Votre courriel a été envoyé.
Building 2 65 Chestnut St 53 896–127 371 pi² d'espace disponible • Flex • 4 étoiles • Shrewsbury, MA 01545



Certaines informations ont été traduites automatiquement.
Faits saillants
- The property is being transformed into a newly renovated business park situated on a 35-acre site.
- Clear heights range from 21 feet 6 inches to 28 feet 4 inches.
Caractéristiques
Tous les espaces disponibles(1)
Afficher les taux de location en
- Espace
- Taille
- Terme
- Taux de location
- Utilisation de l’espace
- Aménagement
- Disponible
- 8 quais de chargement
| Espace | Taille | Terme | Taux de location | Utilisation de l’espace | Aménagement | Disponible |
| 1er étage | 53 896 à 127 371 pi² | Négociable | Sur demande Sur demande Sur demande Sur demande | Flex | - | 2027-07-01 |
1er étage
| Taille |
| 53 896 à 127 371 pi² |
| Terme |
| Négociable |
| Taux de location |
| Sur demande Sur demande Sur demande Sur demande |
| Utilisation de l’espace |
| Flex |
| Aménagement |
| - |
| Disponible |
| 2027-07-01 |
1er étage
| Taille | 53 896 à 127 371 pi² |
| Terme | Négociable |
| Taux de location | Sur demande |
| Utilisation de l’espace | Flex |
| Aménagement | - |
| Disponible | 2027-07-01 |
- 8 quais de chargement
Aperçu de la propriété
127,371 square feet available within a campus at the crossroads of Central Massachusetts, a large-scale platform ideal for advanced manufacturing, first-class, high-tech life science and logistics users seeking a complete real estate solution. Building 2 at 65 Chestnut Street is currently a two-story 204,000 square foot flex building. The plan is to create a new entrance with employee parking on the north side of the property that will sit above the floor below by removing a majority of the second floor. New docks will be installed at the north and south sides of the building. Clear heights will range from 21' 6" to 28' 4" with clear span ranging from 55' 4" by 237' in one section to 83' by 375" in the other. The existing power to the entire site is 11,000 amps that is scalable to meet your clients' needs. ICP is starting the renovation in the summer of 2026 with a planned completion date of Q3 2027 - ready for a tenant's improvements.
Faits sur la propriété
Présenté par
Building 2 | 65 Chestnut St
Hmm, il semble y avoir eu une erreur lors de l’envoi de votre message. Veuillez réessayer.
Merci! Votre message a été envoyé.


