Se Connecter/S’inscrire
Votre courriel a été envoyé.
480 Pat Ave 16 000 pi² 100% Loué 4-Étoile Industriel Immeuble Overton, NV 89040 1 511 092 $ CAD (94,44 $ CAD/pi²)



Certaines informations ont été traduites automatiquement.
Résumé de l'annonce
All buildings are of conventional metal construction and have been occupied and maintained continuously since construction. The approximate dimensions are shown in the attached maps. All are single story. A chain link fence surrounds the active half of the property (buildings and pond), while a small fence surrounds the remaining, unused half of the property.
The pond is double, High Density Polyethylene (HDPE) membrane lined, with a leak detection monitoring well. The pond is fully approved, and permitted by the Nevada Department of Environmental protection (NDEP). The NDEP permit number is: NS0060044 (or NEV60044 it was changed slightly some years ago). The permit limit is 5,000 gallons per day (average). Complete records, testing results, etc. are available from the date of construction in roughly 1986. In January, 2000, the original PVC liners were replaced with HDPE liners, again with NDEP approval and supervision. Quarterly and annual testing has been done and reported to the NDEP since construction.
Since construction the plant has been used to evaporate waste water from the washing and dyeing of domestic turkey feathers. All of the dyes and chemicals that have been used since construction are NON TOXIC, and NON HAZARDOUS. None of the dyes used contain heavy metals. Complete test results and process details are available from the NDEP or from us.’
The electric data is taken from the only electric input to the property. 1200 amps, 240 volts, 3 phase is the total for the input.
The pond is double, High Density Polyethylene (HDPE) membrane lined, with a leak detection monitoring well. The pond is fully approved, and permitted by the Nevada Department of Environmental protection (NDEP). The NDEP permit number is: NS0060044 (or NEV60044 it was changed slightly some years ago). The permit limit is 5,000 gallons per day (average). Complete records, testing results, etc. are available from the date of construction in roughly 1986. In January, 2000, the original PVC liners were replaced with HDPE liners, again with NDEP approval and supervision. Quarterly and annual testing has been done and reported to the NDEP since construction.
Since construction the plant has been used to evaporate waste water from the washing and dyeing of domestic turkey feathers. All of the dyes and chemicals that have been used since construction are NON TOXIC, and NON HAZARDOUS. None of the dyes used contain heavy metals. Complete test results and process details are available from the NDEP or from us.’
The electric data is taken from the only electric input to the property. 1200 amps, 240 volts, 3 phase is the total for the input.
Faits sur la propriété
| Prix | 1 511 092 $ CAD | Taille du lot | 7,96 AC |
| Prix par pi² | 94,44 $ CAD | Aire du bâtiment louable | 16 000 pi² |
| Type de vente | Investissement | Nombre d’étages | 1 |
| Type de propriété | Industriel | Année de construction | 1987 |
| Classe d’immeuble | B | ||
| Zonage | M1 | ||
| Prix | 1 511 092 $ CAD |
| Prix par pi² | 94,44 $ CAD |
| Type de vente | Investissement |
| Type de propriété | Industriel |
| Classe d’immeuble | B |
| Taille du lot | 7,96 AC |
| Aire du bâtiment louable | 16 000 pi² |
| Nombre d’étages | 1 |
| Année de construction | 1987 |
| Zonage | M1 |
Impraticable à pied
10/100
Exceptionnellement facile d’accès en voiture
90/100
Assez praticable en vélo
20/100
Impôts fonciers
| Numéro de lot | 070-01-101-019 | Évaluation des bâtiments | 212 693 $ CAD |
| Évaluation du terrain | 76 933 $ CAD | Évaluation totale | 289 625 $ CAD |
Impôts fonciers
Numéro de lot
070-01-101-019
Évaluation du terrain
76 933 $ CAD
Évaluation des bâtiments
212 693 $ CAD
Évaluation totale
289 625 $ CAD
1 de 117
Vidéos
Visite extérieure 3D Matterport
Visite 3D Matterport
Photos
Vue depuis la rue
Rue
Carte
Présenté par
480 Pat Ave
Vous êtes déjà membre? Connectez-vous
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.

