Votre courriel a été envoyé.
Coney Island Industrial Park 550 Coney Island Dr 30 013–84 912 pi² d'espace disponible • Industriel • Sparks, NV 89431

Certaines informations ont été traduites automatiquement.
FAITS SAILLANTS
- The Coney Island Industrial Park is within 6 miles of the Reno/ Tahoe International Airport.
- Rail cargo transports are easily reachable with the Sparks rail line less than 5 miles away.
- The nearest freight port, the Port of Stockton, is reachable within a day's drive being less than 190 miles southwest.
- Access to Interstates 80 and 580 enable convenient regional accessibility.
CARACTÉRISTIQUES
TOUS LES ESPACES DISPONIBLES(2)
Afficher les taux de location en
- ESPACE
- TAILLE
- TERME
- TAUX DE LOCATION
- UTILISATION DE L’ESPACE
- ÉTAT
- DISPONIBLE
Suite 100 features a 24-foot clear height, six loading docks, 40-by-50-foot column spacing, LED warehouse lighting, 1,503 square feet of office space, and 600-amp, 480-volt, 3-phase power.
- Comprend 1 503 pi² d’espace de bureau dédié
- 6 quais de chargement
Suite 102 features warehouse space equipped with five loading docks, 1,538 square feet of office space, a 24-foot clear height, LED warehouse lighting, 40-by-50-foot column spacing, and 400-amp, 480-volt, 3-phase power.
- Comprend 1 538 pi² d’espace de bureau dédié
- 5 quais de chargement
- 1 accès plain-pied
| Espace | Taille | Terme | Taux de location | Utilisation de l’espace | État | Disponible |
| 1er étage - 100 | 54 899 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | - | Maintenant |
| 1er étage - 102 | 30 013 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Industriel | - | Maintenant |
1er étage - 100
| Taille |
| 54 899 pi² |
| Terme |
| Négociable |
| Taux de location |
| Sur demande Sur demande Sur demande Sur demande |
| Utilisation de l’espace |
| Industriel |
| État |
| - |
| Disponible |
| Maintenant |
1er étage - 102
| Taille |
| 30 013 pi² |
| Terme |
| Négociable |
| Taux de location |
| Sur demande Sur demande Sur demande Sur demande |
| Utilisation de l’espace |
| Industriel |
| État |
| - |
| Disponible |
| Maintenant |
1er étage - 100
| Taille | 54 899 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| État | - |
| Disponible | Maintenant |
Suite 100 features a 24-foot clear height, six loading docks, 40-by-50-foot column spacing, LED warehouse lighting, 1,503 square feet of office space, and 600-amp, 480-volt, 3-phase power.
- Comprend 1 503 pi² d’espace de bureau dédié
- 6 quais de chargement
1er étage - 102
| Taille | 30 013 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Industriel |
| État | - |
| Disponible | Maintenant |
Suite 102 features warehouse space equipped with five loading docks, 1,538 square feet of office space, a 24-foot clear height, LED warehouse lighting, 40-by-50-foot column spacing, and 400-amp, 480-volt, 3-phase power.
- Comprend 1 538 pi² d’espace de bureau dédié
- 1 accès plain-pied
- 5 quais de chargement
APERÇU DE LA PROPRIÉTÉ
Le parc industriel de Coney Island offre à ses locataires l'accès à une alimentation électrique triphasée, des zones de chargement spacieuses, des espaces de bureau dédiés, une hauteur libre de 24 pieds et un éclairage LED partout. Les espaces d'entrepôt à louer de Link Logistics à Reno permettent aux entreprises de se connecter à un aéroport international, un corridor ferroviaire majeur et un réseau d'autoroutes bien intégré pour transporter les marchandises rapidement et facilement. La position stratégique de Reno place 11 États à une journée de route, avec le port très actif d'Oakland à seulement quatre heures de distance.
FAITS SUR L’INSTALLATION ENTREPÔT
SÉLECTIONNER DES LOCATAIRES
- ÉTAGE
- NOM DU LOCATAIRE
- SECTEUR
- 1ᵉʳ
- Britevision
- Fabrication
- 1ᵉʳ
- Paterson Pacific Paper
- Fabrication
- 1ᵉʳ
- Sierra Nevada Construction
- Construction
Présenté par
Coney Island Industrial Park | 550 Coney Island Dr
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.


