that prioritize aeronautical infrastructure improvements over hangar construction.
Locally, KDLS and surrounding airports maintain formal waiting list processes, and aviation publications report approximately 50 pilots waiting for hangar space alongside significant interest in the 18-unit development—supporting rapid stabilization. T-hangars on publicly owned airports rarely come to market due to limited new construction, and increasing rental rates combined with long-term, low-cost ground leases position the asset for steady revenue growth over time.
Faits sur la propriété
| Prix | 2 998 468 $ CAD | Aire du bâtiment louable | 21 000 pi² |
| Prix par pi² | 142,78 $ CAD | Nombre d’étages | 1 |
| Type de vente | Investissement | Année de construction | 2025 |
| Type de propriété | Industriel | Zone de développement économique |
Oui
|
| Classe d’immeuble | B |
| Prix | 2 998 468 $ CAD |
| Prix par pi² | 142,78 $ CAD |
| Type de vente | Investissement |
| Type de propriété | Industriel |
| Classe d’immeuble | B |
| Aire du bâtiment louable | 21 000 pi² |
| Nombre d’étages | 1 |
| Année de construction | 2025 |
| Zone de développement économique |
Oui |
1 1
Impôts fonciers
| Numéro de lot | 02133400001200 | Évaluation des bâtiments | 2 926 199 $ CAD |
| Évaluation du terrain | 305 381 $ CAD | Évaluation totale | 3 231 580 $ CAD |
Impôts fonciers
Numéro de lot
02133400001200
Évaluation du terrain
305 381 $ CAD
Évaluation des bâtiments
2 926 199 $ CAD
Évaluation totale
3 231 580 $ CAD
1 de 2
Vidéos
Visite extérieure 3D Matterport
Visite 3D Matterport
Photos
Vue depuis la rue
Rue
Carte
1 de 1
Présenté par
2 T-Hangar Buildings | 45 Airport Way | 45 Airport Way
Vous êtes déjà membre? Connectez-vous
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.
