Votre courriel a été envoyé.
Certaines informations ont été traduites automatiquement.
Faits saillants de l'investissement
- 0.7 AC Infill | MX-N Zoning (by-right) - no rezoning required; flexible residential development
- Transit-driven upside - within 1/2 mile of G Line (Gold Strike Station)
- Utilities in place - 12" main (W 60th) + 8" main (Ames St) with individual tap availability
- No density cap | 35' height limit - supports townhome or single-family product
- Fee advantage - school land dedication fees waived (park fees apply)
Résumé de l'annonce
The site benefits from a clearly defined administrative approval path, as outlined in the City of Arvada’s pre-application review, allowing for a Site Plan and Minor Subdivision to be approved without a lengthy public process. This streamlined entitlement framework, paired with existing utility infrastructure including nearby water and sewer connections, positions the property as a low-friction development play in a supply-constrained submarket.
Located within a half mile of the RTD G Line Gold Strike Station and directly across from the Clear Creek trail system, the property offers strong transit-oriented and lifestyle-driven appeal. Immediate access to I-70 and Highway 76 provides connectivity to Downtown Denver, Boulder, and the broader Front Range, supporting long-term residential demand. With favorable development economics, including waived school land dedication fees, the site is well-positioned for developers seeking an efficient path to deliver attainable housing in an established infill location.
Salle de données Cliquez ici pour accéder à
- Miscellaneous
Faits sur la propriété
1 Lot disponible
Lot
| Prix | 950 600 $ CAD | Taille du lot | 0,70 AC |
| Prix par AC | 1 358 000,04 $ CAD |
| Prix | 950 600 $ CAD |
| Prix par AC | 1 358 000,04 $ CAD |
| Taille du lot | 0,70 AC |
0.7-acre infill parcel zoned MX-N with no density cap, allowing flexible residential development. By-right zoning with a streamlined approval path, utilities in place, and walkable access to RTD G Line and Clear Creek Trail.
Description
0.7-acre infill development opportunity in Arvada with by-right MX-N (Mixed Use – Neighborhood) zoning—no rezoning required. The district allows for a range of residential product types, including townhomes and single-family, with no stated residential density cap and a maximum building height of 35 feet. The City of Arvada pre-application review outlines a clear path to development, with a Site Plan and Minor Subdivision eligible for administrative approval, streamlining the entitlement process. Development Advantages: * Transit-Oriented Location: Within ½ mile of the Gold Strike G Line Station * Fee Benefit: Exempt from school land dedication fees (park fees still apply) * Utilities in Place: * 12” water main in W 60th Ave * 8” water main in Ames Street (eligible for individual taps) * 8” sanitary line available for connection * No Annexation / Rezoning Required Site & Planning Considerations: * Approximately 0.7 acres * Townhome product supported (alley-loaded configuration required) * 50% build-to requirement depending on product type * 5% amenitized open space required * Setbacks generally 10’–15’ depending on orientation * Right-of-way dedication required along W 60th Ave * Standard stormwater and utility coordination requirements apply Location: Strategically positioned along the W 60th corridor with direct access to I-70, Hwy 76, Downtown Denver, Boulder, and the mountains. The property is within walking distance to the RTD G Line and directly across from the Clear Creek trail system, supporting long-term residential demand and walkability. Supporting Materials: City of Arvada Pre-Application Summary, zoning standards, and development guidance are available in the document package.
Impôts fonciers
| Numéro de lot | 39-121-20-008 | Évaluation des bâtiments | 26 450 $ CAD |
| Évaluation du terrain | 28 055 $ CAD | Évaluation totale | 54 505 $ CAD |
Impôts fonciers
Présenté par
5375 W 60th Ave
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.



